Riyadh City Transportation Project

Improved Essays
King Abdul-Aziz Project for Riyadh Public Transportation is a heavy civil infrastructure project under construction. The project is worth $ 22.5 billion. It has two major elements. The first element is Riyadh Metro while the other part is Riyadh Bus Project. In this paper, we will investigate the metro project. Riyadh Metro is a rapid transit system located in the capital city of the Kingdom of Saudi Arabia. This new public transportation system is considered as the spine of the King Abdul-Aziz Project for Riyadh Public Transportation (the High Commission fro the Development of Riyadh, 2014). The metro network has six different lines to serve Riyadh city listed below:

A. The Blue Line: Axis with a total length of 38 km.
B. The Red Line: axis
…show more content…
The network consists of 85 metro stations along with 176 KM. The metro network will cover most of the populated areas such as public facilities, the educational institutions, the commercial centers and the medical centers. In addition, definitely, the metro project will be connected to King Khalid International Airport as well as King Abdullah Financial District. In the end, the project will be of great benefit to Riyadh traffic, economy, society and environment. Moreover, it will provide the city with a giant public transport system to meet its existing and future needs (the High Commission fro the Development of Riyadh, …show more content…
Each one is different from the other as defined in the competition documents. The first group includes access number one and two with length of 63.3 KM and 42 metro stations. The second group includes access number three with length of 40.7 and 21 metro stations while the third group includes access number four, five, and six with length of 31 KM and 32 metro stations (the High Commission fro the Development of Riyadh, 2014).

During the competition phase, the high commission for Development Riyadh has arranged a meeting between the supervision team and the competitive consortium in Sep, 2012. On the deadline day, Feb 20, 2013, for receiving the technical and financial bids for implementing the project, three consortiums have offered their tenders (the High Commission fro the Development of Riyadh, 2014).

Each consortium has submitted its tender in two separated envelopes. The first was for technical documents and the other was for financial documents. All bids have been reviewed and evaluated in terms of meeting the conditions and the specifications(the High Commission fro the Development of Riyadh, 2014). This paper will investigate more on the first consortium that consists of five big companies listed

Related Documents

  • Decent Essays

    L Flant Plaza (WMATA)

    • 215 Words
    • 1 Pages

    A brief history of the WMATA dates back to early 1976 when the Red Line became operational and transported commuters from Farragut North to Rhode Island in Washington D.C. The growth of the metro soon blossomed into a five line transportation system connecting from the heart of D.C. to Virginia and Maryland. WMATA built train stations below and above ground which provided the construction of railroad tracks connecting all the stations together to the main hub L’Flant Plaza (D.C.). To this day there is approximately 91 metro stations serving the DMV area within a 118 mile network. To accommodate commuters during the peak traffic hours besides the trains, WMATA also put in service the Metrobus service which came online about the same time as…

    • 215 Words
    • 1 Pages
    Decent Essays
  • Improved Essays

    Thank you for providing the California Department of Transportation (Department) the opportunity to review and comment on the Notice of Preparation of a Draft Environmental Impact Report for the Waterman + Baseline Neighborhood Transformation Specific Plan (Project). The proposed project are includes approximately 710 acres located near the center of San Bernardino area the intersection on Waterman Avenue and Baseline Avenue. The Project proposes a maximum build out of up to 4,341 residential units, 3,570,448 square feet of non-residential uses, and associated transportation/mobility and infrastructure improvements. As the owner and operator of the State Highway System (SHS), it is our responsibility to coordinate and consult with local jurisdictions when proposed development may impact our facilities.…

    • 995 Words
    • 4 Pages
    Improved Essays
  • Improved Essays

    Melbourne Research Paper

    • 813 Words
    • 4 Pages

    The Daily Times VOLUME No. 5 ISSUE 12. THURSDAY MORNING MAY 8, 1887 Melbourne, now the second-largest city in the British Empire, is one of the largest cities in the world in terms of area. With a population of 280,000 in 1880, it is dubbed “Marvellous Melbourne” by amazed visitors. Citizens now strut the streets, bursting with pride and optimism as their city continues boom.…

    • 813 Words
    • 4 Pages
    Improved Essays
  • Improved Essays

    Dallas was late to build a municipal rail transport system, yet today its DART light rail system is the largest in the United States at a total system length of 85 miles. Troubled by a rocky start, the Dallas Area Rapid Transit authority was faced with the stubborn reluctance of voters to spend any taxpayer money on public transportation infrastructure. However, once the wheels of development started in motion, there was no chance of them stopping. Over the course of 30 years, Dallas went from having the bare minimum of public transportation to having a world-renowned commuter rail system that spans even beyond the boundaries of the city. The economic and spatial impact of the DART rail system is reminiscent of the electric streetcars — save…

