• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/37

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

37 Cards in this Set

  • Front
  • Back
Explain the importance of the COSAL in relationship to the ship’s mission and sustainability.
Coordinated Shipboard Allowance List. List of equipment onhand that may be needed.
Validating
Every 2-3 years download everything & validating during ILO. Reconciliation what is supported and what is not.
Updating
Modifications, additions, and deletions.
Automated Shore Interface/Revised Alternative Dataflow (ASI/RAD)-
Receive monthly from NAVSEA in a sequenced numbered tape. Provides updates, configurations, and a report update. Tells what is missing at the end of each month.
Explain how frequently ordered parts effect demand processing.
Verified 2x monthly. Demand is recorded. If an item is listed 2 times in a 6 month period, it becomes a higher priority item and is stocked onboard.
Material Obligation Validation (MOV) program.
SNAP NAVCOM 2155. Reconciliation of the RPPO and the SUADAPS stores. Contains Julian date, serial #, nomenclature, and running balance.
Depot Level Repairable (DLRs) program.
Manages high value items (advice # 7H, 7E, 7X, 7G, AND 7Q). Cannot repair and reuse.
procedures on NRFI DLRs in regard to the following situations
a. Turn-in- For exchange basis only. Advice code is 5g.
b. Remain in Place (RIP)-
Turned into Supply when new item is in place. (Advice code 5S) DLR items reflect 2 prices, 1 is Standard Price and 1 is Net Unit Price.
a. Maintenance Assist Modules (MAMs)-
Usually DLR’s. Used for troubleshooting only. If for permanent use must be approved by CO.
Bulkhead ready spares
Bulky items that are stored in the actual spaces that they will be used.
Discuss the Battle Group Asset Management System (BAMS) concept
Database to assist force commanders by providing TOTAL ASSETS of Battle group.
difference between the two components of the OPTAR
a. Equipment Maintenance Related Material (EMRM)-Parts and parts repair consumables required for maintenance of equipment. Y series for repair parts.

b. b. Other- Administrative and housekeeping items.
effects of the following on ships OPTAR
a. Departmental budget- Basis for annual financial management plan. Distribution of money.
b. Consolidated Residual Asset Management System Inventory (CRAMSI)-
Database managed by NAVSEALOGCEN.
c. Hazardous material reutilization- The process of reusing hazmat.
d. Defense Reutilization Marketing Office (DRMO) - Free issue for government use.
State how credit is distributed for parts when they are turned back in to supply.
Item goes back to stock. Turned in to DRMO. Credit is given to TYCOM who has a large pool of money that is distributed accordingly at the end of the fiscal year.
UMMIPS and the role it plays with the Priority Designator (PD).
For priority 2 and 5 items. Not to exceed 70% priority items for each month.
Fleet freight/cargo-
Dates and ports & material info for items to be sent.
Main
Generated by the fleet commander. Includes dates & places of port visit. Asks where you want your supplies to go.
Discuss the purpose of ship’s store afloat.
Provide comfort for the crew. Generates funds for MWR. Sells items at lowest possible price.
Explain endurance loading of subsistence and how it affects the ship’s mission and sustainability.
Determined by TYCOM. Normally for 45 days. Allows for continues operation of the ship.
Define and describe the BDFA and state how it effects each crewmember.
$5.91 per person per day. Excess is turned back into meals for the crew.
Describe the principle quarterly foodservice report and where it is submitted.
Monthly report (Form 1357). Contains number fed, cost, and breakdown of costs.
Quarterly report (Form 1358). Compilation of 3 1357’s. Efficiency is determined by Navy Food Service System Office (NFSSO).
105.18 State what kind of rations is utilized during battle stations when the galley or galley personnel are not available.
Marines will eat MRE's, (Meals Ready to Eat). When the ship is in battle quarters, the mess decks will deliver “battle messing” to the GQ stations.
Validating-
Every 2-3 years download everything & validating during ILO. Reconciliation what is supported and what is not.
Updating-
Modifications, additions, and deletions.
Automated Shore Interface/Revised Alternative Dataflow (ASI/RAD)-
Receive monthly from NAVSEA in a sequenced numbered tape. Provides updates, configurations, and a report update. Tells what is missing at the end of each month.
Turn-in-
For exchange basis only. Advice code is 5g.
Remain in Place (RIP)-
Turned into Supply when new item is in place. (Advice code 5S) DLR items reflect 2 prices, 1 is Standard Price and 1 is Net Unit Price.
a.Maintenance Assist Modules (MAMs)-
Usually DLR’s. Used for troubleshooting only. If for permanent use must be approved by CO.
Bulkhead ready spares
Bulky items that are stored in the actual spaces that they will be used.
a.Equipment Maintenance Related Material (EMRM)-
Parts and parts repair consumables required for maintenance of equipment. Y series for repair parts.
Other
Administrative and housekeeping items.
Departmental budget
Basis for annual financial management plan. Distribution of money.
Consolidated Residual Asset Management System Inventory (CRAMSI)-
Database managed by NAVSEALOGCEN.
Hazardous material reutilization-
The process of reusing hazmat.
Defense Reutilization Marketing Office (DRMO)
Free issue for government use.
Fleet freight/cargo-
Dates and ports & material info for items to be sent.
Main-
Generated by the fleet commander. Includes dates & places of port visit. Asks where you want your supplies to go.