Case Study On Job Shop Scheduling

Great Essays
CHAPTER1
INTRODUCTION

1.1 Introductory Remarks
In this chapter, the scheduling problems, their concept and theirdifferent types are briefly covered.A brief introduction to the role of schedulingis given.Description of JobShop Scheduling Problem (JSSP)is presented with its practical complication.Types of schedulingand objectives of the study are summarized. Also, A brief introduction about the plan of the project is given.Research layout at the end of the chapter is presented.
1.2Scheduling Problems
One of the most necessary and vital subject in planning and managingmanufacturing system is operations scheduling. Scheduling is the process of allocatingresources, (i.e. machines, people and others) over time to competitive activities (jobs,
…show more content…
In a easier version of this problem, flow shop scheduling[1,10], it is generally assumed that all jobs must be processed on all machines in the same machine order. A more complex case is represented by job shop scheduling; the jobs may be processed following different machine orders. There is no common path of movement of jobs from machine to machine. As mentioned by Zandieh et al [11], (Nowickiand Smatnicki,1996) and (Jain and Meeran, 1999), defined the JobShop Scheduling Problem (JSSP) by, is one of the hardest combinatorial optimization problems, as it is classified as NP-Hard problem andtherefore no deterministic algorithms can solve them in a reasonable amount of time. Job shop scheduling problem aims to find suitable sequencing of jobs on machines to optimize the performance …show more content…
However, most scheduling researchesare limited to a single objective, which is the optimization of makespan (the maximum completion time of all jobs). However, real-life scheduling problems often require a decision maker who considers a number of criteria before taking a decision. A solution that may appear optimal with respect to one given criterion may becomea poor candidate for some other criteria, like mean flow-time, total tardiness,and others. Therefore, the trade-offs involved in considering several different criteria provide useful insights for decision makers

Related Documents

  • Decent Essays

    Two methods used to schedule appointments would be scheduling matrix and double-booking. Scheduling matrix identifies a pattern of working and nonworking hours for a medical office. However with double-booking we are scheduling two patients at the same time for the same provider, in which the provider will have multiple patients at the same time. Three main points to verify with the payer before the patient arrives for their appointment will be, Co-pay, which it to verify what the patient will need to pay when they come to their appointment. We also need to verify if the insurance is in-network, which means if we are not in-network, the payer may reject payment or may not cover the same amount as if they were in-network.…

    • 154 Words
    • 1 Pages
    Decent Essays
  • Decent Essays

    Hrm/531 Week 2

    • 556 Words
    • 3 Pages

    2. Set up specific metrics based on your industry: The Company should be able to cut back the wastage of time to a certain extent and will be able to save money to a certain extent. 3. Perform regular post implementation results: The Company should check into the delivery history and check for any possible delays and should be determine if they were caused by system…

    • 556 Words
    • 3 Pages
    Decent Essays
  • Decent Essays

    EGT1 Task 1

    • 279 Words
    • 2 Pages

    The planner must be in close relation to the demand manager, supply manager, and the person managing inventory Feigin (2011). We understand that we are going to have to surrender time in effort to undergo the eight week implementation…

    • 279 Words
    • 2 Pages
    Decent Essays
  • Superior Essays

    Summary Goldratt

    • 1350 Words
    • 6 Pages

    Summary of Main themes In this book, one of the main themes that Goldratt seeks to expound on is the struggles that managers go through. In their work of ensuring that the supply chain runs smoothly, managers often have to deal with a hoist of operational, human resource and even social problems that make it difficult to achieve the set goals. This book gives the story of one Alex Rogo who is facing serious consequences if the manufacturing plant he manages does not improve within three months. Managers in different companies face this typical problem, as there is a lot of pressure from supervisors. .…

    • 1350 Words
    • 6 Pages
    Superior Essays
  • Superior Essays

    The goal of this report was to find a way to reduce queue build up during peak hours in order to minimize lost customers. Observational data was collected in order to establish an arrival rate and service rate during peak hours. Based on the data, calculations were computed as if the system ran during peak hours for the whole day. The calculations showed that the system would “explode” if the system was to be operational under these conditions.…

    • 1398 Words
    • 6 Pages
    Superior Essays
  • Decent Essays

    Week 4 Discussion Thread TOPIC What are some issues that might arise from using an open hours method of scheduling in a medical office? A medical office that operates with open hours for patient visits is open for specified hours during the day or evening. Patients may arrive at any time during those hours to be seen by the physician in the order of their arrival; there are no scheduled appointments.…

