Design Responsibilities

Decent Essays
Design: - Under the design section we will deal with four parties Designers, Architects, engineers, and regulatory authorities. Each party has their own roles and responsibilities. Designers: - The designers will provide the assistance in project design and develop the activities based on our requirements. They will design documentations, technical provisions and other project related documents. They will discuss all the issues and new design ideas in the project meetings. In these meetings They will also suggest the correct action to remove the issues. They will help the project manager to develop the project plan budget and schedule. They will design the layouts and sketches according to the project requirements. They will also develop …show more content…
They will attend the weekly progress meetings, in these meetings they will aware the staff about where we are in the project actually and what kind of improvements we need to attain the maximum progress. They will maintain the working environment safe and clean by implement procedures rules and regulations. They will confirm the performance of the project by designing and conducting tests. They will maintain the project schedule by monitoring the project progress, resolving the issues and coordinating activities. They will report to our project manager time to time about the project progress and maintain the project data baes by writing the computer programs entering and backup data. They will also control the project cost by approving expenditures, administering contractor contracts. They will maintain our project under …show more content…
It will ensure assure that the work is performed as required by the contract and meets or exceeds the required qualities. It will assure the acceptable quality of materials, processes, and workmanship in the project. It will assist the quality assurance and quality engineer such as steel reinforcement checking same as in construction drawing. It will issue materials receiving report for the delivered materials. It will also deal with waterproofing checking underground water level. It will complete the required documents to the work performance. It will ensure all the test reports are verified to meet the contract requirements. It will ensure all the materials to delivered to site will inspected and confirm to specified requirements.it will report to the project manager any deficiencies in the operation of quality management and control system. It will responsible for audits of subcontractor quality control management

Related Documents

  • Decent Essays

    After a thorough review of the AHA each employee must sign in acknowledgement, confirming he or she understands risk associated with the identified hazards and that training has been provided to keep them safe. 4. Systematic safety inspections (SSHO) are conducted daily by the Superintendent or Site Safety and Health officer to ensure operations are being performed in a safe manner. Safety reports are generated by the SSHO or other safety personnel following each inspection. The Safety Inspection Report may require corrections which the superintendent must ensure are rectified.…

    • 781 Words
    • 4 Pages
    Decent Essays
  • Decent Essays

    I would have to do risk assessments and reviews annually to minimise the potential accidents that could happen and I would also have to make sure that all of the employees under me are sufficiently trained for their positions and to keep their training up-to-date with booklets and training days. I would also have the duty of making sure that all equipment is in working order and safe to be…

    • 1244 Words
    • 5 Pages
    Decent Essays
  • Decent Essays

    Identify any problems or delays in reaching the established training objectives 9. Administer the Multi-source 360 feedback, developmental counseling form, command climate survey and Myers-Brigg Type Indicator (MBTI) the first week of training Feedback Process: The organization will assign a representative to ensure the leadership is attending all the training, and tasks, tests and feedback analyses are accurately done with the data being collected for analysis. Upon review of the data, the need to update or change the training plan will be…

    • 1172 Words
    • 5 Pages
    Decent Essays
  • Decent Essays

    So he should prepare the work progress reports for presenting it to the client. Project manager needs the observation, analysis and a number of tools to determine whether or not the team is on the track and deliver the expected results on scheduled date. Acquiring proper safety measures in the work and maintaining the quality of work is also plays main role in delivering a…

    • 1040 Words
    • 5 Pages
    Decent Essays
  • Decent Essays

    The team will then develop the course of action needed to complete the objectives. In this phase we will create the project management plan which documents the actions necessary to define, prepare, integrate, and coordinate all subsidiary plans (Project Management Institute, 2008). We will encourage the stakeholders to participate in the development of the project management plans and all other project documents to ensure they understand the project requirements and take some ownership of the…

    • 835 Words
    • 4 Pages
    Decent Essays
  • Decent Essays

    The Work Given. In the work I do “Field Service” we have a series of documents we follow that are developed by specific professionals, depending on a specific product line we are assigned. Some of these documents are develop to help us track safety, work progress, and cost. These documents are just guidelines based on previous experience in the dewatering industry, such as waste water sites, industrial waste water, and drinking water. My company is a global provider in this field the company I work for has development specific documents that are designed to help make the job performance of each employee to be that much smoother and more organized.…

    • 797 Words
    • 4 Pages
    Decent Essays
  • Decent Essays

    Communicating effectively to stake holders is an on-going process. Performance teams can do this through reports and making sure they are consistently documenting the throughout the lifecycle of the project. Teams should always make sure they are assessing the scope of the project regularly, they benchmark the goals; constantly evaluate the timeline and the budget. This will help ensure that the project is successful and the project manager is able to get in front of unforeseen circumstances. “The monitoring and controlling process group is required to track, review and regulate the progress and performance of the project, identify any areas in which changes to the plan are required” PMBOK (2013).…

    • 946 Words
    • 4 Pages
    Decent Essays
  • Decent Essays

    The developed plans will help in time management, cost, quality, change and risk issues. The plan include the ability to manage staff and external supplies to ensure that the project meet the deadline and within the budget. A list of all items that need to be purchased to complete the project must be supplied this include labour, equipment, materials, administration and other costs. Identify all major risks that might occur when running the project and strategize on how you will prevent them from happening (Gray and Larson,…

    • 2384 Words
    • 10 Pages
    Decent Essays
  • Decent Essays

    The major task was providing a summary of the project. During the presentation I explained the main points of the course of the project operations (interviews, pricing strategy and marketing messages). In addition, the minor task was the cooperation with the member of the team (Joseph) analyzing the project 's objectives and the progress made on each. IV. Summarise / analyse your interactions with your Team members, and others since your Individual Report 1 Since the individual report 1, there has been continuous communication with team members.…

    • 1245 Words
    • 5 Pages
    Decent Essays
  • Decent Essays

    Work with users, other facilities staff and vendors to provide electrical information to ensure the facility is safe, efficient, and reliable. Supervise all work on electrical systems and equipment. Communicates with the management department and customers to schedule activities to make sure there is no effect on production schedules. Make sure all work is done is in compliance with codes and manufacturer’s recommendation. Will have to bend conduit, hacksaw, pipe-threader and testing instruments.…

    • 970 Words
    • 4 Pages
    Decent Essays