River Bridge Lab Report

Great Essays
Introduction: The bridge lab project was based on the given scenario in which a reliable bridge needed to be constructed over a river in order to alleviate traffic. The objective was to design a bridge to relieve traffic flow that was also safe, cost effective, and aesthetically pleasing. The constraints for this project included the budget and minimum height and width requirements. The max budget to purchase wood was $200, the minimum height at all points of the bridge was 3 inches, the minimum width of the bridge was 4 inches, and the final bridge had to accommodate a 3”x 3” platform in order to test bridge deflection at the end of construction. The following lab report shadows the steps for design evaluations by providing background information, …show more content…
That design was then optimized for the final score in order to determine the ideal contour score are maximum deflection score. After examining the outcome of the bridge, the design could have been improved by adding additional supporting members at intervals between the top and bottom portions in order to distribute the force from the 3”x 3” platform straight down as well as to the side sloping members. Another solution would have been to alter the design and have the bridge shaped more like a rectangular prism than a trapezoidal prism by changing the connections from the top and bottom portions to meet at 90 degree angles instead of the 63.4 degree angles. Future bridge designers should take note to predict the forces that act upon the bridge members and act accordingly by disbursing the forces evenly. They should also use precision in building in order to produce clean connections between members. The bridge design project taught the importance of precision, both in construction and in engineering design accuracy, distribution of total force, and the engineering design method in

Related Documents

  • Decent Essays

    River Simulation Report

    • 356 Words
    • 2 Pages

    The river simulation was a helpful activity to get introduced to civics. The simulation gave one the knowledge of how the government and people worked together. The simulation of having a drought was a creative topic to work with because there are draughts in modern time. The simulation showed different ideas and perspectives that one may have to solve the problem.…

    • 356 Words
    • 2 Pages
    Decent Essays
  • Improved Essays

    The best way to make a bridge is to use the triangle shaped method because it is the strongest…

    • 452 Words
    • 2 Pages
    Improved Essays
  • Improved Essays

    Narrow Bridge Case Study

    • 1063 Words
    • 5 Pages

    A good number of trials had been carried to test the chains of the suspension bridge while noting down all the yield and possible failure loads by Thomas Telford. Too much time was taken on testing of the chains that little attention was paid to how the light and flexible roadway might react during strong and fats winds. A large number of remedial measures were to be applied which included tying down cables that snapped soon after installation, bumpers and inclined stay cables that all seemed to bare no fruits. The oscillations it received in relatively light winds was attributed as one of the major causes of its collapse. The oscillations were due to the wind vortex shedding in the bridge deck.…

    • 1063 Words
    • 5 Pages
    Improved Essays
  • Improved Essays

    The purpose of the stream table investigation was to investigate the variables that influence erosion rates in a stream. Sediments that were eroded at or near Linganore High School end up in the Chesapeake Bay. Sediments eroded from rocks in Linganore Creek and are carried to the Monocacy River. From there, the sediments are taken to the Potomac River. The Potomac River’s water and anything loose in it are dispensed into the Chesapeake Bay.…

    • 515 Words
    • 3 Pages
    Improved Essays
  • Great Essays

    Loughberry Lake Lab Report

    • 1188 Words
    • 5 Pages

    This experiment was designed to test what the limiting nutrient was in Loughberry Lake, as well as examine the trophic state of the lake. In order to find out what the limiting nutrient was, we performed a few different tests. We began with a secchi disk test to see the transparency of the water. Then, we took water samples that we later used to test the turbidity levels of the water after adding varying amounts of phosphorous and nitrogen.…

    • 1188 Words
    • 5 Pages
    Great Essays
  • Improved Essays

    My hypothesis, if we test the water from the Conodoguinet Creek for signs of pollution, then the results would be negative for the pollution because the water appears clear at most parts of the river, is somewhat correct. Based on our findings, the degrees of pollution of the Conodoguinet Creek are very low. The phosphate levels, phosphate meaning a salt or ester of phosphoric acid (mineral acid), are at most 1. Nitrate is a salt or ester of nitric acid. The levels of nitrate are also very low, up to 1.2.…

