• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/28

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

28 Cards in this Set

  • Front
  • Back

Wind general: types of coverage

Serial Loss, Offshore Logistics, Lack of Wind
Wind serial loss: Cover
Retrofits, Supplier's warranty failure, Availability guarantee (onshore only), Multi-year
Wind serial loss: Retrofits: Due to which cause
Faulty workmanship, fautly material, faulty design (also if done by supplier)
Wind serial loss: Example for suppliers of components
Gearboxes, rotor blades, mast components
Wind serial loss: Start / End of cover
Start: Beginning of production year, End: End of guarantee period (max 5 years)
Wind serial loss: Possible insureds
Component manufacturers, WPP manufacturers, Developers large offshore parks
Wind serial loss: Multi-year cover "special"
Policy cannot be cancelled post-loss
Wind serial loss: Allocation of serial loss
All to one financial year, hence annual deductible eroded once
Wind serial loss: Availability guarantee: For who
Onshore only
Wind serial loss: Availability guarantee: What is it
Guarantee that WTGs work and deliver if weather conditions are that way. If not (stopped for repairs or broken), then substantial indemnification payments
Wind serial loss: Offshore cover special
Logistics costs: Special ship, crew
Wind serial loss: Offshore cover exclusion
Adverse weather delays
Wind offshore logistics: Parameters leading to delay
Wind speed, current, wave height
Wind offshore logistics: Costs per day of delay jack-up barge
Up to € 100,000
Wind offshore logistics: Cover of offshore logistics
Additional costs for overrunning of project period (incl weather buffers) per day
Wind offshore logistics: Reasons covered for overtime
Discontinuation due to bad weather, missed weather windows due to incorrect forecasts,discontinuation ordered by captain, accidents on board an machinery breakdown
Wind offshore logistics: Discussion points for cover
Weather related trigger (loss event), project planning and time buffers (deductible) rates for ship and crew (indemnification)
Wind lack of wind: Variables influencing modelled turnover
Historic wind speet at hub level, turbine's performance curve for entire windfarm, stipulated price per MWh
Wind offshore logistics: WOW - meaning
Wait on weather
Wind offshore logistics: CTP - meaning
Call to port
Wind offshore logistics: Significant wave height definition
Half wave = deviation from average sea level
Wind offshore logistics: Limit
Approx. 95% of probability of max. project length
Wind offshore logistics: Availability guarantee
Guarantee that WTGs work and deliver. If not (stopped for repairs or broken), then substantial indemnification payments
Wind operations and maintenance: Period
Multi-year (up to 10 years)
Wind operations and maintenance: Cover
Repair of major components
Wind operations and maintenance: Prerequisite production
Due dilligence of WTG production
Wind operations and maintenance: Prerequisite cover period
Third party inspection
Wind operations and maintenance: AAD function

AAD adds up year to year, only decreased by claim