Disposal of sewage, or other liquid wastes, shall be by means of ____________.
|
the drainabe system of the building or premises
|
|
TRUE/FALSE A drinking fountain installed outside shall be connected to an approved drainage system.
|
TRUE
|
|
A connection to the public sewer, or private sewage disposal system, is required for ________________.
|
buildings with plumbing fixtures
|
|
Burred ends of all pipe and tubing shall be ______________________.
|
reamed to the full bore of the pipe or tube
|
|
No plumbing system, drainage system, building sewer, private sewage disposal system, or parts thereof, shall be located in
|
any lot other than the lot that is the site of the building served by such facilities
|
|
Piping, fixtures, or equipment that are installed so that they interfere with normal operation and use of windows or doors shall be __________________.
|
relocated to avoid interference
|
|
All design, construction, and workmanship shall be in conformity with __________________.
|
accepted engineering practices
|
|
When supporting horizontal piping 5" in diameter with hangers, a ______________ inch diameter rod shall be used.
|
1/2
|
|
The building drain from the front building may be extended to the rear building when both buildings are located
|
on an interior lot
|
|
All trenches deeper than the footing of any building or structure and paralleling the same shall be at least ________________________.
|
45° therefrom
|
|
Cast-iron soil pipe, installed vertically, shall be supported at its base and ________________.
|
each floor not to exceed 15'
|
|
Threaded pipe (I.P.S.) 3/4", except for gas piping, installed horizontally shall be supported at approximately ___________________.
|
10-foot intervals
|
|
Piping in the ground shall be laid on ________________.
|
a firm bed
|
|
TRUE/FALSE PEX piping may be coupled together with shielded couplings.
|
false
|
|
The type of acceptable joints for PEX shall be __________________.
|
metal insert or metal compression
|
|
Copper tubing installed vertically shall be supported at each story or at maximum intervals of ______________________.
|
10 feet
|
|
Mechankical devices may be used to complete backfilling where covering above any piping is at least _______________ inches.
|
12
|
|
Two-inch horizontal copper tubing drain pipe shall be supported at ______________.
|
10-foot intervals
|
|
Horizontal hubless pipe shall be braced at not more than 40-foot intervals to prevent ________________.
|
horizontal movement
|
|
All piping, fixtures, and equipment shall be adequately supported in accordance with the ___________________.
|
code
|
|
Voids around piping passing through concrete floors on the ground shall be ____________________.
|
protected
|
|
All materials, fixtures, or devices used or entering into the construction of plumbing and drainage systems shall ________________.
|
conform to approved applicable standards
|
|
The provisions of the code allow an alternate material or method of construction provided it is ____________________.
|
approved by the Authority Having Jurisdiction as an alternate
|
|
I.P.S. is the abreviation for __________________.
|
iron pipe size
|
|
TRUE/FALSE Section 312.2 prohibits the direct embedment of hubless cast-iron pipe in a concrete slab.
|
TRUE
|
|
Tub waste openings in framed donstruction shall be protected by _________________________.
|
metal collars or screens
|
|
TRUE/FALSE It is permitted to drill and tap a vent pipe to connect an indirect waste pipe.
|
FALSE
|
|
All pipe, pipe fittings, traps, fixtures, materials, and devices used in plumbing systems shall be ______________________.
|
approved, listed, and free from defects
|
|
Sleeves shall be provided to protect all piping through _________________ and _________________________walls.
|
concrete, masonry
|
|
Hubless cast-iron piping shall be supported every other joint, unless over ________________ feet in length, then it shall be provided with support at every joint.
|
4
|
|
When installing ______________________, the Authority Having Jurisdiction shall require evidence of the competency of the installers.
|
medical gas piping
|
|
Drain pipes subject to condensation over food storage in food-handling establishments shall be ________________.
|
thermally insulated
|
|
The section of the UPC that grants the Authority Having Jurisdiction the opportunity to require tests as proof of equivalency.
|
301.2.1
|
|
Test gauges shall not have a pressure range more than ____________.
|
twice the test pressure applied
|
|
If an AHJ permits an "alternative engineered design," __________________.
|
the approval shall have no effect beyond that AHJ boundary
|
|
Plumbing systems shall be located above the designed flood elevation _________________.
|
except when designed to prevent water from entering or accumulating within components
|