Gantt charts are a format used to represent progressive and dependency data that depends on the level of investment. A Gantt chart helps in planning tasks, documenting the order of completion and the time requirements for completion. It consists of horizontal bars to represent a task along a time line making it easy, visual and simple to comprehend. It has all the tasks displayed vertically on the left section of its outlay. Every task has a corresponding horizontal bar off to the right to represent time. The size of the horizontal bar depends upon the prospected time to be taken by an activity. Its placement position in the horizontal plane depends on initial day and the final day of the task.
On advanced levels, Complex Gantt charts show
…show more content…
Such areas to be considered are technology literacy, staff skill level, organizational politics, timescales rate for business change, business risks, available resources and external sponsorship. Outcomes of the assessment is used to categorise the project as low, moderate or of high complexity. The complexity determines the overall resource budget to be invested in the project.
Advantages of a Gantt chart
A Gantt chart provides a pictorial method of managing your project. The pictorial nature makes it highly visible. It, therefore, reminds people what actually is happening with the project whether they are directly involved or not.
It creates a picture of complexity that helps in clear
…show more content…
The PERT method is not scalable when it comes to smaller projects.
The Critical Path Method (CPM) chart
Critical path method (CPM) tool is a modification of project planning and scheduling (PPS) which was used in construction undertakings that required accurate and efficient cost and time estimates. It was popularly used in construction industries. It is usually a chart that shows the main critical path of milestones. Large companies use the project management principles and tools to manage projects with a high demand on the budget and schedule. The difference between CPM and PERT is that CPM makes use of a one-time estimate per task, while PERT uses three per task.
Advantages
CPM is essential in scheduling, planning, and control of projects.
CPM enables plans, cost, schedule and time estimates to be documented and communicated.
CPM is more economical as compared to other operations.
CPM binds and motivates the whole team which enables project tasks to complete in time.
The CPM chart allows managers to determine float, slack, start and end time for the project.
Project managers are able to reduce project duration by optimally using the critical path.

Disadvantages of

Related Documents

  • Decent Essays

    What is the critical path for this project and how long is it? For this project the critical path would be: A-D-G-J-K (2+4+6+1+2) = Total of 15 days 4.…

    • 295 Words
    • 2 Pages
    Decent Essays
  • Superior Essays

    c. What is the critical path? The critical path consists of the total project timeframe, the amount of time each task will take, and whether or not certain tasks are dependent on other tasks being completed…

    • 1517 Words
    • 7 Pages
    Superior Essays
  • Superior Essays

    Project Strategy and Planning When planning for the Alliance Prototype Project, we took a very structured approach. Group members were assigned formal roles, which were then used to delegate portions of the planning document. Each section of the planning document was completed individually, but was revised at a follow up meeting where the group discussed their rationale behind each of their decisions. When formulating the scope statement, our Quality Manager focused on key deliverables and defined constraints, synthesizing the available information into one cohesive statement. Our Risk Manager brainstormed a list of all possible risks when executing the simulation, assigned probability and cost impacts to each, and then decided whether to accept…

    • 1288 Words
    • 5 Pages
    Superior Essays
  • Great Essays

    • A project management is an application which is to be maintained by the knowledge and skills. The project manager should plan a task with a lot of planning he should be maintain patience towards the workers by upgrading with budget provided by the client and involves the safety issues of the employees and even maintaining the project requirements. 8.What are the key elements of a Project Management Plan? • A best project management plan makes a project manager maintain the task and complete the task easier. • The essential elements in the project plan to prevent the hit of the targets and to run the project smoothly from the start to the…

    • 824 Words
    • 4 Pages
    Great Essays
  • Superior Essays

    The model incorporates different levels that can help make the plan effective. The Plan phase involves deciding how to plan the project, who will run said project, what tools will the professionals need to succeed, and what reference point data should be composed. The Project Organizers will then discuss what is being cultured from doing this project, determine what happened when the plan was activated, and list any problems encounter. Next, the professionals will study the data collected and gauge what each measure showed.…

    • 1003 Words
    • 5 Pages
    Superior Essays
  • Superior Essays

    By not doing so, labor, material, equipment, and funding requirements do not provide any benchmarks and the per-period cost of the project is not accurately reflected, leading to the project going over budget and wasting of scheduled resources not in use. Accurately reflecting this information will reduce the probability of the program slipping off schedule and budget. The critical path is the sequencing of the project to determine the minimum and maximum time needed for an operation. The Deepwater project did not develop and accurate program schedule, therefore, no critical path was determined. Failing to do determine the critical path put the management team at a significant disadvantage and unable to monitor activities that may have a detrimental effect on the project down the road.…

