Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
37 Cards in this Set
- Front
- Back
Explain the importance of the COSAL in relationship to the ship’s mission and sustainability.
|
Coordinated Shipboard Allowance List. List of equipment onhand that may be needed.
|
|
Validating
|
Every 2-3 years download everything & validating during ILO. Reconciliation what is supported and what is not.
|
|
Updating
|
Modifications, additions, and deletions.
|
|
Automated Shore Interface/Revised Alternative Dataflow (ASI/RAD)-
|
Receive monthly from NAVSEA in a sequenced numbered tape. Provides updates, configurations, and a report update. Tells what is missing at the end of each month.
|
|
Explain how frequently ordered parts effect demand processing.
|
Verified 2x monthly. Demand is recorded. If an item is listed 2 times in a 6 month period, it becomes a higher priority item and is stocked onboard.
|
|
Material Obligation Validation (MOV) program.
|
SNAP NAVCOM 2155. Reconciliation of the RPPO and the SUADAPS stores. Contains Julian date, serial #, nomenclature, and running balance.
|
|
Depot Level Repairable (DLRs) program.
|
Manages high value items (advice # 7H, 7E, 7X, 7G, AND 7Q). Cannot repair and reuse.
|
|
procedures on NRFI DLRs in regard to the following situations
|
a. Turn-in- For exchange basis only. Advice code is 5g.
b. Remain in Place (RIP)- Turned into Supply when new item is in place. (Advice code 5S) DLR items reflect 2 prices, 1 is Standard Price and 1 is Net Unit Price. |
|
a. Maintenance Assist Modules (MAMs)-
|
Usually DLR’s. Used for troubleshooting only. If for permanent use must be approved by CO.
|
|
Bulkhead ready spares
|
Bulky items that are stored in the actual spaces that they will be used.
|
|
Discuss the Battle Group Asset Management System (BAMS) concept
|
Database to assist force commanders by providing TOTAL ASSETS of Battle group.
|
|
difference between the two components of the OPTAR
|
a. Equipment Maintenance Related Material (EMRM)-Parts and parts repair consumables required for maintenance of equipment. Y series for repair parts.
b. b. Other- Administrative and housekeeping items. |
|
effects of the following on ships OPTAR
|
a. Departmental budget- Basis for annual financial management plan. Distribution of money.
b. Consolidated Residual Asset Management System Inventory (CRAMSI)- Database managed by NAVSEALOGCEN. c. Hazardous material reutilization- The process of reusing hazmat. d. Defense Reutilization Marketing Office (DRMO) - Free issue for government use. |
|
State how credit is distributed for parts when they are turned back in to supply.
|
Item goes back to stock. Turned in to DRMO. Credit is given to TYCOM who has a large pool of money that is distributed accordingly at the end of the fiscal year.
|
|
UMMIPS and the role it plays with the Priority Designator (PD).
|
For priority 2 and 5 items. Not to exceed 70% priority items for each month.
|
|
Fleet freight/cargo-
|
Dates and ports & material info for items to be sent.
|
|
Main
|
Generated by the fleet commander. Includes dates & places of port visit. Asks where you want your supplies to go.
|
|
Discuss the purpose of ship’s store afloat.
|
Provide comfort for the crew. Generates funds for MWR. Sells items at lowest possible price.
|
|
Explain endurance loading of subsistence and how it affects the ship’s mission and sustainability.
|
Determined by TYCOM. Normally for 45 days. Allows for continues operation of the ship.
|
|
Define and describe the BDFA and state how it effects each crewmember.
|
$5.91 per person per day. Excess is turned back into meals for the crew.
|
|
Describe the principle quarterly foodservice report and where it is submitted.
|
Monthly report (Form 1357). Contains number fed, cost, and breakdown of costs.
Quarterly report (Form 1358). Compilation of 3 1357’s. Efficiency is determined by Navy Food Service System Office (NFSSO). |
|
105.18 State what kind of rations is utilized during battle stations when the galley or galley personnel are not available.
|
Marines will eat MRE's, (Meals Ready to Eat). When the ship is in battle quarters, the mess decks will deliver “battle messing” to the GQ stations.
|
|
Validating-
|
Every 2-3 years download everything & validating during ILO. Reconciliation what is supported and what is not.
|
|
Updating-
|
Modifications, additions, and deletions.
|
|
Automated Shore Interface/Revised Alternative Dataflow (ASI/RAD)-
|
Receive monthly from NAVSEA in a sequenced numbered tape. Provides updates, configurations, and a report update. Tells what is missing at the end of each month.
|
|
Turn-in-
|
For exchange basis only. Advice code is 5g.
|
|
Remain in Place (RIP)-
|
Turned into Supply when new item is in place. (Advice code 5S) DLR items reflect 2 prices, 1 is Standard Price and 1 is Net Unit Price.
|
|
a.Maintenance Assist Modules (MAMs)-
|
Usually DLR’s. Used for troubleshooting only. If for permanent use must be approved by CO.
|
|
Bulkhead ready spares
|
Bulky items that are stored in the actual spaces that they will be used.
|
|
a.Equipment Maintenance Related Material (EMRM)-
|
Parts and parts repair consumables required for maintenance of equipment. Y series for repair parts.
|
|
Other
|
Administrative and housekeeping items.
|
|
Departmental budget
|
Basis for annual financial management plan. Distribution of money.
|
|
Consolidated Residual Asset Management System Inventory (CRAMSI)-
|
Database managed by NAVSEALOGCEN.
|
|
Hazardous material reutilization-
|
The process of reusing hazmat.
|
|
Defense Reutilization Marketing Office (DRMO)
|
Free issue for government use.
|
|
Fleet freight/cargo-
|
Dates and ports & material info for items to be sent.
|
|
Main-
|
Generated by the fleet commander. Includes dates & places of port visit. Asks where you want your supplies to go.
|