Road Construction Case Study

Great Essays
CHAPTER 1: INTRODUCTION

1.0. INTRODUCTION

This is the first chapter of the study and the researcher was focus on the following sections: background of the study, problem statement, research purpose, research objective, research question, scope of the study, significant of the study and the study of operational definitions.

1.1. RESEARCH BACKGROUND OF THE STUDY

Construction industry sector is every nation’s economic development backbone but they are a mix of very complex processes that seldom go according to the planned schedule. Project implementation is the stage where all the planned activities are put in to action, the project is produced and the performance capabilities are verified. A project is generally considered to be performing
…show more content…
The study will help other researchers and schoolers who want to research on factors affecting performance of road construction projects.

1.7. SCOPE OF RESEARCH

This study will be conducted in two district of the capital city in Mogadishu, Somalia, namely, Hodan district and Howlwadag district. These two district was selected because of the road construction projects were implemented and construction companies are located in these districts
The variables to be examined in this study include Project Performance determinants which will be broken into project manager’s competency, project fund and project equipment/resources and other variable (DV) is project performance; the study will focus on only to identify determinants of road construction project performance. The study will be limited
…show more content…
3.1 RESEARCH DESIGN
This study will be used survey research approach. Surveys are data collection method used when describing, comparing or explaining individuals, societal knowledge, feelings, values, preferences, and behavior (Fink, 2009).
The study will be conducted through a descriptive study; descriptive research purpose is to describe an accurate profile of persons, events or situations (Robson, 2002). However, this study will be used quantitative approach; quantitative is any data collection approach (such as a questionnaire) or data analysis procedure that uses numerical data (Saunders et al, 2009)
3.2 TARGET POPULATION
The target population of this study is construction companies who implemented road construction projects in Mogadishu, however, the research will select a number of companies such as xxxxx, xxxx, xxxxx. The researcher selected those construction companies because they are the main construction companies that implemented road construction projects in Mogadishu. Since total employee of those companies are unknown, the researcher took 120 as a target population for this

Related Documents

  • Great Essays

    The Rocky Mountain Lions Eye Bank (RMLEB) is a non-profit organization that services Colorado and Wyoming for donation of eyes for transplantation. The organization was established in 1982 with the assistance of the Lions Clubs of Colorado and Wyoming (RMLEB, 2016). The mission of the organization is “to fulfill the wishes of eye donors and their families to help another overcome blindness through transplantation and research” (RMLEB, 2016, p. 1). Besides providing corneal and other eye related transplantable tissue locally and domestically, RMLEB provides services to eight other countries worldwide, including Japan, South Korea, and China (GuideStar, 2016). In order to continue growing as an organization and maintaining the overseas clients the organization currently serves, RMLEB must explore other options in providing services and products overseas.…

    • 1670 Words
    • 7 Pages
    Great Essays
  • Decent Essays

    The main goal of Neverauskas, B, Bakinaite, L, & Meiliene, E (2013) paper is to determine theoretically how projects can be completed successfully. The paper looks at two important streams. First one discusses projects' success criteria and the other part represents factors which may cause a successful completion for projects.. The paper wrapped up by defining major parameters and recommendation to increase probabilities of projects…

    • 66 Words
    • 1 Pages
    Decent Essays
  • Improved Essays

    The first drawback of the project is the budget and cash flows. In particular, the project overhead costs may be increased due to the lack in subcontractors; most jobs and tasks are done by the general contractor without the cooperating of subcontractors. Because of unpredictable working conditions and procurement process, the general and administrative (G&A) overhead costs also impact the total construction cost (Osipova & Eriksson, 2011). The next instability of the project is to probably allocate and accurate distribute the resources including people, materials, equipment, and working capital. Again, the project has lack of subcontractors, so the project manager and the general contractor need to meet up and discuss the best distribution for the resources in order to complete the project on time (Song, Mohamed & AbouRizk, 2009).…

    • 1031 Words
    • 4 Pages
    Improved Essays
  • Improved Essays

    ABSTRACT This paper proposes who should the project stakeholders, project sponsor, and the project manager be in the launching of newly designed room-sized plastic storage unit of Winsome Manufacturing Company. This paper also took the opportunity to explain what the communication process will be and how the project charter will manage the whole project. This paper considers to help the head of the marketing department of Winsome Manufacturing Company to present the finding made. INTRODUCTION…

    • 1068 Words
    • 5 Pages
    Improved Essays
  • Decent Essays

    Title: The feminism conception in Charlotte Bronte's novel: Jane Eyre Table of content Title . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Abstract. . . .…

    • 1833 Words
    • 8 Pages
    Decent Essays
  • Improved Essays

    Within the context of international as well as local investors, assuring that construction projects are successful should be an essential part of every project manager’s portfolio.…

