Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
50 Cards in this Set
- Front
- Back
Who is the primary sked 3.2 user and responsible for maintenance planning and accomplishments |
Wcs |
|
What instruction states that maintenance personnel must prove they are fully qualified to perform an mrc during a spot check |
4790.1e |
|
Advanced change notices in FbR's are retained in the 43p1 for how long |
Until revision documentation is received |
|
Deadline dates are required on which of the following types of 4790.2K forms |
Type 2 or type 3 only |
|
What accomplishment rating gives details of Mrc being completed within periodicity |
Par |
|
In sked 3.2 what administrative rating gives details acknowledging PMs alerts |
Aar |
|
What is sometimes referred to as the "level of effort" |
Maintenance level assignment |
|
Who is responsible to ensure that all equipment owned by the work center has the correct PMS coverage |
Wcs |
|
What maintenance tasks that is marked lost not applicable or system will have what added to the schedule |
Flip page |
|
Tfbr are approved and sent off the ship in how many days |
2 |
|
Line-outs that appear in red indicate what |
Not approved |
|
Which of the following is not required when new equipment is placed on board that is not covered by PMS |
Add equipment through soms requesting Parts support |
|
Line-outs that appear in blue indicate what |
Approved |
|
Department heads will ensure all Department 3M assistants, division officers, and work center supervisors are |
Qualified and designated in writing |
|
What NAVSEAINST provides guidance for 3M policies and procedures |
4790.8C |
|
Who reviews the 13-week report prior to starting and at the end of the week |
Wcs lcpo divo |
|
What instruction states that the maintenance person is responsible for all Hazmat PPE |
NSTM 670 |
|
Review activities of urgent feedback reports provide a preliminary response within how many days |
1 |
|
Each Tag out log shall contain |
Tgl mrc mip loep roc |
|
Split mips indicate which of the following |
A mip that includes MRC's from more than one work center to perform |
|
How many different types of revisions made the work center supervisor initiate in Sked 3.2 |
None |
|
How long can you maintenance person have Hazmat checked out |
24 hours |
|
Work center supervisors can schedule situational maintenance correctly by |
Work center supervisor creating a local trigger |
|
Urgent technical feedback reports are filed when |
Both A and B |
|
Who acts as the final review officer from maintenance shifts between departments |
Xo |
|
Who was responsible for ordering and maintaining the proper PPE describe on the MRC |
Work center supervisor |
|
Which symbol is used to Mark scheduled maintenance that you use the system tab for |
An x with a annotation on the flip page stating who performed the maintenence |
|
Who is responsible for approving the work center schedules after revision or administrative changes are made |
Department head |
|
If there is a difference between requirements of a PMs and other technical Publications exist which requirements will prevail |
Ships instructions and drawings |
|
What is the correct date format for all three and documents |
Ddmmmyyyy |
|
The list of effective pages is known as the |
PMS - 5 |
|
Which of the following is associated with Iem implementation |
Department head must approve IEM status |
|
Situational checks can be scheduled by the 3M office by |
All of the above |
|
Zidl sheets are maintained for the division space for how long |
1 year |
|
What does CSMP stand for |
Current ships maintenance project |
|
What must be done before the work center supervisor to authorize a PMS red tag |
Work center supervisor must obtain permission from the person or watch specified on the tgl |
|
What must the work center supervisor cement when there are discrepancies that are within the division's capability but cannot be corrected by the division within 60 days |
Originating work center ta4 JSN |
|
Who is overall responsible for the execution of the ships zone inspection program |
Commanding officer |
|
Scheduling aids on the mip are used for all except |
Preparation of a COSAL FBR for submission to TYCOM |
|
Which. Is it a code indicates safety of ships system |
Asterick sign |
|
Deferred maintenance action is required for all except |
Addition of new equipment or system |
|
What does the warning note on the MRC indicate |
Death or injury may result |
|
When reviewing the 13-week report the #R-1 of S-1 (#R-1) denotes what |
Dual periodicity |
|
When a danger tagged component is found out of position or a danger tag is found on the wrong component perform all of the following actions except |
Continue working since the isolations are obviously working |
|
What type of FBR deals with safety-related issues |
Urgent |
|
A deferred maintenance action is a maintenance requirement that |
Is required when Hazmat is not available on board the ship |
|
The only modifications with shipboard Personnel may make to the MRC are what |
Common tools |
|
What is required when there is a modification of any installed or in use equipment |
Configuration file correction |
|
What identifies the proper Hazmat required of an individual MRC |
Spmig |
|
What is entered in the csmp problem summary block of the work candidate block 37 of the 4790 / 2K |
Condensed description of the problem |