Mrap Program Case Study

Improved Essays
The MRAP program was different from the normal DoD procurement process. It followed a tailored approach to defense acquisitions at a time when the strategic and political environments necessitated a rapid response. This rapid acquisition would not have happened without support and pressure from senior leaders. Since it was exception based, it is not a good model to follow in the future, though the need for a rapid acquisitions methodology will remain important in the current and future strategic environments.
MRAPs became the poster-child for the supposedly dysfunctional DoD acquisitions process when it became clear that lives were needlessly being lost in Iraq. Improvised Explosive Devices (IEDs) were taking a huge toll, and were responsible
…show more content…
Several factors made this acquisition “rapid.” The MRAP was an existing technology, developed originally as a mine-clearing vehicle in the 1960’s and had been used by other countries and the United Nations for years. There was no need for a long development cycle, as typically happens for hardware procurements.
Another factor was the different contracting methods used in this large procurement. A sole source contract was issued to one manufacturer who already had an existing production line for MRAPs. At the same time, an RFP (request for purchase) was issued in order to get as many manufacturers as possible involved. Nine of the ten manufacturers who responded to the initial RFP were awarded IDIQ (indefinite delivery, indefinite quantity) contracts for small numbers of MRAPs for testing purposes; and LRIP (low rate, initial production) awards were presented to five of them considered to be low risk, prior to testing. Normally, the acquisition process moves serially, one step after another, while this rapid acquisition took place (partly) in parallel and out of
…show more content…
The process was also competitive throughout in that the manufacturers were incentivized for quick delivery of the test vehicles and did not know that there was a possibility that multiple contracts would be awarded. It is unusual for the Pentagon to award a contract to different manufacturers to meet the same requirement, as this makes maintenance and repair more difficult than if there was only one model in use. But this style of “competitive prototyping” ensured cooperation from all the vendors and produced a better product faster. It is now required for rapid acquisitions of this caliber.
The frequent intervention by strategic leadership also made this acquisitions program unique. Congress weighed in frequently during the requirements stage and the Secretary of Defense had to step in several times to emphasize the importance of the MRAP acquisition in order to overcome bureaucratic foot dragging at the

Related Documents

  • Decent Essays

    Sometimes, a Request for Information (RFI) may be released as a first procurement step to gather information. RFI’s are often released due to drawing discrepancies or if the drawing is lacking critical dimensions and specifications. Based on the Vendor responses to the RFI, the team (PM, Finance, Engineering, Contracts, Procurement) will determine the procurement process that must be followed. The procurement documents must be submitted to corporate for all technology projects and corporate must approve training for State employees. The program contracting office provides final approval.…

    • 477 Words
    • 2 Pages
    Decent Essays
  • Improved Essays

    Hrm 531 Week 4 Paper

    • 570 Words
    • 3 Pages

    In 1996, the manufacture vice president Lucas Moore recommended that the company should purchase the Effective Management Systems, Inc. (EMS) the Time Critical Manufacturing package will operate on several of their systems. The initial startup cost of $220,000 up front and yearly maintenance contracts is available for $55,000 per year. Effective Management Systems, Inc. will provide a limited amount of personalized modifications to the software, and the company will pay $60 an hour for labor. Mr. Lucas pointed out that even though the company MIS department was designing their own system, it would take two years to acquire the system at a cost of $400,00 not taking into account that the parts and other components are not included in the price presented to them (Brown, DeHayes, Hoffer, Martin, & Perkins, 2012). Moore does not have a lot of experience in the manufacturing and was not employed at the company when they tried software implementation earlier, which did not meet the expectation the company expected company.…

    • 570 Words
    • 3 Pages
    Improved Essays
  • Improved Essays

    In addition, they will save time by utilizing the pre-established resources and knowledge from their partner. Now that Mercan Systems, Inc. has chosen an alternative, they must formulate an implementation plan. The first major element to consider is when exactly they should enter the market. A large opportunity is present, meaning that they need to act fast to find a joint-venture partner.…

    • 800 Words
    • 4 Pages
    Improved Essays
  • Great Essays

    MasTech Inc. Case Study Crucial Factors: • The steel contracts account for about 60% of the total cost. • In the production phase, suppliers are expected to provide defect-free products with JIT delivery. • MasTech won a bid to produce a cross-member part for the new frame of a new Ford truck model, & will be using Uxbridge as their steel supplier. • MasTech requires 130,000 tons of steel annually (260,000,000lbs) to complete the cross-member deal.…

    • 1583 Words
    • 6 Pages
    Great Essays
  • Improved Essays

    Recently, there has been a political leadership change where the Minister for Communications Malcolm Turnbull successfully challenged the Prime Minister Tony Abbott on 15 September 2015, for the Liberal Party leadership. With the change of leadership in the Liberal Party, Prime Minister Turnbull announced his new cabinet on 20 September 2015, where Marise Payne was appointed as the new Minister for Defence. These changes may impact on how the Government directs the ADF’s strategic future. The parameters governing the strategic future of the ADF in terms of modernising CSS capabilities is likely to be delayed further in the Defence White Paper originally expected to be release in 2015 by the Abbott Government. With efficient resource planning,…

    • 532 Words
    • 3 Pages
    Improved Essays
  • Decent Essays

    To interview key Office of the Deputy Under Secretary of the Navy (Management) (DUSN (M)) personnel responsible for Military Interdepartmental Purchase Requests (MIPR) N4814617MP00030, that was used to provide funding to support Marine Corp Systems Center's (MCSC) travel requirements in support of the proof of concept project Autonomous Hydrographic Coastal Survey (AHCS) system for the United States Marine Corp Rapid Capabilities Office (RCO). Also obtain an understanding of the MIPR and any documentation relevant to the Follow-up audit for the Department of the Navy Assistant for Administration (2017-103). Members of the audit team met with DUSN (M) personnel to obtain an understanding of the MIPR and obtain any relevant documentation as…

