Importance Of Estimating Cost Of Risk In Construction

Improved Essays
2.3 Estimating cost of risk
Pricing the cost of risk is a significant and challenging part within the bid’s process. As it was discussed on the previous section, construction projects face a high level of uncertainty and risk situations regarding the complexity of the project. According to Laryea and Hughes (2010), there are distinctive factors that affect the estimation of the total cost and it include the anticipated budget before construction, strong competition on bidding, low fixed capital conditions, preliminary expenses, delays to cash inflows, reduced working capital, weather conditions, fluctuations rates, political issues, and so on. Concerning this, it is definitely important to undertake an adequate cost risk analysis from the
…show more content…
Nevertheless, there are common issues in cost estimating related to assumptions that cannot be validated, discordance with the schedule and scope of the projects, disinterest on geographic location, as well as the adoption of such as labour rates and overhead cost that are no longer in use (Burtonshaw-Gunn, 2009). In fact, construction projects must be updated in terms of the budget regarding the inclusion of expected and unexpected cost implicit in the whole process.

Certainly, it is possible decrease the cost overrun with a combination of risk management methods with a use of construction cost estimations not completely based on experiences and intuition (Nworuh and Nwachukwu, 2004). From long time ago contractor are relying on traditional and instinctive methods for pricing the risk without systematic and analytical techniques. For that reason, we will discuss in the following section some analytical risk
…show more content…
The ‘analogy’ approach is based on statistical evaluation of past events, finding an appropriate relation between cost and efficiency. The adjustments into a new bid should be established through a comparison of complexity and composition, clear differences, as well as location and escalation data. In a similar way, the ‘Parametric’ method relies on previous characteristics of completed projects but, in this case, estimations are done on scope, function and material basis. ‘Expert opinion’ is typically used to establish estimations having confidence on experienced consultants. Likewise, ‘Wideband Delphi’ involves the approach of a group of expert in an individual way, where each expert evaluate the issues related to the project; thus, it is possible to obtain several supported assumptions. ‘Range estimating’ is used to determine the effort and confidence required for each element when technical data and scope of the projects is not properly defined. Finally, the ‘Activity-based’ method is mainly adopted on large-scale constructions, where the material costs are detailed and added to all stages of the WBS. In this particular case, the analysis requires to have detailed information about the design, materials and labour; WBS, project, as well as the historical data, must be accurate to obtain

Related Documents

  • Improved Essays

    This case is a very good example of a good project management with high risk management. This case talks about the importance of project management process and risk management. Their approach to project management is bottom up, executive teams don’t tell project teams what to do, it project managers and project teams who provide project plans and analyse the risk and decide whether to do the project or not. Project teams take at least 6 months to bid for a RFP, and when they win the bid they know what they are going to do next. They are having a unique approach towards risk management and compliance process.…

    • 701 Words
    • 3 Pages
    Improved Essays
  • Decent Essays

    Part 1 introduces the concept of "Megaproject Parameters" to help in grasping the complexity of a Megaproject, and to aid in the development of Megaproject Organisation Design, Modelling,…

    • 314 Words
    • 2 Pages
    Decent Essays
  • Improved Essays

    X Conclusion: Overall inherent risk level Discussion for overall level is below…

    • 619 Words
    • 3 Pages
    Improved Essays
  • Decent Essays

    ECON 370 - Benefit-Cost Analysis and the Economics of Project Evaluation Techniques and problems in benefit-cost analysis of public projects. Topics include cost estimation, direct estimation of demand curves, discount rates, net present value, risk and uncertainty in CBA, and various CBA methods. 1 2 (2) COEC 394 - Government and Business Roles of government and business in the Canadian economy including effects of public policy on the business environment. Topics include moral philosophy, market failures, game theory, and various government policies on innovation, competition, trade, and sustainability. (3) COEC 371 - Investment Theory Basic concepts of finance, including security valuation, security markets, and financial decisions concerning…

    • 150 Words
    • 1 Pages
    Decent Essays
  • Improved Essays

    Risk Assessment Definition

    • 1802 Words
    • 8 Pages

    Introduction Risk is everywhere. Risk assessment is everywhere. Think about almost everything you do today, you are thinking a million miles a minute in your brain about the risk. Your thinking, “is this safe? How safe is this?…

    • 1802 Words
    • 8 Pages
    Improved Essays
  • Improved Essays

    Risk Analysis All of the parties involved have been very optimistic for the outcome of this multinational project, since they had been very well prepared to minimize the risks and uncertainties that might come during the completion of this project. Therefore, most people assumed that SCCN as one of the leading greenfield project for submarine cable network in the world that was financed in Australia and New Zealand. Just like any other project ever conducted, this project did not come without any risks involved. Some of the risks identified prior to the execution of the project, they were: Completion Risk, Market Risk, Infrastructure Risk, and Force Majeure Risk.…

