• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/10

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

10 Cards in this Set

  • Front
  • Back
Which document does the system create after you post an invoice?



Choose the correct answer.




A) Accounting document


B) Controlling document


C) Material document

A) Accounting document
Which of the following tasks are performed in the produce material step?



Choose the correct answers.




A) Stage material.


B) Convert planned order to production order.


C) Enter goods receipt.


D) Release production order.

A) Stage material.

C) Enter goods receipt.


D) Release production order

All manufacturing organizational elements exist within a __________.



Choose the correct answer.




A) Client


B) Storage location


C) Plant

A) Client
The Lot Size field in the material master record controls the quantity to be produced. Determine whether this statement is true or false
True
In the bill of material header, which field determines to which amount of the finished product the item categories refer?



Choose the correct answer.




A) Usage


B) Base quantity


C) Item category

B) Base quantity
Which of the following activity is performed in a routing?



Choose the correct answer.




A) Component assignment


B) Capacity category definition


C) Material withdrawal

A) Component assignment

What data is maintained in a work center?




Choose the correct answers.




A) Capacity formulas


B) Material components


C) People assignments


D) Labor rates

A) Capacity formulas

C) People assignments

Which of the following master data is assigned to a work center?




Choose the correct answer




A) Material master


B) Cost center


C) Bill of material

B) Cost center
Which of the following statements correctly describe the relationships between the master data used in the plan-to-produce business process?



Choose the correct answers




A) Bill of material components are assigned to a routing operation.


B) A work center is assigned to a routing operation.


C) A material master is assigned to a work center.


D) A bill of material is assigned to a work center

A) Bill of material components are assigned to a routing operation.

B) A work center is assigned to a routing operation.

What is the purpose of an activity type?



Choose the correct answer.




A) To collect the costs incurred by the cost center


B) To allocate the costs of work performed by the cost center


C) To schedule operations assigned to the work center


D) To settle a production order

B) To allocate the costs of work performed by the cost center