    • 999 Words
    • 4 Pages
    Improved Essays
  • Great Essays

    The title of the article is “Art and Recovery in Mental Health: a Qualitative Investigation”. This title does not descriptively describe the study but it does tell what the study is going to be about, which is art and recovery. The authors include the variables in the study in the title of the article. These variables include art and recovery of people with mental health issues. The title does not specifically include the population of the study but one could conclude that the population would be people with a mental health illness or disorder.…

    • 1605 Words
    • 7 Pages
    Great Essays
  • Great Essays

    3.12: Data Analysis process Overall, the objective of the research analysis is to try to answer the research questions formulated in Chapter 1. Accordingly, a conceptual framework and propositions have been developed from these questions, and justified in the literature review section. Therefore, the data analysis will be pursued to gather evidence pertaining to the several concepts identified. Quantitative data from the questiormaire survey will be analyzed by utilizing the Statistical Package for Social Science version 22 (SPSS V.22) and SmartPLS v.3. These software packages have been widely used by researchers in various disciplines.…

    • 1267 Words
    • 6 Pages
    Great Essays
  • Improved Essays

    Visualization, coordination, and communication method: These three are other essential traits of BIM-3D beneficial to project-involved stakeholders. Coordination establishes the IPD process and Lean implementation while communication increases the support of IPD and Lean; likewise, visualization develops desired elements and parts of building models and needed information. The 4th dimension and technologies: Time is one of the most factors decided the success or failure of project performance. As stated in collected case studies and recorded via phone interviews, 4D-BIM models are executed in many phases from pre-design to design development and construction phase as well.…

    • 1093 Words
    • 4 Pages
    Improved Essays
  • Improved Essays

    Meat Me Research Paper

    • 1714 Words
    • 7 Pages

    Project management is the art of handling the work and its deliverables with an aim to create finished products or services. There are many ways in which a job can be carried out and the way in which it is implemented is project management. Project management includes: determining requirements, developing obvious and possible goals, controlling the competitive requirements from the different stakeholders and making sure that a common function of purpose is obtained. It is obvious that unless there is an organized and medical strategy to the concept of management, companies would end up adrift and hence would be unable to meet the varied difficulties that the modern era brings at them. Without a medical strategy to the task of handling the tasks and achieving goals, it would be very difficult for the companies to efficiently perform the tasks within the restrictions of their time, opportunity and top quality and deliver the required result.…

    • 1714 Words
    • 7 Pages
    Improved Essays
  • Great Essays

    The methods use in the research has to be clearly explained and described. In addition, every resource that was used in this study must be referenced in this…

    • 1986 Words
    • 8 Pages
    Great Essays
  • Superior Essays

    Criteria Should Zachary use to evaluate the projects Zachary, civil engineering student, has three different projects to be executed. First is related with the improvement in the highway in front of Big John’s supermarket, second is related to repair of Elk Mountain road and third one is repair of bridge over Crockett Creek. However, due to the lack of proper resources, Zachary has to made choice regarding the priority of the projects. In this regard, he has to evaluate all the projects available on the basis of some criteria (Case Study: Transportation Improvement). Some of the crucial criteria that Zachary should use to evaluate the projects can be listed as below: 1.…

    • 1560 Words
    • 7 Pages
    Superior Essays
  • Great Essays

    Briargrove Risk Management Techniques Anthony Redhead Grantham University Project Management Integration Framework (BA 647) Introduction This paper will discuss questionnaires and surveys as tools of project risk assessment. In the paper, I provide a clear guideline to Briargrove concerning how to manage risk using these tools in any project. The paper has also attached to it an example of a questionnaire that could be utilized in the Briargrove project.…

    • 1400 Words
    • 6 Pages
    Great Essays
  • Improved Essays

    2). In this case, A2Z Construction’s stakeholders consisting of organisation’s top management, employees, project team and leader, clients, suppliers need to commit to the project from the planning stage to the post-project monitoring stage. 2) The success principle The success principle entails understanding the project milestones and deliverables agreeing upon them before the project commences and activities designated (Wideman 2003, p. 2).…

    • 1014 Words
    • 5 Pages
    Improved Essays
  • Improved Essays

    My career aspirations and enthusiasm toward Construction and Project Management have been highly influenced by my undergraduate study majoring in Civil Engineering. The undergraduate curriculum in Civil Engineering at NIT-Surat introduced me to a wide spectrum of subjects. But it was the field of Construction planning & Project Management which captured my interest and since then, I have started taking interest in this field. Later on I came to realize that to become an efficient & capable project manager in the Construction Industry, I should undertake training in individual areas construction world lacking in their academic background and maintain a equilibrium between all the necessary knowledge and technical skills which led me to pursue Masters in Civil Engineering in the area of Construction and Project Management at the University of British Columbia, Vancouver which is the center of excellence to study Construction and Project Management in the globe. During my study of Bachelor of Technology in Civil Engineering at the Sardar Patel National Institute of Technology, an Institute of National Importance declared by the Government of India in the field of Engineering and Technology, I understood that the roots of twentieth century project management are generally accepted as lying in…

    • 701 Words
    • 3 Pages
    Improved Essays