• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/78

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

78 Cards in this Set

  • Front
  • Back
The Control Room calls the Radwaste Operator and reports the Auxiliary Steam System radiation monitor FB RE-50 is in alarm.What automatic action takes place when FB RE-50 is in alarm? A. FB PCV-29, Auxiliary Steam Control Valve Closes.B. Starts the Auxiliary Steam Condensate Transfer Pump.C. Closes Auxiliary Steam Condensate Tank outlet valve, FB-V168.D. Starts the Auxiliary Steam Feedwater Pump.
A
What function does the Auxiliary Steam Boiler fulfill for the Auxiliary Steam System? A. provides a means to produce low pressure steam on a loss of all AC powerB. produces low pressure steam with heat from a forced air oil fireC. generates low quality steam using Main or Extraction Steam as a heat sourceD. supplies high quality, low pressure steam by superheating extraction steam
B
As turbine load increases past 80% during a plant startup, the source of heat for the Auxiliary Steam Reboiler will switch to which of the following? A. Main Steam HeaderB. 3rd stage extraction steamC. Auxiliary Steam System ReboilerD. 5th stage extraction steam
D
What is the main purpose of the Coffey County Lake (WCGS Cooling Lake)? A. provide NPSH for the auxiliary raw water pumps.B. provide cooling water for the emergency diesels.C. provide a final heat sink for the plant.D. provide suction for the makeup pumps.
C
Which from the following, describes the function of the Cooling Lake baffle dikes and channels? A. Provides increased travel time of water from discharge to intake.B. Provide protection from inland tidal waves.C. Provide environmental control of fish and animals.D. Provide erosion control of the lake boundaries.
A
The Main Steam Line Isolation Valve will open in approximately _______________, and must FAST close within __________________. A. 5 minutes / 5 secondsB. 3 minutes / 10 secondsC. 7 minutes / 3.5 secondsD. 1 minute / 1 second
A
Which of the following indicates which Main and Reheat Steam System component is designed to automatically operate to prevent an uncontrolled blowdown of all Steam Generators in case of a Main Steam header rupture inside containment? A. Main Steam Isolation ValveB. Main Steam Dump ValveC. Main Steam Safety ValveD. Main Steam Atmospheric Relief Valve
A
A piston position switch is mounted on the outside of each of the two accumulators for each Main Steam Isolation Valve (MSIV) in order to ________________________________. A. directly monitor the hydraulic fluid reservoir levelB. monitor the hydraulic fluid volume contained in the accumulatorsC. monitor hydraulic system pressureD. provide local indication of MSIV position
B
With the unit at 100%, Steam Line Safety AB-V065 lifts at 1000 psig then reseats.How would this impact plant operation? A. Plant operation can continue provided power is reduced to 87%.B. No restrictions apply.C. Plant operation can continue with no restrictions provided four S/G ARVs are operable.D. Plant operation can continue provided Power Range High Flux setpoint is adjusted to 87%.
A
The plant is operating at 100% power when a nonisolable steamline break and reactor trip occurs. The RCS cools down 80?F when the SG finally blows dry.If the same size steam break occurred at 0% power at no-load Tavg (557?F), how would the cooldown have differed? A. More severe because the RCS is at a lower temperature.B. Less severe because the RCS is at a lower temperature.C. Less severe because there is less water in the SG.D. More severe because there is more water in the SG.
D
The unit is in Mode 1 at 100% RTP. - At 0400 on 7/1, one Main Steam Safety Valve (AB-V0055) is declared inoperable. - At 0700 on 7/1, a second Main Steam Safety Valve (AB-V0065) is declared inoperable.What RTP restriction(s) exist for this condition? A. Thermal Power must be < 87% RTP by 0800 an < 65% RTP by 1100 on 7/1.B. Thermal Power must be < 87% RTP by 0800 on 7/1.C. Thermal Power must be < 65% RTP by 0800 on 7/1.D. Thermal Power must be < 65% RTP by 1100 on 7/1.
