KSB Pumps Case Study

Superior Essays
Since its inception in 1959, KSB Pumps Company Limited has achieved a leading position in the market and become the leader and manufacturer of pumps, valves and related systems provider in the country. Five decades of success of KSB Pumps Company have been compiled in a book 50 years of setting standards, documenting all the milestones the company has achieved since its inception.
Important Events:
March 12, 1964: Start of production facility
1964 marked the commencement of production in the factory located in Hassanabdal KSB Pakistan. The force employed at the facility was approximately 200 employees.
December 4, 1965: DWT Pumps
1965 saw the successful launch of the deep well turbine pumps (DWT): a new product line in the existing KSB Pakistan.
…show more content…
MIL valves are more common in the Asian market.
 Pumps and fire protection systems
Under the ITUR brand, KSB ITUR Spain, SA, manufactures pumps for use in ships and fire protection systems for building services and industry.
 Pumps, control cabinets and emergency power generators
KAGEMA Industrieausrüstungen GmbH offers KSB products a full range of diesel and electrically driven pumps, control cabinets and emergency power systems for fire fighting.
Water:
As a supplier of reliable systems KSB offers its customers expert consulting suitable pumps, valves and systems for water applications.
KSB offers ideal solutions for:
 Water extraction
KSB offers innovative technology for extracting water and groundwater management. Our products are reliable and efficient moving water.
 Water treatment
KSB linking progress and technical benefits to customers with many years of experience in water treatment and conditioning, as well as desalination of seawater.
 Water Transportation
KSB products reliably provide water transport and distribution of water.

Sewage
…show more content…
Pump Station reliable power and high-pressure valves make market leader KSB worldwide.
Program technically advanced and complete KSB pumps and valves according to DIN standards our convince operators of power plants and plant engineering contractors worldwide. KSB products are ideal for generating energy economically and reliably.
Reliable operation of pumps and valves KSB power plant
KSB Pumps Power Station give reliable service in primary and secondary circuits worldwide. They are responsible for reliably boiler water supply, condensate and cooling water, and recirculation cooling water in the boiler. Our globe valves high pressure gate and butterfly closed safely out of these fluids.
Central applications KSB products
KSB Pumps power plant and high-pressure valves are ideal for use in nuclear power plants and fossil fuels. Moreover, they are particularly suitable for applications of renewable energy and for the operation of district heating systems. Power plant pumps and valves KSB are also used in power plants with carbon capture and storage.

Construction

Related Documents

  • Decent Essays

    The project is scheduled to finish in 21 months starting from August 2015. The project is divided into three categories. 1. Civil Works: -Civil Works comprise all major civil works of the project like construction of the dams for reservoir, power house, and buildings for staffs, tailrace, penstock, testing and commissioning of all hydraulic steelworks including all gates, trash racks and trash rack cleaners. 2.…

    • 200 Words
    • 1 Pages
    Decent Essays
  • Decent Essays

    Case Study: Saskwater

    • 322 Words
    • 2 Pages

    SaskWater has received a Request for Service from the Town of Birch Hills requesting a peak flow of 130 igpm. An assessment was performed includes two of SaskWater existing systems. Option #1 the Melfort Regional Treated System (CLPOWSS); three scenarios were considered while investigating the CLPOWSS. Scenario #1 connects the Birch Hills community with the CLPOWSS, plus twining 5.5 km of the existing pipeline between Melfort and Kinistino, which would allow for 100% of average daily consumption. Scenario #2 increases the length of twinned portion of the pipeline between Melfort and Weldon to 17.5 km to enable supplying Birch Hills with the requested 130 igpm.…

    • 322 Words
    • 2 Pages
    Decent Essays
  • Decent Essays

    Contract Law Tba Sample

    • 327 Words
    • 2 Pages

    TBA: Klamath Project Draft C Flume Repayment Contract (OR/CA): Reclamation anticipates that the Klamath Irrigation District (KID) will sign a $7.45M loan repayment contract. The public comment period closed May 31, and the KID board of directors have indicated they will sign the contract shortly thereafter. Mid-Pacific Regional Director David Murillo will then sign the contract for Reclamation. KID has received bids for the construction work and has selected a preferred contractor. Site work is planned to begin in July.…

    • 327 Words
    • 2 Pages
    Decent Essays
  • Decent Essays

    Hi Pam , how are you ? We are kind of confuse in your below comment regarding the pump ZW 8X6X10F¨, attached is the file that I received from FM back on August 19,2015 with the test points to perform and according to the Maximums Ratings attached and curves we really don´t know what is the mistake? Can you please point me out exactly what do you meant, so I can be able to revise it with the Lab Staff.…

    • 84 Words
    • 1 Pages
    Decent Essays
  • Improved Essays

    Responsible for performing tasks involving the general order, receipt, and delivery of supplies, upkeep and maintenance of all Army supplies and equipment. Scheduled material storage, unserviceable equipment turn-ins, and lateral tool transfers. Tracked shipment status through Radio Frequency Identification to prepare inventory adjustments and analyze delivery reports. Implemented an innovative inventory reduction program for a division Bill of material yard (BOM Yard) in Iraq, Speicher resulting in a cost savings of $1.5 million. Increased Stock takes accuracy levels to 0.001%.…

