BSOP 429 Week 8 Final Exam – Updated 2014 BSOP 429 Week 8 Final Exam – Set 1
 Page 1
1. (TCO 4) The priority rule, which will sequence jobs in the order they are received, is _____. (Points : 5)
2. (TCO 2) In an assignment method problem, if it takes Abe 3 hours to build a birdhouse and 4 hours for a doghouse, and Betty takes 4 hours for a birdhouse and 3 hours for a doghouse, what is the reduced cost (in hours) of assigning Betty to build the doghouse? (Points : 5)
…show more content…
(TCO 4) Differentiate between infinite loading and finite loading as two major approaches used to load work centers. (Points : 25)
5. (TCO 12) The theory of constraints has a goal of maximizing flow through the entire system. (Points : 25)
6. (TCO 2) Refer to the following data for jobs waiting to be processed at a single work center (jobs are shown in order of arrival):
7. (TCO 10) Respond to the question: “Which is better, MRP or JIT?” (Points : 25)
8. (TCO 1) The design of the MPC system is influenced by some key features of market demand and product design. Name the key features that will lead to an assemble-to-order system and explain the rationale. (Points : 25)
9. (TCO 6) Market requirements drive the choice of the shop floor system approach. Describe and explain the type of market requirements that would be suitable for an MRP-based system, along the lines of product design, product variety, product volume per period, product mix changes, and delivery schedule changes. (Points : 25)
10. (TCO 10) Manufacturing strategy also drives the choice of shop floor system. Describe and explain the strategies that lend themselves to a JIT-based system, from the perspective of WIP, changeover cost, and process choice. (Points : 25)
BSOP 429 Week 8 Final Exam – Set 2
 Page 1
1. (TCO 4) The two different approaches to load work centers in job-shop scheduling are (Points :