    • 887 Words
    • 4 Pages
    Improved Essays
  • Improved Essays

    At present, it will have stops in Fort Lauderdale and West Palm Beach. The vision is to offer an alternative transportation solution to ultimately promote a car and care-free South Florida, and it is partnering with Miami Dade County Transit (Brightline, 2016). The transit system in Miami Dade County is the fifteenth largest in public transit system in the United States of America, and the largest in Florida (Barrow, 2016). The goal is to connect the Metrorail with the Tri-Rail in Broward and Palm Beach…

    • 1549 Words
    • 7 Pages
    Improved Essays
  • Improved Essays

    External Analysis a. External Environmental Scan (PESTEL Analysis) Political Factors Generally, Canadian Tire Operates in Canada and thus, it has to adhere to Canadian laws and regulation in relation to safe undertaking of business practices, adhering to tax regulations and laws, enhancement of the environment as per Canadian laws and the global laws that govern safe environment and sound employee practices. Canada is a political democracy with a stable political environment, which is conducive for the good performance and growth of the business as there are minimal political strife and little chances for violent conflict as those witnessed in some countries. The level of government involvement in businesses in Canada is high where there…

    • 1532 Words
    • 7 Pages
    Improved Essays
  • Improved Essays

    Today, WMATA is commonly known or referred to as simply “Metro” in metropolitan area. Metro provides public transportation services via Metrorail, a rapid transit system which services over 117 miles of track and over 90 stations. A 325 route bus system comprise what is known as Metrobus and MetroAccess which is a “shared-ride, door-to-door, paratransit service for people whose disability prevents them from using bus or rail (Metro, 2014)”. Combined, Metrorail and Metrobus provide transportation services…

    • 673 Words
    • 3 Pages
    Improved Essays
  • Great Essays

    Where is the main entrance to the station located? City-side How can tickets be purchased? At ticket desks, myki’s can be bought and topped up. Tickets can also e bought online. Do you think the station would be tourist friendly?…

    • 2479 Words
    • 10 Pages
    Great Essays
  • Decent Essays

    Greater Toronto Area (GTA) dominates the rest of Canada in terms of high volume of transportation but at the same time the region is facing serious problems in its transportation sector. Toronto Pearson Airport underwent a $4.4 billion on the redevelopment of its Terminal 1 alone built by the not for profit airport authority, while on the other hand TTC buses have long past their normal life expectancy on the streets (Keil, & Young, 2005). The city of Toronto is also known as the region that is very well served by the Toronto Transit Commission with limited resources and funds. According to Roger Keil and Douglas Young in their article “Transportation: the bottleneck of regional competitiveness in Toronto” almost 1.3 million people use TTC…

    • 171 Words
    • 1 Pages
    Decent Essays
  • Improved Essays

    Stakeholder Paper

    • 1385 Words
    • 6 Pages

    Stakeholder Report Our project is a proposals for the donation of books and computers in high schools. The aim of this Project is to raise up the educational system, to provide modern equipment and books to students, which will all society benefit from in the future. Fruits of this Project are ongoing and at long term.…

    • 1385 Words
    • 6 Pages
    Improved Essays
  • Improved Essays

    ABSTRACT This paper proposes who should the project stakeholders, project sponsor, and the project manager be in the launching of newly designed room-sized plastic storage unit of Winsome Manufacturing Company. This paper also took the opportunity to explain what the communication process will be and how the project charter will manage the whole project. This paper considers to help the head of the marketing department of Winsome Manufacturing Company to present the finding made. INTRODUCTION…

    • 1068 Words
    • 5 Pages
    Improved Essays
  • Improved Essays

    All of these solutions are executing in Toronto. Specially, last solution (signal timing) is the most useful point in three solutions. If it is succeed to reduce traffic congestion, Toronto economic will increase more than…

    • 582 Words
    • 3 Pages
    Improved Essays
  • Improved Essays

    The Medupi Power Station History, Developments and Strategy Growth. Background The Medupi power station construction was a joint venture carried out in aims of fulfilling the power shortfall in South Africa. There was a great demand for Electrical Supply through out South Africa which translated in wide spread regular nationwide power cuts.…

    • 1033 Words
    • 5 Pages
    Improved Essays
  • Improved Essays

    Nayatel Case Study

    • 1443 Words
    • 6 Pages

    PMO DEPARTMENT IN NAYATEL COMPANY: After the analysis of PMO,the management has decided to establish the PMO department in Nayatel. The PMO plays a supportive role in the organization by providing training's to the project team members on various projects, tracking the progress of the project and communicating the success of the project to the board of directors and key stakeholder 1.ISSUES FACED BEFORE PMO: After the foundation of a Project Management Office, numerous issues and issues identified with projects have been resolve under the help of the PMO-Nayatel. The PMO has controlled the project consummation stages, making it a more light-footed, fruitful and viable process.…

    • 1443 Words
    • 6 Pages
    Improved Essays
  • Great Essays

    Bbvp Essay

    • 1468 Words
    • 6 Pages

    However, the program management must have the knowledge of the city’s travel condition to satisfy user demand and maximize vehicle use in every…

    • 1468 Words
    • 6 Pages
    Great Essays