A
What is the source of heating steam for the Main Steam System Moisture Separator Reheater 2nd state reheater? A. Main Steam SystemB. 3rd stage extraction from the High Pressure TurbineC. Steam Seal System gland seal leakoffD. Auxiliary Steam System
A
The major components of the Main Steam System which could actuate to control steam pressure as it increases above 1185 psig, upon fast closure of MSIVs at 100% power are ________________ and ________________. A. Atmospheric Relief Valves and Steam Header Safety ValvesB. Steam Dumps and Atmospheric Relief ValvesC. Atmospheric Relief Valves and SG BlowdownD. Steam Dumps and SG Safety Valves
A
What is the source of steam for Moisture Separator Reheater first stage reheating? A. Low Pressure Turbine ExhaustB. High Pressure Turbine 3rd stage extractionC. The Auxiliary Steam SystemD. The Main and Reheat Steam System
B
The sources of steam to the Moisture Separator Reheaters (MSR) 1st and 2nd stage reheater sections are_____________. A. 3rd stage extraction and Main Steam respectivelyB. Main Steam and auxiliary steam respectively.C. 5th stage extraction and main steam respectively.D. 2nd stage extraction steam and auxiliary steam respectively.
A
What is the purpose of the Main and Reheat Steam System Combined Intercept Valves? A. Isolate the Low Pressure (LP) Turbines from the Reheat System steam after a turbine trip to prevent turbine overspeed.B. Capture steam in the Moisture Separator Reheaters after a turbine trip to prevent corrosion.C. Divert main steam from the turbine when the condenser is not available.D. Isolate the turbine from the Main and Reheat Steam System to unload the turbine after a trip signal.
A
Which of the following are types of moisture separators used in the Steam Generators? A. Swirl Vanes and ChevronB. Cyclone and ChevronC. Desiccant and BlowdownD. Cyclone and Blowdown
A
Which of the following describes the purpose of supplying steam blanketing to the Main Steam System Moisture Separator Reheaters during shutdown? A. Allow testing of MSR Drain Tank Level Control Valves.B. To ensure sufficient load on Auxiliary Boiler for main gun operation.C. Prevents corrosion of reheater tubes.D. Pre-heat Main and Reheat Steam System piping before startup.
C
What is the purpose of the Main and Reheat Steam System Moisture Separator Reheaters? A. Serves as a stored steam supply for the Main Turbine in the event of a momentary loss of main steam.B. Provides preheat to the Main Feedwater prior to sending it to the Steam Generators.C. Provides preheat to condensate prior to sending it to the suction of the Main Feedwater Pumps.D. Removes moisture droplets and reheats the HP Turbine exhaust steam.
D
The Steam Generator atmospheric relief valves fail _____on a loss of air pressure, and are provided with a backup supply of ________for continued operation. A. closed / nitrogen gasB. open / nitrogen gasC. closed / instrument air accumulatorD. open / instrument air accumulator
A
The manual controllers for the Steam Generator (S/G) Atmospheric Relief Valves (ARVs) AB PV-002 and AB PV-003, are installed ___________________________. A. for manual control in the event that fire has inhibited control of the valves.B. on the ARVs air actuator (valve positioner) and inhibit control functions when selected to "Local".C. near the associated valve and may be selected, as required, to "Remote", "Local", "Auto", or "Off".D. at the Auxiliary Shutdown Panel (ASP), and can remove control from the Main Control Room.
A
The plant is operating at 100% power with the Red Train accumulator on AB HV-14, A SG MSIV, out of service. The Yellow Train accumulator low pressure alarm on the ESFAS status panel backlights red. The BOP reports that AB HV-14 Yellow Train accumulator pressure is 4800 psig and stable. When STS AB-002 was last performed the accumulator temperature was 1000 F and nitrogen pressure was 3490 psig. The accumulator temperature is now 1050F.What action (if any) is required? A. Accumulator pressure must be raised to > 4902 psig.B. The valve is operable, no action required.C. Accumulator pressure must be raised to > 5094 psig.D. Accumulator pressure must be raised to > 4850 psig.