    • 353 Words
    • 2 Pages
    Improved Essays
  • Improved Essays

    This laboratory experiment was conducted in Greenfield Station Genesee Creek River to determine the environment’s effect on the amount of diverse biological communities in a lotic river. Shredders are macroinvertebrates that feed on coarse particle organic material (CPOM). Macroinvertebrates usually stay in the same habitat and do not migrate, which may be due to them being trapped or frequently receiving a good source of food. They are also an essential part of the freshwater ecosystem by making the water less polluted due to the organic material. Our lab group hypothesized that the number of shredders in the stream does depend on the thickness of the riparian vegetation.…

    • 394 Words
    • 2 Pages
    Improved Essays
  • Decent Essays

    Bow River Research Paper

    • 170 Words
    • 1 Pages

    The Bow River is one of 47 rivers In Canada the Bow River starts in the Rocky Mountains and winds through the foothills and flows flew into the prairies where is finds the Oldman River and then forming into the South Saskatchewan River then the waters in the end it flows through the Nelson River and then into the Hudson Bay and why the Bow river is called the Bow river because the First Nations people had mad Bows and had different use for the river as well the First Nations had made bow out of and they even use the valleys to hunt buffalo. And the Bow River got its name from the reeds they had grown along the river banks and the Peigans name for it was Makhabn’’, and that meaning is ‘river where bow reeds. But this river has helped us Canadians…

    • 170 Words
    • 1 Pages
    Decent Essays
  • Improved Essays

    Chesapeake Bay Lab Report

    • 1073 Words
    • 5 Pages

    Introduction The Chesapeake Bay that is 200 miles long is considered the largest estuary in the United States. It is home to more than 17 million people (NOAA). Baltimore, one of the most important North Atlantic port is located on the Chesapeake Bay. Oysters are one of the biggest resources of the Chesapeake bay.…

    • 1073 Words
    • 5 Pages
    Improved Essays
  • Improved Essays

    Crawford Bridge All the dead of the world will sit and witnessed your death. You will see 12 hanging men and blood drenched wood. Screams to fill your ears, and a whisper that will call you to your death, if you cross Crawford bridge. . In the year 1875, a young boy that had been hung has made people live in fear up to this day.…

    • 999 Words
    • 4 Pages
    Improved Essays
  • Improved Essays

    The project includes 22 major bridge structures that will require some form of piling to provide appropriate foundation to support structures. As part of the project, a noise assessment has been undertaken and areas that are effected noise walls will be installed to reduce the level of noise. The aggregates requirements for the Morton Bay project were sourced form Holcim Quarry, Beenleigh. Up to 100mm rock was used for road settlement, Holcim is also supplying rail ballast as well as the aggregates for concrete mixes.…

    • 415 Words
    • 2 Pages
    Improved Essays
  • Improved Essays

    Andrew Carnegie My Hero

    • 461 Words
    • 2 Pages

    But a bridge that can hold a train across the four mile span of the Mississippi river? He could not think of a cheap and strong material to do this. But loyal and wanting to fulfill his boss’s dream,…

    • 461 Words
    • 2 Pages
    Improved Essays
  • Improved Essays

    The I-35W Bridge Collapse

    • 838 Words
    • 4 Pages

    Cost-Benefit: it can use on product design but I do not recommend use this principle on bridge design, which they clearly used it when working on the I-35W bridge. Structural forms: truss bridge is not as strong as other bridge types, did not use enough strong materials or solid pieces. ❖ ❖ ❖ Design-related Factors Re-design Suggestions…

    • 838 Words
    • 4 Pages
    Improved Essays
  • Improved Essays

    Building Codes Essay

    • 1194 Words
    • 5 Pages

    The process of erecting a structure has always been an immense responsibility as the lives of the public are at stake. Therefore when a building of any size loses…

    • 1194 Words
    • 5 Pages
    Improved Essays
  • Great Essays

    This study is also to review a user's view of the damage and the type of damage to the structure of the bridge. In addition, it also reviews the level of satisfaction of users of the system maintenance by the management of the Jambatan Kedua Sdn. Bhd. (JKSB).…

    • 1086 Words
    • 5 Pages
    Great Essays