Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
68 Cards in this Set
- Front
- Back
What does SRS stand for |
Supply Response Section |
|
What does RCU stand for |
Requisition Control Unit |
|
What does TRU stand for |
Technical Research Unit |
|
What does MDU stand for |
Material Delivery Unit |
|
What does PMU stand for |
Program Management Unit |
|
What type of fund is OFC-01 |
Flight Operations |
|
What is the responsibility of Material Control |
To provide material support to their organization and coordinate indirect material requirements to ensure the material ordered is the material required and delivered to the work centers |
|
What does CCS stand for |
Component Control Section |
|
What does DCU stand for |
Document Control Unit |
|
What does SSU stand for |
Supply Screening Unit |
|
What does AWP stand for |
Awaiting Parts |
|
What does LRCA stand for |
Local Repair Cycle Assets |
|
How many units make up CCS |
Four |
|
What are the four units that make up CCS |
DCU, LRCA, SSU, AWP |
|
Name the four items procured with OFC-01 |
Fuel, Office Supplies, LOX & Nitrogen, Flight Deck Clothing |
|
What are the duties and responsibilities of an RPPO |
Track funding and document number status |
|
What does MAF stand for |
Maintenance Action Form |
|
What are the two parts to an NSN |
FSC & NIIN |
|
What is S-6 division also known as? |
Aviation Support Division |
|
What does FEDLOG stand for |
Federal Logistics |
|
What does AMMRL stand for |
Aircraft Maintenance Material Readiness List |
|
What does CRIPL stand for |
Consolidated Remain-In-Place List |
|
What does BCM stand for |
Beyond Capable Maintenance |
|
What is PMU responsible for |
Processing and expediting high priority requisitions |
|
What does AIR stand for |
Aircraft Inventory Record |
|
What is FEDLOG used for |
Provides parts data for all items carried by the supply system |
|
What does RAM stand for |
Repairable Asset Management |
|
Explain what CRIPL is |
Listing of all authorized remain in place items which is published by NAVICP |
|
How many digits are in an NSN |
13 |
|
What does IMRL stand for |
Individual Material Readiness List |
|
What type of fund is OFC-50 |
Aviation Fleet Maintenance |
|
What is a DD 1348 |
DOD Single Line Item Requisition System Document (Receipt) |
|
What does ICRL stand for |
Individual Component Repair List |
|
What does NSN stand for |
National Stock Number |
|
What does IMA stand for |
Intermediate Maintenance Activity |
|
What does NIIN stand for |
National Item Identification Number |
|
What does EXREP stand for |
Expeditious Repair |
|
How long do you have to provide a turn in of repairable item with a remain in place chit? |
24 hours |
|
What does AVDLR stand for |
Aviation Depot Level Repair |
|
How are AVDLR's funded |
Navy Working Capitol Fund (NWCF) |
|
Name the funds that is granted by TYCOM |
S&E, AOM, Flight Ops, IMRL |
|
How many digits are in a NIIN |
9 |
|
Name the items that can be procured with OFC-50 |
Paint, Repair Parts, Tools |
|
What does NMCS stand for |
Non Mission Capable Supply |
|
What does PMCS stand for |
Partial Mission Capable Supply |
|
Explain NMCS |
Material condition of an aircraft that is not capable of performing ANY of its missions |
|
Explain PMCS |
Material condition of an aircraft that can perform at least one but not all of its missions due to supply shortage |
|
How many units make up SRS |
Five |
|
What are the units that make up SRS |
RCU, TRU, MDU, PMU, PEB |
|
What does OPTAR stand for |
Operating Target |
|
What does ROD stand for |
Report of Discrepancy |
|
What does PEB stand for |
Pre-Expended Bin |
|
What COG identifies an AVDLR |
7R |
|
What are the three levels of maintenance |
Organizational, Intermediate, & Depot |
|
What does MSDS stand for |
Material Safety Data Sheet |
|
Name one item required on the label for HAZMAT |
Material Name, Manufacturers Name & Address, NSN, Nature of Hazard |
|
What does NALCOMIS stand for |
Naval Aviation Logistics Command Management Information System |
|
What is the purpose of a PEB |
Shorten the issue and accounting procedures for recurring issues of maintenance related materials |
|
What does SRS do |
Single point of contract for processing customer requirements and providing status updates |
|
What is DD Form 200 |
Survey |
|
What information is contained in the MSDS |
Material Composition, Chemical & Physical Characteristics, Health & Safety Hazards, Precautions for Handling |
|
Define Hazardous Material |
Discarded material which meets the definition of HAZMAT |
|
What are the 6 categories of HAZMAT |
Flammable, Aerosol, Toxic Materials, Corrsives, Oxidizing Materials, Compressed Gases |
|
How often are HAZMAT stowage locations inspected |
Weekly & Quarterly |
|
What types of PPE are required for handling HAZMAT |
Eye Protection, Boots, Respirator, Gloves |
|
Locations of MSDS |
Work Center, Safety, Medical, Supply, Engineering |
|
What does AUL stand for |
Authorized Users List |
|
Who is the SUPPO |
CDR York |