A
The plant is shutdown in Mode 3 cooling down to Mode 5. The following conditions exist:* RCS Temperature 488 degrees F* RCS Pressure 1890 psig* Ctmt Pressure 0.4 psig* PZR Level 35%* S/G Pressures A) 595 psig B) 592 psig C) 597 psig D) 595 psig* MSIVs OPEN60 seconds later the conditions are:* RCS Temperature 472 degrees F* RCS Pressure 1830 psig* Ctmt Pressure 4 psig* PZR Level 17%* S/G Pressures A) 510 psig B) 515 psig C) 461 psig D) 512 psigWhat is the current status of the MSIVs and why? A. MSIVs - CLOSED, due to low RCS pressure.B. MSIVs - CLOSED, due to high steam pressure rate.C. MSIVs - OPEN, no Safety Injection signal is present.D. MSIVs - OPEN, no Main Steam Line Isolation signal present.
B
The Unit is operating with the following Main Control Board indications:* Reactor tripped* PZR level 10%* PZR Pressure 1750psig* Steam line pressures 870psig* CTMT Pressure 3.5psigWhich of the following Engineered Safety Features Systems would NOT have received an ESF actuation signal based on the above plant conditions? A. Feedwater Isolation (FWIS)B. Control Room Emergency VentilationC. Containment Purge Isolation System (CPIS)D. Main Steam Line Isolation (MSLIS)
D
What instrumentation is located on the Radwaste Control Room Panel (BM-157) to monitor Steam Generator Blowdown System mixed bed demineralizer performance? A. Demineralizer outlet flow metersB. Demineralizer dP metersC. Decontamination Factor (DF) metersD. Demineralizer conductivity meters
D
The Radwaste Operator receives the alarm, Blowdown Flash Tank Level High-Low, and level is HIGH.Which automatic actions take place? A. Blowdown Isolation Valves, BM HV-1,2,3,4, and sample valves, BM HV-5 through 8, closeB. Blowdown Upper Sample Isolation Valves, BM HV-19 through 22, closeC. Blowdown Flash Tank Vapor Discharge to #5 heater, BM PCV-39 opensD. Blowdown Sample Isolation Valves, BM HV-65 through 68, close
A
Which of the valves listed below are controlled by the Steam Generator Blowdown Flash Tank level controller, BM LIC-16? A. S/G Blowdown Flash Tank to atmosphere (BM PV-072), Demineralizer Discharge to Main Condenser (BM LV-16B)B. Demineralizer Discharge to Blowdown Surge Tank (BM LV-16A), S/G Blowdown Surge Tank to Liquid Radwaste (BM FV-054)C. Demineralizer Discharge to Blowdown Surge Tank (BM LV-16A), Demineralizer Discharge to Main Condenser (BM LV-16B)D. Demineralizer Discharge to Condensate Storage Tank (BM LV-16C), S/G Blowdown Flash Tank to Main Condenser (BM PV-039A)
C
The immediate effect of a large Steam Generator Tube Rupture on the Steam Generator Blowdown System during normal 100% power operation would be that BM RE-25 would initiate an interlock signal to the: A. Service Water to non-regenerative heat exchanger valve to closeB. Blowdown and Sample Process Isolation SignalC. flash tank relief valve to openD. flash tank vapor to condenser valve to open
B
Steam Generator Blowdown Flash Tank vapor discharge pressure controller (BM PIC-39) controls vapor flowpath to either __________________________ or __________________. A. Low Pressure condenser (PV-39B) / High Pressure condenser (PV-39A)B. Atmosphere (PV-072) / Heater Drain Tank (PV-39A)C. #5 feedwater heater (PV-39A) / Main Condenser (PV-39B)D. Heater Drain Tank (PV-39A) / Atmosphere (PV-072)
C
Steam Generator Blowdown total flow can be read ________________. A. S/G Blowdown Regenerative Heat Exchanger outletB. S/G Blowdown demineralizer inletC. on Panel BM-157 in the Radwaste Control RoomD. S/G Blowdown filter outlet
C
What Blowdown (BM) valves are closed by a SGBSIS? A. HV-54; PV-16; TV-40; PV-39AB. HV-1; HV-19; HV-35; HV-65C. HV-2; HV-19; PV-39; PV-16D. HV-4; HV-68; PV-39A; HV-37
B
Which of the following locations of the SGBS, is monitored by a process radiation monitor? A. Discharge of the SGBS Non-Regenerative Heat ExchangerB. Discharge of the Mixed Bed DemineralizersC. Inlet to the Primary Sample Station, Panel SJ-143D. Discharge to the Main Condenser
A
The plant is in Mode 6, Steam Generators "A" and "C" are draining to Area 5 sump per SYS BM-201, STEAM GENERATOR DRAINING.* Neither S/G is open to Containment.* Containment Closure is required to move fuel.What is the minimum action regarding S/G draining required, if any, to establish Containment Closure? A. S/G "A" and "C" draining may continue provided an Engineering evaluation is performed.B. S/G "A" and "C" draining must be terminated.C. S/G "A" and "C draining may continue, no action is required.D. S/G "A" and "C" draining may continue provided Administrative Controls are established.