    • 251 Words
    • 2 Pages
    Decent Essays
  • Great Essays

    Tanglewood Case 2: Planning Human Resource (HR) planning is the process of forecasting Tanglewood’s future employment needs. Once the employment needs have been forecasted an action plan will be developed to ensure the filling of these needs in a way that aligns with the organization staffing strategy (Heneman, Judge, & Kammeyer-Mueller, 2006, p. 91). The plan will analyze the employment environment to determine how many employees will be needed in the future. Then an assessment of the availability of internal and external employees will be completed. The plan consists of five steps.…

    • 1150 Words
    • 5 Pages
    Great Essays
  • Improved Essays

    One of the most important tasks of a Manager or a Practice Manager is scheduling the staff members. Creating a work schedule requires meeting the needs of the facility, and at the same time fulfilling the wants and needs of the employees. The complexity in scheduling employees in a healthcare facility varies with size, how many patients who visit the facility by either walk-in or appointment and how much time spent with each patient. These are all the things that have an influence on the facility payroll budget and the work shifts that are needed to be covered.…

    • 746 Words
    • 3 Pages
    Improved Essays
  • Improved Essays

    Nike Week 3 Metrics Paper

    • 1032 Words
    • 5 Pages

    What three metrics do you believe would be most beneficial for marketing Nike? Nike thought about the Customer Life Value and equipped for making an interpretation of promoting exertion into money related outcomes. For instance, the promoting methodologies are concentrate on the shoes and hardware, as well as past them. It makes a lifestyle as a games culture, similar to the state of mind "do what needs to be done," the words from Phil Knight, Nike's CEO.…

    • 1032 Words
    • 5 Pages
    Improved Essays
  • Decent Essays

    Payroll Process Analysis

    • 150 Words
    • 1 Pages

    Process the payroll ahead of time. Devise a payroll-processing schedule that allows you ample time to process the payroll and to correct detected errors before employees receive their paychecks. For example, perform payroll processing two or three days before the actual pay date. Make changes to the employee's payroll record, if applicable. This includes: address changes; payroll deduction changes, such as W-4 and state income tax form changes; and voluntary deduction changes, such as retirement and health benefits.…

    • 150 Words
    • 1 Pages
    Decent Essays
  • Improved Essays

    Jos A Bank Case Study

    • 2526 Words
    • 11 Pages

    Identify key production planning considerations (which, when and how much of each to produce, methods of dealing with short/long term changes in capacity demand). Carrier Corporation had about 200 distributor locations for their furnaces. They used a just-in-time manufacturing system. Some distributors placed monthly orders and some weekly. 15 to 50 percent of their orders had an “at once” delivery requirement meaning they were needed within 30 days; the rest were greater than 30 day orders.…

    • 2526 Words
    • 11 Pages
    Improved Essays
  • Improved Essays

    AMD Case Study

    • 978 Words
    • 4 Pages

    Factories need these cost savvy equipment’s as soon as possible with advantages of supplier discounts if paid promptly within stipulated time. Automated systems are designed to pay suppliers early to capture the discounts which are very significant. The automated process uses a supply chain event management application which tracks and monitors milestones or events within a business process providing real time status to all the relevant…

    • 978 Words
    • 4 Pages
    Improved Essays
  • Improved Essays

    Nissan Case Study

    • 1038 Words
    • 5 Pages

    Final Project: Milestone 1 Michael Parderlikes Operations Management Southern New Hampshire University July 12, 2017 Generating Value In Operations Management, there are two main categories that resonate with the specific management of the company Nissan, one of the largest car makers in the world, these categories are: service operations and manufacturing operations. Nissan harnesses the outcomes of optimization of such operations by offering, for example, better prices to the end consumer, making sure that the supply of units won’t be interrupted by national or global irregularities, including natural disasters and economic crises. Another example is the possibility to address the international markets and global supply management…

    • 1038 Words
    • 5 Pages
    Improved Essays
  • Great Essays

    Chapter 1 INTRODUCTION 1.1 Introduction Penang Second Bridge is one of the largest civil engineering projects in Malaysia after the First Penang Bridge. Penang Second Bridge or also known as The Sultan Abdul Halim Muadzam Shah Bridge was a dual carriageway toll bridge in Penang, Malaysia. It was the second bridge which connects the mainland to the island after the first Penang Bridge. Once construction is completed, a maintenance management system plays an important role in maintaining the adequacy and the structure of the bridge so safe and comfortable in use by the general public.…

    • 1086 Words
    • 5 Pages
    Great Essays
  • Improved Essays

    Executive Summary Operation management is one of the important activities to determine the success of the company. As known for all, the operation management in any kind of business is the key activity for the organization. In this paper will discuss the operation management and process design of Carrefour, Carrefour is the second largest retail supermarket in the world, and we will investigate the fact in spite of the severe competition that exists in the retail industry. The company was able to make its mark on the globe and achieved impressive success by regulating the operation management function.…

    • 998 Words
    • 4 Pages
    Improved Essays