• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/34

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

34 Cards in this Set

  • Front
  • Back
When presented with a basement fire what should be palced at the entry to the structure during operations?
Jacl Ladder
Approximately what percentage of roof systems built in the U.S. are of truss construction?
60%
Approximately what percentage of one and two family homes built in the U.S. are of light weight construction?
80%
With the Canberra MCB2 ABG Meter what should you suspect with a background reading of 10X?
Radiological incident
With the Canberra MCB2 ABG Meter when should you suspect contamination of personnel?
When you get a reading of 3 or 4 times background on personnel
When arriving at a building with a water based fire protection system where should the first engine be positioned and what should be their initial actions?
They should position within 50' of the FDC and immediately connect a minimum of two 3" double jacketed high pressure supply lines.
What is the recommended initial sprinkler system pump pressure?
150 psi + 5 psi/per floor elevation pressure
When responding to a sprinklered structure what does no visible smoke or fire potentially indicate?
The fire is very small and one or two sprinklers have extinguished fire or sprinklers have not yet operated.
When responding to a sprinklered structure what does an outside water flow alarm motor gong operating potentially indicate?
That water is flowing into the system
When responding to a sprinklered structure what does visible steam potentially indicate?
Sprinklers have operated and probably have the fire under control or contained.
When responding to a sprinklered structure what does visible heavy fire and/or smoke potentially indicate?
Sprinkler system is not operational and/or the supply valve is closed.
Should fire personnel attempt to reset a dry sprinkler system once it has operated?
No
What paperwork is required by the IC after a sprinkler system activation?
Sprinkler Report
What items are required to be maintained on-site in a structure with a sprinkler system per NFPA 13.
At least 6 spare sprinkler heads and a special wrench
When is it generally quicker to use a buildings standpipe system rather than lay out hoseline?
When the fire is located more than four floors above the lowest access leveland/or where the building size and complexity will require attack lines in excess of 400 ft.
What is the minimum amount of hose that should be carried in the standpipe kit?
150 ft of 2" line
What should be your initial standpipe pumping pressure?
150 psi, add 50 psi /10 floors
In a high-rise operation what hose and tip does the CFD use?
2" attack line with a 1" smooth bore tip.
The pressure on the piezometer hooked up to the outlet on the floor below the fire with water flowing should read what?
90 psi for a 150 ft layout. For a 100 ft layout the piezometer should read 78 psi.
What is the restricted distance from the hoseline if 250 psi pump pressures must be used?
50 ft to each side.
What is the minimum height a building must be to be considered a high rise by the CFD?
75 ft.
What should be included in the size up report for a high rise structure?
CERTAIN
(C) Confirm working fire/smoke showing
(E) Establish/Identify location of command post
(R) Report type of occupancy
(T) Trapped occupants
(A) Approximate number of floors/height
(I) Identify fire floor
(N) Name of building
In a high rise structure what must be done prior to initiating horizontal ventilation?
Obtain the approval of the incident commander
What is deemed the fire area in a high rise structure?
The fire floor and two floors above
Where should occupants of the fire area be relocated to?
To an area of refuge at least three floors below the fire floor
What is the recommendation of how many floors in a high rise structure can be evacuated at the same time?
Three floors
To evacuate non-ambulatory residents what control scheme should be used for the elevators in high rise structures?
Phase II operations
What is the maximum number of department members allowed in a passenger elevator at one time?
Six
What floor should the fire be above to allow use of the elevators in a high rise fire?
5th floor
If using an elevator to get to the fire scene in a high rise structure on which floor should you stop?
At least two floors below the lowest floor reporting smoke.
Can elevators be used in below grade fires?
No
How much of a floors air volume can the plenum space above the ceiling contain?
As much as 25%
Who conducts the primary search of the top five floors and evacuation stairwell in a high rise structure?
4th arriving ladder company
What equipment must all memebrs take into a high rise building?
1. PPE/SCBA
2. Walkie Talkie
3. Flashlight
4. Extra SCBA bottle