C
Discharge of the Steam Generator Blowdown Surge Tank to the environs is in progress when a BSPIS terminates the release.What could have generated the signal terminating this release? A. Low Flash Tank LevelB. High Non-Regenerative HX outlet temperatureC. Low Surge Tank LevelD. High radiation activity on the discharge
D
Which valves require an initiating isolation signal be reset to open? A. Blowdown Containment Isolation Valves BM HV 1-4B. Sample Outer Containment Isolation Valves BM HV 65-68C. Upper Sample Isolation Valves BM HV 19-22D. Sample Isolation Valves BM HV 35-38
A
During a release of Steam Generator Blowdown to the lake, all running Circulating Water Pumps trip.What automatic action occurs with discharge to the lake? A. Blowdown Discharge Isolation, BM LV-56 closesB. Steam Generator Sample Isolation Valves, BM HV65/66/67/68, closeC. SG Blowdown Discharge Pumps, PBM01A/B, tripD. Blowdown Containment Isolation Valves, BM HV1/2/3/4, close
A
Annunciator window 00-061D, SG BLOWDOWN SAMP ISO, alarmed.* BM-HV001, 2, 3 and 4, S/G B/D Isolation Valves, are closed.* BM-HV019, 20, 21 and 22, S/G B/D Nuclear Sample System Upper Line Isolation Valves, are closed. * BM-HV035, 36, 37 and 38, Nuclear Sample System Lower Line Isolation Valves, are closed.* BM-HV065, 66, 67 and 68, S/G B/D Nuclear Sample System Line Isolation Upstream Valves, are closed.What event could be the cause? A. Steam Generator C at 83% in MODE 2B. Trip of B Main Feed Pump at 4% power.C. BM-RE25 Process Rad Mon High-HighD. Inadvertant Containment Spray actuation
B
What specific locations in the Steam Generator Blowdown System (SGBS) flow path are monitored by process radiation monitors? A. Vapor from the Flash Tank and effluent from Non-Regenerative Heat ExchangerB. Vapor discharge from Flash Tank and discharge pumps to Liquid RadwasteC. Effluent from Regenerative Heat Exchanger and Demineralizer return to CondenserD. Discharge pumps to Liquid Radwaste and effluent from the Non-Regenerative Heat Exchanger
D
The plant is in MODE 5 after a refueling outage and heating up in preparation for a plant startup when a Blowdown Containment Isolation valve is found INOPERABLE and can not be isolated.What effect (if any) will this condition have on the startup? A. MODE 4 entry is prohibited.B. Startup may continue IF CTMT leak rate is NOT exceeded.C. MODE 4 entry is allowed if 3.0.4.b is performed.D. MODE 4 entry is permitted, MODE 3 is a restraint.
C
Which valves are closed by a Steam Generator Blowdown and Sample Isolation Signal? A. Blowdown Isolation valves only.B. Blowdown Isolation and Upper Sample Isolation valves only.C. Blowdown Isolation, Upper Sample Isolation, Lower Sample Isolation, and Blowdown Sample Isolation Valves.D. Blowdown Isolation, Upper Blowdown Sample Isolation, and Lower Blowdown Sample Isolation valves only.
C
The outlet temperature of the Steam Generator Blowdown System Regenerative Heat Exchanger is controlled: A. to <1800F to prevent damage to the non-regenerative heat exchanger.B. by a temperature controller which controls the amount of blowdown flow through the heat exchanger tubes.C. by the temperature of the condensate in the heat exchanger shell since no control valve is installed.D. by a temperature controller which controls the amount of condensate flow through the heat exchanger shell.
