• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/17

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

17 Cards in this Set

  • Front
  • Back
What documents will the SCA request from the applicant upon certification? 2-2
1. Initial Scope of Certification (SOC)
2. Milestone Event Schedule (MES)
3. Initial Presurvey Outline Boklet (PSOB)
4. Certification Scope Notebook, if required
5. Mission configuration Matrix, if required
Who finalizes the SOC boundries and approves it?
2-2.1
The SOC boundries shall be finalized by the applicant and approved or modified by the SCA when the system design is complete.
What is included in the certification milestone event schedule? 2-2.2
A list of sequential events in the certification process with estimated dates of completion.
documentation submissions, technical reviews, and deficiency corrections shall be considered in the MES to ensure timely completion of the certification process prior to the desired use date of the system.
When may the initial MES be submitted to the SCA?
2-2.2
Initial MES may be submitted at the same time of shortly after the the initial SOC is submitted.
Upon approval of the negotiated initial SOC by the SCA, a _____________ shall be prepared by the applicant? 2-2.3
Pre-survey Outline Booklet (PSOB)
What does the SCA need to conduct an onsite survey?
2-2.3
1. Pre-survey Outline Booklet (PSOB)
2. System Certification requirements/guidelines Checklist (SCA Survey Checklist)
What happens to the SCA survey Checklist upon completion of a survey? 2-2.3
It becomes an official part of the SCA's proprofile, providing evidence that the certification requirements were met during the survey.
What must be prepared by the applicant each time the system comes due for recertification or continuation of certification? 2-2.4
A new Pre-survey Outline Booklet (PSOB)
What items are included in the PSOB for standard SSD and R/C systems? 2-2.4
1. Equipment ID
2. Operating Parameters
3. air supply system
4. Mixed gas/O2 supply system
5. Electrical systems
6. Diver Handling systems
7. Validation of as-built systems drawings
8. Inspection, test and REC records
9. OP's and EP's
10. PMS
11. Operational Demonstration
What are 2 items produced be the applicant but are generally not mandatory for the certification process?
2-2.5
1. The Certification Scope Notebook
2. Mission Configuration Matrix
Who's responsibility is it to ensure detailed reviews of the system design are conducted and formally documented? 2-5
The diving system Acquisition Manager
A request for a on-site survey should reach the SCA at least ____ days prior to the desired date of the survey? 2-6
90 days
What is the purpose of the onsite survey? 2-6
To verify that the "As-built" system has been fabricated IAW the approved documentation.
Corrective action shall be completed prior to manned use? 2-7
Category 1A
Corrective action must be accomplished prior to system certification? 2-7
Category 1B
Corrective action must be accomplished prior to the date or event specified on the card to sustain certification?
Category 1C
Corrective action must be accomplished on a specified component
asdfa