4 Cards in this Set

  • Front
  • Back
* The CM could either be: a member of the staff of the
Owner, an independent individual, or a firm hired by t
Owner to manage the Construction of the Project
with regards to Quality, Workmanship and Cost.
1.5 - 3 % of
Project
Construction
Cost
SERVICES:
1. Coordination and Supervision
2. Cost and Time Control
3. Quality Control of Work
4. Keeping of Records
CONDITIONS:
null
CONDITIONS:
A. The CM may hire the CSG under his employ or may
supervise the CSG hired directly by the Owner.
B. The CM shall not involve himself directly with the
work of the Contractor.
C. The CM shall not impose methods, systems or
designs that will substantially affect the Contruction
schedule and impair the design concept of the
Architect.
D. The CM is directly responsible to the Owner on all
aspects of the Construction work: Programming,
Coordination, quality & cost control and time
management.
E. No Liability in case equipment fail to function or if a
portion of the building collapses due to:
a. deficiencies in plan / design PROVIDED the CM did n
participate in the plan / design review.
b. deficiencies in the manner of Construction
PROVIDED the CM faithfully discharged his functions
during the Construction / Project Implementation.
null
QUALIFICATIONS:
a. RLA with Managerial capabilities & extensive
experience in the field of Construction.
b. RLA who are Contractors or who have already been
in responsible charge of Construction.