D
Which valves are controlled by the Steam Generator Blowdown Flash Tank level controller, BM LIC-16? A. Demineralizer Discharge to Blowdown Surge Tank (BM LV-16A), Demineralizer Discharge to Main Condenser (BM LV-16B)B. Demineralizer Discharge to Blowdown Surge Tank (BM LV-16A), S/G Blowdown Surge Tank to Liquid Radwaste (BM FV-054)C. Demineralizer Discharge to Condensate Storage Tank (BM LV-16C), S/G Blowdown Flash Tank to Main Condenser (BM PV-039A)D. S/G Blowdown Flash Tank to atmosphere (BM PV-072), Demineralizer Discharge to Main Condenser (BM LV-16B)
A
What will initiate a Blowdown Sample Process Isolation Signal (BSPIS)? A. undervoltage on either NB busB. high temperature ot non-regenerative heat exchanger outletC. blowdown surge tank level highD. blowdown demineralizer high differential pressure
C
The plant is at normal 100% power. What circumstance from the list below will cause a Steam Generator Blowdown and Sample Isolation Signal (SGBSIS)? A. Trip of both Main Feedwater PumpsB. High level in the Steam Generator Blowdown flash tank, BM-LSH0070C. High radiation indicated from BM RT-25, Steam Generator Blowdown Process MonitorD. High temperature at the Non-Regenerative Heat Exchanger outlet, BM-TSH0073
A
With the Steam Generator Blowdown System in normal alignment at 100% power operations, a hi-hi level develops in the flash tank and closes the vapor discharge to the Number 5 feedwater heaters. Which one of the following is a lineup option if the Radwaste Operator has to release the vapor in the flash tank? A. Miscellaneous Condensate Drain TankB. #7 Feedwater HeatersC. Main CondenserD. Heater Drain Tank
C
The Radwaste Operator receives the alarm " Blowdown to Demineralizer Temperature High".What action occurs? A. Blowdown Isolation Valves BM HV 1-4 closeB. Regenerative Heat Exchanger Temperature Control Valve, BM TCV-40, opensC. Blowsown Sample Isolation Valves BM HV5-8 closeD. Flash Tank Vent to Condenser, BM PV-39B opens
A
What signals will directly generate a Steam Generator Blowdown and Sample Isolation Signal? A. Control Room Ventilation Isolation Signal; Auxiliary Feedwater Actuation Signal; and Safety Injection SignalB. Auxiliary Feedwater Actuation Signal; Safety Injection Signal; and Undervoltage on NB01 or NB02C. Safety Injection Signal; Undervoltage on NB01 or NB02; and Containment Isolation Signal Phase BD. Fuel Building Isolation Signal; Control Room Ventilation Isolation Signal; and Auxiliary Feedwater Actuation Signal
B
The Steam Generator Blowdown System has just experienced an isolation due to high radiation which initiated a Blowdown and Sample Process Isolation Signal (BSPIS).What interfacing systems is used to check which steam generator is contaminated? A. Radwaste Nuclear Sampling SystemB. Condenser Off-gas SystemC. Secondary Liquid Waste SystemD. Nuclear Sampling System
D
The plant is in Mode 6. Steam Generators "A" and "C" are draining to the Area 5 sump SYS BM-201, STEAM GENERATOR DRAINING.* S/G "A" is open to Containment.* Containment Closure is required for moving fuel.What is the minimum action required to establish Containment Closure? A. S/G "A" and "C" draining may continue provided Administrative Controls are established.B. Both S/G "A" and "C" draining must be terminated.C. S/G "C" draining may continue but S/G "A" draining must be terminated.D. S/G "A" and "C" draining may continue provided an Engineering evaluation is performed.
