The Vietnam War: The Economic Liberalization Of Vietnam

Improved Essays
The country was first under the control of France in 1858, but in 1954 Vietnam declared its independence after World War 2. In 1954, the communist force of Vietnam won over France’s control. Vietnam was initially divided from south and north territory, with the US aiding the south territory of Vietnam. In 1974, Northern Vietnam eventually ran over the south territory, and finally uniting Vietnam as one. Vietnam was predominately a communist orientated country till 1986, when the “doi moi” renovation policy was enacted. The policy served as purpose to facilitate economic liberalization so Vietnam would have more competitive export driven industries. This policy nonetheless led Vietnam to more a capitalistic economic structure. The ethnic groups …show more content…
Steps 8 and 9 include registering with the local labor office to declare use of labor (Municipal Department for Labor, Invalids and Social Affairs) and registering employees with the Social Insurance Fund for the payment of health insurance and social insurance. Both of these steps take approximately 1 day each to complete. The 10th and final step would be to register for trade union with Vietnam General Confederation of Labor; this last step takes about a week to complete. The first step to obtain a construction permit is to obtain the certification of the designs from the Police Department for Fire Fighting and Fire Prevention of Ho Chi Minh City; this takes approximately 30 days to complete, and there is no charge. The second step would be to request and obtain construction permit from the (District) Department of Construction of Ho Chi Minh City; this takes about 30 days and costs VND 100,000. Afterwards, you would have to notify the Department of Construction about the commencement of construction and receive inspection, this takes about one day, and there is no charge associated. The 4th step would be to request and receive inspection from the municipality after completion of foundation …show more content…
The 9th step is to notify and receive inspection from the municipality after completion of building; this takes 1 day of no charge. The 10th step is to register the building at the Department of National Resources and Environment; this takes 30 days to complete with charges costing to approximately VND 9,842,025. There are six steps to get electricity for your business. The first step would be to apply for electricity connection and awaits clearance from Ho Chi Minh City Power Corporation (EVN HCMC); this takes about 30 days of no charge. The second step would be to obtain external inspection from Ho Chi Minh City Power Corporation (EVN HCMC); this takes 1 day of no charge. The third step would be to obtain design approval and excavation permit for the underground connection at the Traffic and Transport Department; this takes about 15 days of no charge. The 4th step would be to hire a private firm for the design and carrying out of the external works; this takes about 63 days to complete, and costs VND 544,000,000. The 5th step is to obtain a certification of the design of the substation from Fire Fighters prevention Department; this takes 30 days of no charge. The 6th and final step is to

Related Documents

  • Improved Essays

    Acct 311 Final Exam

    • 3194 Words
    • 13 Pages

    ACCT 311 Final Exam Click Link Below To Buy: http://hwaid.com/shop/acct-311-final-exam/ 1. XYZ Company sells appliance service contracts agreeing to repair appliances for a two-year period. XYZ’s past experience is that, of the total dollars spent for repairs on service contracts, 40% is incurred evenly during the first contract year and 60% evenly during the second contract year. Receipts from service contract sales for the two years ended December 31, year 2, are as follows: Year 1 $500,000 Year 2 $600,000 Receipts from contracts are credited to unearned service contract revenue. Assume that all contract sales are made evenly during the year.…

    • 3194 Words
    • 13 Pages
    Improved Essays
  • Improved Essays

    7.You will have 10 days to consult with your advocate and verify the legal validity of all the documentation. 8.Once happy and satisfied, then we will proceed to draw the mutual Agreement Draft. At this stage, you will have to pay 30% of the property cost. 9.If required, we will help you in arranging loans from reputable financial institutions. Generally, the loan will be arranged in a very short span of time.…

    • 1021 Words
    • 5 Pages
    Improved Essays
  • Improved Essays

    Earlier this year in August, Consumer Reports published an article looking at the math behind this claim and applying it to three houses of varying size, age, and geographic location. The analysis showed that the amount of money saved (or not saved) by installing a Tesla Solar Roof varied widely depending on factors such as these. For example, one house was built in 1850, in Salisbury, New York (Hope). This house installed 70% solar tiles and 30% non-solar tiles (Hope). It cost the homeowner $38,400 to install the roof and $7,000 to install one powerwall battery (Hope).…