    • 1150 Words
    • 5 Pages
    Superior Essays
  • Decent Essays

    Case Study 8 The Ccmma

    • 783 Words
    • 3 Pages

    If, in the previous step, a new constraint has been uncovered, repeat the process. She detail explained by using the process of Critical Chain Method, projects can be completed more quickly and with greater scheduling reliability. The difference between traditional and Critical Chain scheduling is in how uncertainty is managed. In traditional project scheduling, uncertainty is managed by padding task durations, starting work as early as possible, multi-tasking, and focusing on meeting commitment dates.…

    • 783 Words
    • 3 Pages
    Decent Essays
  • Improved Essays

    Case Analysis Paper

    • 701 Words
    • 3 Pages

    What adjustments would you make at this point? Would you cancel the program or run it at a loss? Considering resources such as time, effort, and finances have already been consumed I will allow the program to continue. Firstly it may prove beneficial to change the due date for applicants to register by.…

    • 701 Words
    • 3 Pages
    Improved Essays
  • Improved Essays

    Project Manager Interview

    • 547 Words
    • 3 Pages

    I interviewed a colleague whose career followed an interesting arc into project management. Michael S. joined the US army immediately after graduating high school, and upon discharge in 1991, entered retail management. He first attempted to apply the discipline gained by his Army service as he faced the challenge of opening a chain of five music stores in five months. However, he recognized that repetitively opening retail locations within such a short timespan required defining and controlling a set sequence of events.…

    • 547 Words
    • 3 Pages
    Improved Essays
  • Great Essays

    Woody 2000 Case Study

    • 1292 Words
    • 6 Pages

    Project Planning a. What should be included in a Woody 2000 project plan? What use would it be? Ans. The project requires the creation of a project scope, charter, schedule, budget, communication, risk, contingency, and close out plan thereby ensuring that the project are is well defined, communicated, monitored and controlled. Woody's project plan should also include: - Sales Assessment-…

    • 1292 Words
    • 6 Pages
    Great Essays
  • Improved Essays

    Nayatel Case Study

    • 1443 Words
    • 6 Pages

    After the implementation of the Project Management Office, project achievement turned out to be more up and coming due to the deliberate, and more controlled asset arranging and streamlining introduced by the Project management office. Tools like resource calendars and histograms have helped not just determination issues identified with deficiency of assets, yet in addition execute backups and substitutes. 2.BENEFITS OF PMO: PMO helps the organization with a number of benefits which are as…

    • 1443 Words
    • 6 Pages
    Improved Essays
  • Improved Essays

    It is the ability to identify deviations from cost, schedule and performance. Then identifying courses of action to take control of deviations and further implementing the appropriate course of action to obtain the desired outcome (PMBOK, 2013). Project Managers will spend a lot of time planning, executing and coping with changes along the way. There are tools and mechanisms that can assist the project manager in tracking project progress and efforts like: expert judgement, analytical techniques, meetings, earned value management, performance reviews, risk reassessments, inspections and…

    • 885 Words
    • 4 Pages
    Improved Essays
  • Improved Essays

    Nissan Case Study

    • 1038 Words
    • 5 Pages

    Under the framework that is shared by both, is the division of a project in sets of activities, all of them happening after the predecessors are completed. The main difference between CPM and PERT is the nature of the time required to complete each activity. CPM considers that the time for an activity is fixed; it is discrete and doesn’t change between the planning and the actual happening on the activity. On the other hand, PERT considers the duration of the activities as open to probabilities, and consequently, the time of duration cannot be explicitly calculated and only estimated times can be proposed.…

    • 1038 Words
    • 5 Pages
    Improved Essays
  • Improved Essays

    And finally to develop and implement a project plan; based on major tasks, duration of each task, target dates, measuring evaluating completion and…

    • 768 Words
    • 4 Pages
    Improved Essays
  • Improved Essays

    Construction Project Management Principles. ASSIGNMENT -1 Introduction: What is Construction Project Management?…

    • 2279 Words
    • 10 Pages
    Improved Essays