    • 299 Words
    • 2 Pages
    Decent Essays
  • Improved Essays

    Over his 20 year career, Chief Warrant Officer Two Juan Ramos has distinguished himself by exceptionally meritorious service in successive positions of great importance and responsibility to the Army and the Nation, culminating as the Senior Property Accounting Technician, 35th Theater (Tactical) Signal Brigade for 26 months. During his career, Chief Warrant Officer Two Ramos has served in two combat tours and several hazardous deployments thereby, facilitating unimpeded logistics ISO the prestigious United States Army Special Forces (USASOC) from October 2010 to May 2015. From October 2010 to November 2012, Chief Warrant Officer Two Ramos served as the Special Forces Battalion as the Property Accounting Technician assigned to the 214th…

    • 492 Words
    • 2 Pages
    Improved Essays
  • Great Essays

    Joint Force 2020

    • 1383 Words
    • 6 Pages

    Institutional risk includes “reforming acquisition processes, optimizing information technology acquisition processes, and maintaining the defense industrial base.” Ultimately funding is needed to modernize and mitigate risk. In order to create funding flexibility, the services look to congress and the states to support often controversial and politicized initiatives for institutional reform, such as reduction in excess or obsolete infrastructure and changes to personnel compensation. Complicating matters is DoD’s acquisition process which is poorly suited for keeping pace with global innovations in information technology (IT). The inability to efficiently acquire powerful IT solutions hampers efforts to leverage IT as a force multiplier to enhance agility, flexibility, and responsiveness.…

    • 1383 Words
    • 6 Pages
    Great Essays
  • Decent Essays

    The primary role of the Defense Contract Management Agency (DCMA) is to oversee the administration of defense contracts, dispatch quality assurance reports and audit/monitor subcontracting plans. DCMA consistently plays program supportability roles throughout different DOD acquisition programs. Although, in the DOD medical acquisition community use USAMRAA (US Army Medical Research Acquisition Activity) for contracting support, we can use the DCMA capability to integrate information from different functional specialties. It can also help integrate data from other Contract Administrative Service (CAS) capabilities to support cross-functional analysis and reporting at the program level. Supporting DOD Program managers is also a critical component…

    • 324 Words
    • 2 Pages
    Decent Essays
  • Decent Essays

    Florent Role Model

    • 246 Words
    • 1 Pages

    Florent is our Regional Sales Manager Transportation and Key Account Manager for the Sydney Airport. Florent brings over 9 years experience as a sales professional, delivering best-in-class solutions for Government mission-critical industry and across defence, identity management, secure documents, border control, and public security solutions. Forent led the Smiths Detection successful bid for the 2014 G20 Summit (Brisbane) provision of security equipment and services, and has been noted for his ability to delivery an outstanding client relationship framework. Outstanding capability in the tender management and relationship of major multi-million dollar contracts relating to national security biometric systems and border control systems.…

    • 246 Words
    • 1 Pages
    Decent Essays
  • Improved Essays

    PM 598 Final Exam Keller Purchase here http://devrycourse.com/pm598finalexamkeller Product Description TCO A) All the below are tools and techniques of conduct procurement, except (Points : 5) (TCO A) All the below are tools and techniques of control procurement, except (Points : 5) (TCO B) Proper selection criteria are critical for a successful project.…

    • 985 Words
    • 4 Pages
    Improved Essays
  • Superior Essays

    First Class: We talked in our first Class about President Trump’s plan to “Drain the Swamp.” The problem in Trump’s eyes is that career politicians are poisoning the system and the revolving door of politicians going to work for cooperations and lobbyists is bringing corruption. Trump continues to say that “things are bad in DC” however, their might be something bad with his terminology. “Drain the Swamp” is an open ended term—one that any American could project their goals onto, similar to the slogan “make America great again.”…

    • 1727 Words
    • 7 Pages
    Superior Essays
  • Great Essays

    Cost Benefit Analysis

    • 1774 Words
    • 7 Pages

    Choosing the appropriate EMR (electronic medical record) vendor is essential to a successful transition from paper records to electronic medical records. Many factors must be weighed in this selection process. One method to help hospitals and practices make this complex decision is to complete a cost-benefit analysis. Entire books have been written on how to conduct cost-benefit analysis and an in-depth analysis goes well beyond the scope of this paper. Instead, this discussion will focus on how cost-benefit analysis can help to determine an appropriate EMR vendor.…

    • 1774 Words
    • 7 Pages
    Great Essays
  • Improved Essays

    General Equipment • DHP Logistics (Frank)/ DHP Facilities (Russ Manning) o DHP confirmed that gaps exist in the DMLSS and DPAS systems. o DHA indicated that there is significant difference in asset amount for GE items (same asset on SMA books) due to purchasing and pricing of the asset. o…

    • 1808 Words
    • 7 Pages
    Improved Essays
  • Improved Essays

    Doctor’s Hospital is an acute care facility in a small town. Due to a major financial disruption they had to transform their organization’s governing structure. As a result, they did not consider the impact of CIO in IT and they turn CIO’s full-time job into a part-time job. Therefore, Doctor’s Hospital faces many information system challenges. Along with that hospital is undergoing 3 phase construction.…

    • 768 Words
    • 4 Pages
    Improved Essays