C
Discharge of the Steam Generator Blowdown Surge Tank to the environs is in progress when a BSPIS terminates the release.What could have generated the signal terminating this release? A. Low Flash Tank LevelB. Low Surge Tank LevelC. High discharge ActivityD. High Non-Regenerative HX outlet temperature
C
The plant is at 60 % power with systems in their normal lineup, when an 11% step increase in turbine load occurs.What is the response of the Steam Dump Valves? A. Armed, dumping steamB. Not armed, dumping steamC. Armed, not dumping steam D. Not Armed, not dumping steam
D
Following a reactor trip, a failure in the Yellow Train cabinet (Loss of NK04) causes the Yellow Train P-12 solenoids to de-energize. What describes the Steam Dump System response, S/G pressure response, and expected Tavg response? A. All steam dump valves go closed; S/G pressures remain the same; and Tavg will stabilize at 561 degrees F.B. All 12 Steam Dumps go closed; S/G pressure will increase until ARVs open to maintain pressure; and Tavg will increase.C. 6 Steam Dump valves will fail closed; S/G pressure will increase slightly until remaining steam dump valves reach their setpoint; and Tavg will increase slightly.D. Three steam dump valves fail closed; S/G pressure remains the same; and Tavg remains unchanged.
B
The plant is operating at 50% power with Steam Dumps selected to the Tavg Mode. A 7.5% /Min. ramp load decrease occurs for 3 minutes.Final Plant conditions:* Rx Power 27%* Tavg 566.80F* Tref 565.50FWhat is the status of the Steam Dumps? A. Armed, not openB. Armed, Tripped openC. Not armed, not openD. Not armed, modulated open demand
A
The plant is at the following conditions:* Mode 3 -Shutdown banks withdrawn* Tavg = 5570F being controlled by steam dumps in Steam Pressure Control Mode* RCS pressure = 2235 psig* All RCPs are in serviceA complete loss of Main Condenser vacuum occurs.Tavg should stabilize at ___________degrees F? A. 557B. 550C. 564D. 561
D
Given the following plant conditions:* Reactor tripped from 100% power* "B" Reactor Trip Breaker is open* "A" Reactor Trip Breaker is closed* Steam Dump selector switch is in "Tavg" ModeWhich of the following demonstrates the status of the Steam Dump valves as a result of this transient? A. Steam Dump valves arm from Reactor Trip signal and modulate on Load rejection Controller.B. Steam Dump valves will not arm unless selector switch placed in Steam Pressure Mode.C. Steam Dump valves arm from Load Rejection signal and modulate on Load Rejection Controller output.D. Steam Dumps armed from Load Rejection signal and modulate on Reactor Trip Controller output.
D
Each Condenser steam dump valve is designed to trip open in _____ seconds, and trip closed in _____ seconds. A. 3 / 5B. 5 / 5C. 5 / 3D. 3 / 3
A
The plant is at 90% power, when the Main Turbine abruptly loses 35% of its load.The Steam Dump System responds to this transient by arming and initially tripping open _________ groups of dump valves. Dump valves in the Steam Dump System will modulate until Tavg ______________. A. all / comes to within 20F of TrefB. all / matches TrefC. two / matches TrefD. two / comes to within 20F of Tref
D
The Steam Dump System is designed to: A. Bypass 40% of the total steam flow with any given 10% load step change without a reactor trip.B. Bypass 50% of the total steam flow to the condenser without a reactor trip.C. Bypass 40% of the total steam flow to the condenser without a reactor trip.D. Bypass 50% of the total steam flow with any given 10% load step change, without a reactor trip.
C
The plant is at 70% power. The steam dump valves are armed (but closed) from an earlier load rejection. Channel II, RCS Tavg now fails to 586.5?F.How will the Steam Dump initially respond to this event? A. Groups 1 and 2 trip open, Group 3 is throttled, while Group 4 is closed.B. Groups 1 and 2 tripped open, Group 3 full open, Group 4 throttled.C. Groups 1 and 2 throttled open, Groups 3 and 4 closed.D. Groups 1, 2, 3, and 4 are closed.
