52 Cards in this Set
- Front
- Back
Depending on the selected modular configuration, the BEAR water system can suppl 30 gallons of water per person per day for a _____ camp
|
1100
|
|
What color is the stripe on the BEAR waste water system piping
|
purple
|
|
what type of pump is used to pump raw water to the 20,000 gallon water storage bladders ?
|
400 gpm diesel pump
|
|
What maintains a preset volume of water in the 3000 gallon collapsible fabric tank
|
Bladder water level controller
|
|
What is the primary potable water distribution subsystem of the BeAR water system ?
|
550 initial
|
|
What is used to provide protection to potable water distribution hoses in the event they have to cross roadways ?
|
hose rollover / pump ramp
|
|
Six inch hoses used in the BEAR system are stored where ?
|
flaking box
|
|
how many gallons of water can the BEAR water system supply per person per day for an 1100 person camp ?
|
30
|
|
What hose color is used for potable water
|
white
|
|
How many distinct subsystem does the BEAR system contain ?
|
5
|
|
What size collapsible fabric tanks does the BEAR system employ ?
|
3000 and 20,000
|
|
What subsystem is used to provide potable water to isolated user faciliities ?
|
industrial operations
|
|
20,000 gallon raw water bladders are filled using what pump
|
400 gpm self prime
|
|
What lift station is used for predigestion of raw sewage and pumping of waste water to waste water collection
|
dual
|
|
What component of the dual pump station controls the length of cycling of the pump by maintaining pressure against the system through a factory preset pressurized air bladder ?
|
accumulator
|
|
What process in the 25,000 gallon waste water collection tank keeps raw sewage fresh and in a liquid state until final disposal ?
|
Tank mixing system
|
|
If the lift station water level is too high or the pump will not shut off, check the operation of the ____?
|
floats
|
|
If you need to pull a pump from the lift station what is the first thing you need to do ?
|
ensure no power in pump
|
|
At what pressure does your dual pumping station pressurize your potable water distribution line at ?
|
20-40 psi
|
|
How many product tanks come with the ROWPU ?
|
2
|
|
Which pump forces water through the cartridge filter of the ROWPU ?
|
Booster Pump
|
|
The component of the ROWPU that is the second stage filtration and removes suspended solids is the ?
|
Cartridge Filter
|
|
Two types of solids the ROWPU filters out are what ?
|
Suspended and dissolved
|
|
How far downstream do you locate your waste hose ?
|
25 yards / 75 feet
|
|
When operating the ROWPU , what needs to be reset in order to activate the RO pump ?
|
low pressure
|
|
What is maximum distance the ROWPU can be from a water source ?
|
25 yds / 75 feet from source
|
|
Where is the chlorine injected into the ROWPU ?
|
After R.O elements
|
|
____ percent of all organic materials in the water can be removed by a reverse osmosis unit .
|
99%
|
|
The high pressure relief valve shuts down the ROWPU when the pressure goes above
|
1100 psi
|
|
How many cartridge filters are utilized in the ROWPU ?
|
8
|
|
How far downstream do you locate your vent vessel hose ?
|
25yds /75ft downstream
|
|
What valve is turned to create pressure inside the R.O vessels ?
|
Reg water product flow valve
|
|
During the operation of the ROWPU polymer will be added to coagulate ?
|
Multi media Filter
|
|
After the chemical feed pumps have been primed what standard do you calibrate them to ?
|
60 milli /60sec
|
|
Three tests that are taken after the ROWPU is in full operation are TDS, Chlorine, and ____ ?
|
pH
|
|
How much water is needed to perform a turbidity test when checking for clarity ?
|
600 mL
|
|
While running the ROWPU which action allows filtered water to enter the R.O vessels ?
|
Vent vessel gate valve closes
|
|
What is the first chemical injected into the ROWPU ?
|
polymer
|
|
Before testing the product water for total dissolved solids, the cell of the TDS meter must be rinsed _____ times.
|
3
|
|
What chemical is miced to neutralize contaminants before the product water leaves the ROWPU ?
|
calcium hypochlorite
|
|
After the ROWPU is in full operation and making potable water , what tests need to be performed ?
|
TDS Chlorine pH
|
|
What standard do you calibrate your chemical feed pumps after they have been primed ?
|
60/60
|
|
During the R.O element cleaning process how many inches of water is left in the brine tank for circulation through the ROWPU ?
|
7 inch
|
|
During an NBC condition chlorine stays in which position for the entire process ?
|
Prime
|
|
The cartridge filter contains ____ filter tube elements ?
|
8
|
|
When the total dissolved solids of the product water exceeds ______ ppm the R.O elements must be replaced ?
|
1000
|
|
Feed citric acid after ____ hours of ROWPU operation.
|
20
|
|
When thee cartridge filter guage differential pressure rises above _____ psi the catridge filter rube elements must be changed.
|
20 psi
|
|
During the backwash cycle of the ROWPU how long does the solid state timer run for ?
|
13 minutes
|
|
When installing RO elements into the vessels how should they be installed ?
|
Direction of flow
|
|
After _____ hours of operation the multimedia filter requires backwashing.
|
20 hours
|
|
When feeding citric acid into the ROWPU you are trying to get the pH below _____.
|
8 psi
|