    • 1557 Words
    • 7 Pages
    Improved Essays
  • Great Essays

    BIS 155 Final Exam Paper

    • 1643 Words
    • 7 Pages

    Write a formula as if it were in Cell G2 that calculates the union dues (if any) for the first employee. Write the formula. Part 4: Salaried and Exempt employees (Pay Codes E and S) are covered by the company’s health insurance. The deduction is $10.00 per week. Write a formula as if it were in Cell H2 that calculates the Insurance deduction (if any) for the first employee.…

    • 1643 Words
    • 7 Pages
    Great Essays
  • Great Essays

    Wild Eagle Spur Case Study

    • 3117 Words
    • 13 Pages

    In order to ensure reliability of the finances, these statements are prepared under the supervision of Ronel van Dijk, CA(SA) (Chief Financial Officer) and an internal audit will take place3. These internal auditors are appointed by the Audit Committee who are also responsible for ensuring that the internal auditors function independently and have the necessary authority and resources to discharge their duties3. For Wild Eagle Spur, the internal audit is conducted by someone from Spur’s head office in Cape Town. They receive two reports per month; one of these being an Operational Report. If the restaurant’s audit rating is below 68% then they have ten days to rectify the products or paperwork in question.…

    • 3117 Words
    • 13 Pages
    Great Essays
  • Improved Essays

    Picstop Swot Analysis

    • 853 Words
    • 4 Pages

    Orders given after 14.00 hrs Friday and Saturday or Sunday will be delivered on a Tuesday. EU (European Union Countries) - This service will be carried out by Royal Mail & national postal services & Courier Service. Please permit from up to 10 working days for this delivery…

    • 853 Words
    • 4 Pages
    Improved Essays
  • Improved Essays

    C) The monthly incentive will be given alongside the salary. To become eligible for the monthly incentive a recruiter need to meet the incentive criteria (Will be written in the Incentive Plan) D) The quarterly incentive will be paid only after 90 days. To become eligible for it, a Recruiter should retain minimum 6 joiners’ or if the billing value exceeds minimum 80K (Whichever is…

    • 800 Words
    • 4 Pages
    Improved Essays
  • Great Essays

    This may take at least a week for the accounting firm to prepare a report. Tax matters Statements These include copies of all federal, state, and local, income and franchise tax returns filed by Property in recent years. Hopefully either Seller or Seller’s accountants would be able to provide these documents. If not, no experts would likely be needed because I look up this information. Looking up this information by myself would take at least a day, and trying to gain them from Seller or Seller’s accountant could take up to a week, if the documents are able to be located.…

    • 1708 Words
    • 7 Pages
    Great Essays
  • Improved Essays

    is contemplating investment in a new concrete crushing machine in order to recycle rubble from demolished buildings into road chippings. It is estimate that the crushing machine will cost N210,000 payable immediately, have a useful life of 5 years with a residual value of N25,000. Net cash inflows for each of the next 5 years from the sale of recycled rubble are projected as: Year Net Cash flows 10% present value factors 15% present value factors. 1. 40,000 0.909 0.870 2.…

    • 1113 Words
    • 5 Pages
    Improved Essays
  • Great Essays

    Ladder Company Case Study

    • 965 Words
    • 4 Pages

    Since all customers wait an average of 1 hour of travel time whenever the service technician is free, this probability is actually the probability that a customer will have to wait more than 1 hour for a service technician to respond.) • Hours a week the technician is not on service calls (0.5380) x 40 hours = 21.5 hours • Total cost per hour for the service operation $155.93 (Since the average travel time is 1 hour for the service technician to reach the new customer's office, the total customer waiting time is 1.6082 + 1 = 2.6082 hours. Thus, the one technician is able to meet the company's 3-hour service guideline. The TC is $155.93 per hour. 5.…

    • 965 Words
    • 4 Pages
    Great Essays