Mediwatch Quality Management Plan

1636 Words 7 Pages
Register to read the introduction… | The data cannot be send to the caretakers. | The customer cannot be treated immediately. | 10 | Hazardous without warning. | No-proper signals or may be due to whether conditions. | 6 | Using high quality network and using network which has high speed. | 10 | 600 | | 10 | 6 | 10 | 600 | 2 | Accuracy of GPS. | The customer’s location can not be traced. | The caretaker cannot reach the customer on-time. | 4 | Very Low | Their may be problem with the cellphone or may be problem with the app. | 6 | using the best GPS apps and a good smartphone. | 5 | 120 | | 4 | 6 | 5 | 120 | 3 | Accuracy of accelerometer sensor. | The accelerometer is miss-placed. | can not detect the movement of the human body so that it may give false alerts and losses time. | 7 | High | The employee is new to work or have poor knowledge. | 7 | The employees should be well educated about the entire process of the manufacture. | 4 | 196 | | 7 | 7 | 4 | 196 | 4 | Accuracy of body temperature sensor | The sensor may give the false alerts. | It may give false alerts and losses time. | 7 | High | The sensor may not work properly due to the extreme weather conditions. | 2 | The sensors should be protected with the shields which can bear the outdoor conditions. | 1 | 14 | | 7 | 2 | 1 | 14 …show more content…
| It may give false alerts and losses time. | 7 | High | The sensor may not work properly due to the extreme weather conditions. | 1 | The sensors should be protected with the shields which can bear the outdoor conditions. | 1 | 7 | | 7 | 1 | 1 | 7 | 6 | screen size | smaller screen size or larger size than what we have actually designed | The piece will be wasted and loss of the time. | 5 | Low | Due to the manufacturing defect. | 2 | day to day checking of the machinery and proper employee training. | 1 | 10 | | 5 | 2 | 1 | 10 | 7 | Band size | smaller band size or larger band size what we have actually designed | The piece will be wasted and loss of the time. | 5 | Low | Due to the manufacturing defect. | 2 | day to day checking of the machinery and proper employee training. | 1 | 10 | | 5 | 2 | 1 | 10 | 8 | Display size | smaller display size or larger display size what we have actually designed | The piece will be wasted and loss of the time. | 5 | Low | Due to the manufacturing defect. | 2 | day to day checking of the machinery and proper employee training. | 2 | 20 | | 5 | 2 | 2 | 20

Related Documents