    • 611 Words
    • 3 Pages
    Improved Essays
  • Superior Essays

    Amec Paragon Case Study

    • 1013 Words
    • 5 Pages

    The general parts of this supply chain are discussed. AMEC Paragon requires people with specific expertise, who can travel to exotic locations around the world. The specifics of a supply chain will change from one project to another but the general process will be the same. Creative solutions must be obtained from a constantly changing labor pool, from different areas of the world. The Human Resource Department must stay connected with a network of professional personnel who have the expertise to complete these projects.…

    • 1013 Words
    • 5 Pages
    Superior Essays
  • Improved Essays

    Have you ever been in a car? A bus? A train? Have you ever used electricity? Chances are, you have.…

    • 641 Words
    • 3 Pages
    Improved Essays
  • Great Essays

    Costco Capital Structure

    • 1954 Words
    • 8 Pages

    Operations: Lean Manufacturing, Value Added Engineering(constant prices),K-Engine(fuel efficient) plant used in…

    • 1954 Words
    • 8 Pages
    Great Essays
  • Improved Essays

    These days, lots of people have in their home a water ionizer. Is it really necessary to have a device like this in your home? Does it really bring you lots of advantages? Many of you probably wonder if the water ionizer is a trend or a necessity, and in order to find the right answer to your question you should read this article and draw your own conclusion. What is a water ionizer?…

    • 470 Words
    • 2 Pages
    Improved Essays
  • Superior Essays

    Although the concept of Playpumps was idyllic in theory, its application was sabotaged by the strategy adopted by Playpumps International. Along with the technology, the focus was flawed: despite being a humanitarian project, there was greater emphasis on pleasing donors and meeting ambitious targets for glory, than supplying water to impoverished communities. It is important to understand that Playpumps are only one solution amongst a myriad of other water supply systems, and careful assessment is required to identify which combination of these solutions is appropriate for each individual community. Therefore, a change in priority and management is necessary to organise this project more effectively, in areas of administration, preparation, design, installation and maintenance. ADMINISTRATION:…

    • 1384 Words
    • 6 Pages
    Superior Essays
  • Superior Essays

    Case Study Of Grundfos

    • 1371 Words
    • 6 Pages

    1. Executive Summary Grundfos has a mission to become the number one digital organisation in the world and has taken many steps ensuring the organisation is aligned ensuring the success of this goal. Globally the organisation is very well set up on all social media platforms, however, compared to competitors globally they can do better.…

    • 1371 Words
    • 6 Pages
    Superior Essays
  • Superior Essays

    Within this experiment propane gas was used to heat water. Propane is pumped into the boiler where the water is stored. The temperature and pressure increase boils the water producing steam. The steam valve is then gradually opened to direct it toward the generator. In turn, the blades of the turbine rotate and the Condenser transforms the steam to water which is pumped back into the boiler.…

    • 3367 Words
    • 14 Pages
    Superior Essays
  • Improved Essays

    Life Before Steam Engine

    • 649 Words
    • 3 Pages

    Task: Steam engine What was life like before the invention? Life was very different before the steam engine was invented. Before the invention people used three ways to get power: wind, animals and water. Wind powered propellers were used to get power, but it wasn’t really effective if it wasn’t on a flat plain.…

    • 649 Words
    • 3 Pages
    Improved Essays
  • Improved Essays

    The contract included a turbine island, comprising steam turbines, generators, associated air cooled condensers, related turbine, island auxiliary equipment and feed water heating plants, including turnkey supply for turbine hall. The Boiler contract of R33.6 billion was then issued to Hitachi power and Hitachi Power Europe. The Management and control of all stakeholders is key to completing the project successfully so management decided that due to the duration and uniqueness of the project, the project could not be carried out like any other. They realized that due to the duration being 5 to 7 years versus the usual three the site operations and structure must be fabricated to deal with the change in environment.…

    • 1033 Words
    • 5 Pages
    Improved Essays
  • Improved Essays

    Air fuel ratio Air fuel ratio is the ratio of the air and fuel present, while in the combustion process in the internal combustion engine In petrol combustion engine the air fuel ratio would be 14:1 means 14% will be of air and 1% will be of fuel and this type of air fuel mixture is known as stoichiometric air fuel ratio If the air which is delivered in the cylinder block (chamber) completely burn the fuel then it is known as stoichiometric air fuel ratio In this 14% will be of air and 1% will of fuel this fuel ratio can only change when the choke circuit is been choked up Air fuel ratio are of two type: 1.lean and 2. Rich In lean mixture the air ratio or air content is more than the fuel and in the rich mixture the ratio of the fuel or its content is more than the air…

    • 1254 Words
    • 6 Pages
    Improved Essays