A
What is the C-9 setpoint and logic coincidence? A. <4.0" HgA on 2/2 pressure switchesB. <5.0" HgA on 2/2 pressure switchesC. <5.0 "HgA on 1/2 pressure switchesD. <4.0" HgA on 1/2 pressure switches
B
A loss of condenser vacuum is occurring and power has been reduced from 100% to 75% over the past 5 minutes.The following conditions exist:Auct. High Tavg 5900FReactor/Turbine Power 75%/770 MweLP Condenser Pressure 4.8" HgAIP Condenser Pressure 5.1" HgAHP Condenser Pressure 5.5" HgAWhat is the expected Steam Dump response with these conditions? A. 8 Steam Dump valves are available, and 6 are open with 1 partially open.B. 7 Steam Dump valves are available, and all are open.C. 4 Steam Dump valves are available, and 3 are open and 1 is partially open.D. 11 Steam Dump valves are available, and 6 are open, and 3 are partially open.
B
Plant conditions are as follows:* Mode 1* 100% Reactor Power* All Automatic controls in their normal position.* BBTY411, Loop 1 Tavg fails at 588.50F* A Reactor Trip occurs.No operator actions are taken. Which one of the following describes the plant response? A. Steam Dumps will be open. The RCS will cooldown until Tavg reaches 5500F, then the steam dump valves will cycle closed and open to maintain this temperature.B. Steam dumps will be open. The RCS will cooldown until main steam pressure reaches 615 psig, then the MSIV's will close and the RCS will heat up again.C. Steam dumps will be open. The RCS will cooldown until Tavg reaches 5570F, then the steam dump valves will throttle to maintain this temperature.D. Steam dumps will be open. The RCS will cooldown until main steam pressure reaches 1092 psig, then the steam dump valves will throttle to maintain this pressure.
A
Which of the following correctly describes the C-7 interlock and its relationship to the Steam Dump System? A. It arms the steam dump valves on a turbine load rejection.B. Receives inputs from P-10 and P-13 protective circuits.C. Stops further turbine loading by closing the control valves.D. Enabled by 2 RCS loop Tavg channels <550 degrees F.
A
Which of the following does NOT input to the "C" solenoid (arm) in the Steam Dump System? A. Steam Dump Mode Selector SwitchB. P-4C. C-7D. P-12
D
At equilibrium 100% power operation, a load rejection (to 0% power) occurs.What would be the INITIAL plant response if the condenser steam dump valves failed to open? A. Main steam pressure would increase. RCS temperature and pressure would increase.B. Main steam pressure would decrease. RCS temperature and pressure would decrease.C. Main steam pressure would decrease. RCS temperature and pressure would increase.D. Main steam pressure would increase. RCS temperature and pressure would decrease.
A
The Main Turbine Tripped after a runback to 90% Power.All Systems responded normally to the trip.Which one of the following is the expected position of the steam dump valves with Tavg at 5750F? Full Open Modulating Full Closed A. 9 3 0B. 3 3 6C. 6 3 3 D. 12 0 0
C
Unit is in Mode 3, Hot Standby with the following conditions:* Cooldown to Mode 4 was stopped until after shift turnover is completed.* Steam Dump Selector Switch is in Steam Pressure Mode.* Bypass interlock selected on both selector switches.* AB PK-507 is in automatic with pot set to control RCS temperature at 5000F.* Circ. Water Pump "A" is in service.* Condenser Backpressure is 1" HgA.What would be the steam dump response to Main Steam Header Pressure transmitter AB PT-507 failing high? (Assume NO operator action) A. Group 1 would fully open.B. Group 1 would modulate closed to maintain RCS temperature at 5000F.C. Steam Dumps would not respond due to P-12 interlock.D. Groups 1 & 2 would full open.
A
Unit is shutdown in Mode 3 in preparation for a refueling outage. The following conditions existed just prior to AC PT-213 (LP Condenser Pressure Transmitter) failing high:* RCS pressure is 2235 psig.* All RCP's running.* Tavg being maintained at 5470F.Which one of the following temperatures should Tavg stabilize with NO operator action? A. 5470FB. 5510FC. 5620FD. 5570F
A
Following a reactor trip, a failure in Yellow Train SSPS causes Yellow Train P-12 steam dump solenoids to deenergize.What affect, if any, does this failure have on stabilizing RCS Tavg? A. Only the cooldown valves will operate, it will take longer to reach no-load Tavg.B. No steam dump valves will operate, S/G ARVs will control above no-load Tavg.C. The cooldown valves will not operate steam dump, valves will control at no-load Tavg.D. There is no impact, a single failure will not prevent steam dump valves from operating.
