1. (TCO 4) The priority rule, which will sequence jobs in the order they are received, is _____. (Points : 5)
2. (TCO 2) In an assignment method problem, if it takes Abe 3 hours to build a birdhouse and 4 hours for a doghouse, and Betty takes 4 hours for a birdhouse and 3 hours for a doghouse, what is the reduced cost (in hours) of assigning Betty to build the doghouse? (Points : 5)
3. (TCO 2) A major difference between manufacturing and service systems in terms of
…show more content…
(TCO 4) Differentiate between infinite loading and finite loading as two major approaches used to load work centers. (Points : 25)
5. (TCO 12) The theory of constraints has a goal of maximizing flow through the entire system. (Points : 25)
6. (TCO 2) Refer to the following data for jobs waiting to be processed at a single work center (jobs are shown in order of arrival):
7. (TCO 10) Respond to the question: “Which is better, MRP or JIT?” (Points : 25)
8. (TCO 1) The design of the MPC system is influenced by some key features of market demand and product design. Name the key features that will lead to an assemble-to-order system and explain the rationale. (Points : 25)
9. (TCO 6) Market requirements drive the choice of the shop floor system approach. Describe and explain the type of market requirements that would be suitable for an MRP-based system, along the lines of product design, product variety, product volume per period, product mix changes, and delivery schedule changes. (Points : 25)
10. (TCO 10) Manufacturing strategy also drives the choice of shop floor system. Describe and explain the strategies that lend themselves to a JIT-based system, from the perspective of WIP, changeover cost, and process choice. (Points : 25) BSOP 429 Week 8 Final Exam – Set 2 1. (TCO 4) The two different approaches to load work centers in job-shop scheduling are (Points : 5)
2. (TCO 2) The priority rule where jobs are processed according to the smallest