• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/50

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

50 Cards in this Set

  • Front
  • Back

Who is the primary sked 3.2 user and responsible for maintenance planning and accomplishments

Wcs

What instruction states that maintenance personnel must prove they are fully qualified to perform an mrc during a spot check

4790.1e

Advanced change notices in FbR's are retained in the 43p1 for how long

Until revision documentation is received

Deadline dates are required on which of the following types of 4790.2K forms

Type 2 or type 3 only

What accomplishment rating gives details of Mrc being completed within periodicity

Par

In sked 3.2 what administrative rating gives details acknowledging PMs alerts

Aar

What is sometimes referred to as the "level of effort"

Maintenance level assignment

Who is responsible to ensure that all equipment owned by the work center has the correct PMS coverage

Wcs

What maintenance tasks that is marked lost not applicable or system will have what added to the schedule

Flip page

Tfbr are approved and sent off the ship in how many days

2

Line-outs that appear in red indicate what

Not approved

Which of the following is not required when new equipment is placed on board that is not covered by PMS

Add equipment through soms requesting Parts support

Line-outs that appear in blue indicate what

Approved

Department heads will ensure all Department 3M assistants, division officers, and work center supervisors are

Qualified and designated in writing

What NAVSEAINST provides guidance for 3M policies and procedures

4790.8C

Who reviews the 13-week report prior to starting and at the end of the week

Wcs lcpo divo

What instruction states that the maintenance person is responsible for all Hazmat PPE

NSTM 670

Review activities of urgent feedback reports provide a preliminary response within how many days

1

Each Tag out log shall contain

Tgl mrc mip loep roc

Split mips indicate which of the following

A mip that includes MRC's from more than one work center to perform

How many different types of revisions made the work center supervisor initiate in Sked 3.2

None

How long can you maintenance person have Hazmat checked out

24 hours

Work center supervisors can schedule situational maintenance correctly by

Work center supervisor creating a local trigger

Urgent technical feedback reports are filed when

Both A and B

Who acts as the final review officer from maintenance shifts between departments

Xo

Who was responsible for ordering and maintaining the proper PPE describe on the MRC

Work center supervisor

Which symbol is used to Mark scheduled maintenance that you use the system tab for

An x with a annotation on the flip page stating who performed the maintenence

Who is responsible for approving the work center schedules after revision or administrative changes are made

Department head

If there is a difference between requirements of a PMs and other technical Publications exist which requirements will prevail

Ships instructions and drawings

What is the correct date format for all three and documents

Ddmmmyyyy

The list of effective pages is known as the

PMS - 5

Which of the following is associated with Iem implementation

Department head must approve IEM status

Situational checks can be scheduled by the 3M office by

All of the above

Zidl sheets are maintained for the division space for how long

1 year

What does CSMP stand for

Current ships maintenance project

What must be done before the work center supervisor to authorize a PMS red tag

Work center supervisor must obtain permission from the person or watch specified on the tgl

What must the work center supervisor cement when there are discrepancies that are within the division's capability but cannot be corrected by the division within 60 days

Originating work center ta4 JSN

Who is overall responsible for the execution of the ships zone inspection program

Commanding officer

Scheduling aids on the mip are used for all except

Preparation of a COSAL FBR for submission to TYCOM

Which. Is it a code indicates safety of ships system

Asterick sign

Deferred maintenance action is required for all except

Addition of new equipment or system

What does the warning note on the MRC indicate

Death or injury may result

When reviewing the 13-week report the #R-1 of S-1 (#R-1) denotes what

Dual periodicity

When a danger tagged component is found out of position or a danger tag is found on the wrong component perform all of the following actions except

Continue working since the isolations are obviously working

What type of FBR deals with safety-related issues

Urgent

A deferred maintenance action is a maintenance requirement that

Is required when Hazmat is not available on board the ship

The only modifications with shipboard Personnel may make to the MRC are what

Common tools

What is required when there is a modification of any installed or in use equipment

Configuration file correction

What identifies the proper Hazmat required of an individual MRC

Spmig

What is entered in the csmp problem summary block of the work candidate block 37 of the 4790 / 2K

Condensed description of the problem