B
When transferring Steam Dumps from Tavg Mode to Steam Pressure Mode, the Reactor Operator failed to verify Steam Dump Demand Indication (AB-UI-500) and Steam Header Pressure Controller (AB-PK-507) were matched. When the Mode selector was shifted:* AB-PK-507 indicated 20%* AB-UI-500 indicated 5% What was Steam Dump System response when Steam Pressure Mode was selected? A. All Steam Dump Valves opened and modulated to 20% on the cooldown valves.B. All Steam Dump Valves opened and closed at 5500F.C. Group One Steam Dump Valves modulated closed.D. Group One Steam Dump Valves modulated open.
D
During a plant heat up RCS temperature is to be maintained automatically at 5000F using Condenser Steam Dumps.What Steam Pressure Controller (AB PK-507) setting is required? A. 4.44B. 5.12C. 4.12D. 3.85
A
The following plant conditions exist: Reactor Power 0% RCS Tavg 5570F Steam Dump Valves Steam Pressure Mode Steam Pressure Setpoint 1005 psigWhat is the status of the Steam Dump System? A. Armed, not dumping steam.B. Not armed, dumping steam.C. Not armed, not dumping steam.D. Armed, dumping steam.
D
At 100% power, S/G "A" Pressure Transmitter (AB PT-1) fails to 1155 psig causing S/G "A" ARV (AB PV-1) to open 50%.What action would NOT close AB PV-1? A. Placing controller AB PIC-1A in manual and close.B. Adjusting AB PV-1 setpoint to the high end of scale.C. Transferring control of AB PV-1 to the Auxiliary Shutdown Panel.D. Isolating the air/gas supply to AB PV-1.
C
The plant is MOL at 50% power. Steam Dump System is in normal lineup for this power. A 7.5% per minute ramp load decrease occurs for three minutes. (Assume no operator action.)Final plant conditions are: Reactor Power 27% RCS Tavg 566.20F T-ref 564.90FWhat is Steam Dump System status? A. Not armed, modulated open demand.B. Armed, tripped open.C. Not armed, not open.D. Armed, not open.
D
The following plant conditions exist: Reactor Power 80% RCS Tavg 583.70F T-ref 580.60F Steam Dumps T-avg ModeA 2% per minute decrease in turbine load occurs over three minutes.What is the response of the Steam Dump System? A. Armed, dumping steam.B. Not armed, not dumping steam.C. Not armed, dumping steam.D. Armed, not dumping steam.
B
A complete loss of condenser vacuum occurs, the following plant conditions exist prior to the Loss of Condenser vacuum:* Mode 3 Shutdown Banks Withdrawn* RCS T-ave Controlling at 5570F on Steam Dumps* RCS Pressure 2235 psig* RCPs All operatingAssuming no operator action, at what temperature would T-avg stabilize? A. 5610FB. 5570FC. 5640FD. 5500F
A
The plant is operating at 75% Rated Thermal Power, "BOL" with: RCS Boron 950 ppm Control Rods Manual Turbine Control On load limiterWhen a steam dump valve fails open with no operator action and assuming no reactor trip or safety injection.What parameter would have a value increase? A. Reactor PowerB. RCS TemperatureC. Steam PressureD. RCS Pressure
A
A circ water pump tripped with the plant at full power three minutes ago. The following plant conditions exist:* Auct High Tave 590?F and decreasing* Reactor Power 75% and stable* Turbine Load 880 MWe and stable* LP 'A' Cond Press 4.7" HgA* LP 'B' Cond Press 5.0" HgA* LP 'C' Cond Press 5.5" HgAWhat is the expected condenser steam dump automatic operation under these conditions? A. 12 dumps available and tripped openB. 12 dumps available and some modulated openC. <12 dumps available and dumps closedD. Fewer than 12 steam dumps are available and all available dumps are open.Fewer than 12 steam dumps are available and all available dumps are open.Fewer than 12 steam dumps are available and all available dumps are open.<12 dumps available and dumps open
D