Appendix B : Bros Information Essay examples

1107 Words Sep 29th, 2016 5 Pages
Appendix B – BROS Information

PURPOSE:
The following provides information on the “BES Reliability Operating Services” (BROS) noted in this procedure and the CIP-002 standard.

USAGE:
BROS was introduced in the Guidance and Technical Basis section of the CIP-002 standard, and are based on the NERC Reliability Functional Model. The purpose of the BROS is to assist Responsible Entities (i.e. FPL) in the identification services essential to the reliable operation of the BES asset, and the Cyber Assets associated with those essential services.

For CIP-002 the BROS have been identified as:

BROS Name Brief Description
Dynamic Response Includes those actions performed by BES Elements or subsystems which are automatically triggered to initiate a response to a BES condition.
Balancing Load & Generation Includes activities, actions and conditions necessary for monitoring and controlling generation and load in the operations planning horizon and in real‐time.
Controlling Frequency Includes activities, actions and conditions which ensure, in real time, that frequency remains within bounds acceptable for the reliability or operability of the BES.
Controlling Voltage Includes activities, actions and conditions which ensure, in real time, that voltage remains within bounds acceptable for the reliability or operability of the BES.
Managing Constraints Includes activities, actions and conditions that are necessary to ensure that elements of the BES operate within design limits and…

Related Documents