    • 1361 Words
    • 5 Pages
    Improved Essays
  • Improved Essays

    Identifying and managing risks is a critical responsibility of project managers. Risk is defined as the probability of a specified threat and the subsequent impact that the event produces (Vaidyanathan, 2013). Risks can also bring about either positive or negative outcomes for a project or organization. A project manager must identify potential risks and evaluate each one to determine the severity and likelihood of each event. Only by completing the risk management process, a project manager can determine what approach would work best to avoid, mitigate, and/or transfer the risk.…

    • 730 Words
    • 3 Pages
    Improved Essays
  • Improved Essays

    Assignment 4: Project Motorcycles – The Comprehensive Project Plan Project scope and project management plan Defining the project scope is very vital in identifying the project authenticity. If the project scope is not fully defined, there will be various challenges in the project, especially during the project initial stages. The project that the department will be analyzing is how to develop and manufacture a first class motorcycle. The department that has been trusted with the mandate of implementing the project will have a semi-autonomous structure.…

    • 1682 Words
    • 7 Pages
    Improved Essays
  • Great Essays

    Woody 2000 Case Study

    • 1292 Words
    • 6 Pages

    The estimates should be definite and it can be made through development of design, stage of construction etc. The estimates must be made by taking the cues and suggestions of the subcontractors and following a standard format will help in tracking the estimate easier. c.Is lifecycle costing a factor on this project? Life cycle costing is an economic analysis where the various alternatives to the projects are estimated and the final selection of the alternatives is the one which gives the least cost. Life cycle costing is a factor in the project and the selection of the project was mainly by estimating the net present value and IRR of the project.…

    • 1292 Words
    • 6 Pages
    Great Essays
  • Improved Essays

    Given the complexity and scope of a utility company such as Velco, finding projects is not a problem. The abundance of choice can be seen as a positive or a negative. There is the freedom to choose what projects to work on, but there can also be choice overload. Project opportunities, at times, can seem unsurmountable. However, with a process set in place they become easier to actualize and complete.…

    • 1053 Words
    • 5 Pages
    Improved Essays
  • Improved Essays

    Argos Case Study

    • 900 Words
    • 4 Pages

    Risk Management: Risk Management is a methodology for distinguishing, evaluating, and prioritizing risk of various types. When the risks are distinguished, the risk manager will make a plan to minimize or wipe out the effect of negative occasions. An assortment of techniques is accessible, contingent upon the sort of risk and the kind of business. There are various risk management guidelines, including those created by the Project Management Institute, the International Organization for Standardization (ISO), the National Institute of Science and Technology, and actuarial social orders.…

    • 900 Words
    • 4 Pages
    Improved Essays
  • Superior Essays

    Cost involved in the project: The first and foremost criteria for projects…

    • 1560 Words
    • 7 Pages
    Superior Essays
  • Improved Essays

    Risk analysis is an important element of risk management process which is been introduced in the organizations on frequent basis to have a depth analysis of risks associated with petrochemical industry or some other process industries (Tularam & Attili 2012). Risk analysis is an important aspect and have a great significance in analysis of identified risk events during risk identification or hazard identification phase of risk management. Risk analysis enables the evaluation of an identified risk event about its respective frequency of occurrence as well the potential of identified risk as what could be the severity level of the consequences caused due to that particular risk event. In addition to this risk analysis is an effective approach in order to determine the relationship between the resulting outcomes of an identified risk event and probability of occurrence of risk event (Khan et al. 1998). Furthermore, after determination of this relationship between these two concepts, it becomes possible to define the risk level of an identified risk.…

    • 1227 Words
    • 5 Pages
    Improved Essays
  • Improved Essays

    Quantitative Risk Analysis

    • 1299 Words
    • 5 Pages

    Quantitative risk analysis is the one which follows the Qualitative analysis, and gives a numerical priority rating to project risks (PMI, 2009). Based on the PMBOK (PMI, 2013) quantitative risk analysis “… is the process of numerically analyzing the effect of identified risks on overall project objectives (p. 333).” This is also a process for the PM and project team to get risk data to support making decisions, which can help to reduce project uncertainties (PMI, 2013, p. 333). Based on the prior researchers’ statement, the Quantitative Risk Analysis is more complicate and even the most difficult part within risk management since it requires statistical and mathematical methods to be operated (Purnus & Bodea, 2013, p. 145). Inputs of this…

    • 1299 Words
    • 5 Pages
    Improved Essays
  • Improved Essays

    Project A has an estimated budget of €400,000 while Project B has a budget of €500,000. Based on analysis, this paper will advise the organisation on the most beneficial…

    • 1014 Words
    • 5 Pages
    Improved Essays