• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/52

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

52 Cards in this Set

  • Front
  • Back
Depending on the selected modular configuration, the BEAR water system can suppl 30 gallons of water per person per day for a _____ camp
1100
What color is the stripe on the BEAR waste water system piping
purple
what type of pump is used to pump raw water to the 20,000 gallon water storage bladders ?
400 gpm diesel pump
What maintains a preset volume of water in the 3000 gallon collapsible fabric tank
Bladder water level controller
What is the primary potable water distribution subsystem of the BeAR water system ?
550 initial
What is used to provide protection to potable water distribution hoses in the event they have to cross roadways ?
hose rollover / pump ramp
Six inch hoses used in the BEAR system are stored where ?
flaking box
how many gallons of water can the BEAR water system supply per person per day for an 1100 person camp ?
30
What hose color is used for potable water
white
How many distinct subsystem does the BEAR system contain ?
5
What size collapsible fabric tanks does the BEAR system employ ?
3000 and 20,000
What subsystem is used to provide potable water to isolated user faciliities ?
industrial operations
20,000 gallon raw water bladders are filled using what pump
400 gpm self prime
What lift station is used for predigestion of raw sewage and pumping of waste water to waste water collection
dual
What component of the dual pump station controls the length of cycling of the pump by maintaining pressure against the system through a factory preset pressurized air bladder ?
accumulator
What process in the 25,000 gallon waste water collection tank keeps raw sewage fresh and in a liquid state until final disposal ?
Tank mixing system
If the lift station water level is too high or the pump will not shut off, check the operation of the ____?
floats
If you need to pull a pump from the lift station what is the first thing you need to do ?
ensure no power in pump
At what pressure does your dual pumping station pressurize your potable water distribution line at ?
20-40 psi
How many product tanks come with the ROWPU ?
2
Which pump forces water through the cartridge filter of the ROWPU ?
Booster Pump
The component of the ROWPU that is the second stage filtration and removes suspended solids is the ?
Cartridge Filter
Two types of solids the ROWPU filters out are what ?
Suspended and dissolved
How far downstream do you locate your waste hose ?
25 yards / 75 feet
When operating the ROWPU , what needs to be reset in order to activate the RO pump ?
low pressure
What is maximum distance the ROWPU can be from a water source ?
25 yds / 75 feet from source
Where is the chlorine injected into the ROWPU ?
After R.O elements
____ percent of all organic materials in the water can be removed by a reverse osmosis unit .
99%
The high pressure relief valve shuts down the ROWPU when the pressure goes above
1100 psi
How many cartridge filters are utilized in the ROWPU ?
8
How far downstream do you locate your vent vessel hose ?
25yds /75ft downstream
What valve is turned to create pressure inside the R.O vessels ?
Reg water product flow valve
During the operation of the ROWPU polymer will be added to coagulate ?
Multi media Filter
After the chemical feed pumps have been primed what standard do you calibrate them to ?
60 milli /60sec
Three tests that are taken after the ROWPU is in full operation are TDS, Chlorine, and ____ ?
pH
How much water is needed to perform a turbidity test when checking for clarity ?
600 mL
While running the ROWPU which action allows filtered water to enter the R.O vessels ?
Vent vessel gate valve closes
What is the first chemical injected into the ROWPU ?
polymer
Before testing the product water for total dissolved solids, the cell of the TDS meter must be rinsed _____ times.
3
What chemical is miced to neutralize contaminants before the product water leaves the ROWPU ?
calcium hypochlorite
After the ROWPU is in full operation and making potable water , what tests need to be performed ?
TDS Chlorine pH
What standard do you calibrate your chemical feed pumps after they have been primed ?
60/60
During the R.O element cleaning process how many inches of water is left in the brine tank for circulation through the ROWPU ?
7 inch
During an NBC condition chlorine stays in which position for the entire process ?
Prime
The cartridge filter contains ____ filter tube elements ?
8
When the total dissolved solids of the product water exceeds ______ ppm the R.O elements must be replaced ?
1000
Feed citric acid after ____ hours of ROWPU operation.
20
When thee cartridge filter guage differential pressure rises above _____ psi the catridge filter rube elements must be changed.
20 psi
During the backwash cycle of the ROWPU how long does the solid state timer run for ?
13 minutes
When installing RO elements into the vessels how should they be installed ?
Direction of flow
After _____ hours of operation the multimedia filter requires backwashing.
20 hours
When feeding citric acid into the ROWPU you are trying to get the pH below _____.