• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/19

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

19 Cards in this Set

  • Front
  • Back
What alarm or indication would indicate a failed spent fuel pool liner? A. SFP LI-123 Drain Standpipe Level decreasing.B. SFP Pump Flow Low annunciator.C. SFP Pump Trip annunciator.D. SFP Level HI/LO annunciator.
D
The plant is currently in MODE 6, two weeks after a refueling outage for an NRC required inspection of the lower internals. All fuel was off-loaded, but one assembly was found inappropriately stored (based on burnup) in Region 2 of the Spent Fuel Pool.What (if any) TS action is required? A. Within one hour, initiate a core map to verify fuel is properly stored.B. No action required, Region 2 is acceptable.C. Immediately initiate action to move non-complying fuel assemblies into Region 1.D. Immediately initiate action to move non-complying fuel assemblies into Region 3.
C
The plant is in MODE 6, all fuel in the SFP after an 18 month cycle. SFP temperature is 102?F .A loss of site power causes SFP cooling to be lost.What is the minimum time to boil? A. 23 minutesB. 12 minutes.C. 19 minutes.D. 37 minutes.
A
Given the following:* Unit is in a refueling outage* Core on-load is almost complete* The refueling crew in the Fuel Building is moving a fuel element through the gate that separates the spent fuel pool and the fuel transfer canal* The refueling SRO notices that refueling pool level is slowly decreasingWhat should be done with the element in transit? A. Lower it into the fuel transfer cart and leave on the Fuel Building side.B. Place it in the Rod Control Cluster Assembly (RCCA) change fixture.C. Returned it to the Refuel Pool.D. Return it to the Spent Fuel Pool.
D
Siphoning of the Spent Fuel Pool is prevented by having the SFP Cooling Water pump suction line terminate ____________________. A. five feet above the spent fuelB. at the normal water levelC. above the minimum safe water levelD. even with the emergency makeup line
C
All of the following are sources of potential makeup to the Spent Fuel Pool, EXCEPT____________________________. A. Essential Service WaterB. Component Cooling Water Surge TankC. Refueling Water Storage TankD. Recycle Holdup Tank
B
A ________ in each Fuel Pool Cooling and Cleanup System Spent Fuel Pool Skimmer Pump is designed to prevent siphoning of the Spent Fuel Pool. A. rupture discB. vent holeC. isolation valveD. diaphragm
B
The Fuel Pool Cleanup System removes impurities from the water in order to _______________________________. A. minimize corrosion of the Spent Fuel Pool and fuel assemblies.B. maintain pool optical clarity and lower area radiation levels.C. stabilize pH swings caused by interaction with the high boron concentration.D. lower boron concentration in the Spent Fuel Pool.
B
Containment Closure is set. The following conditions exist:* Spent Fuel Pool (SFP) level on EC LI-39A indicates "0"* Refueling pool level is at 2045 feet, 11 inches.* Containment purge exhaust fan is running.After opening the transfer tube valve, EC-V995, the operator reports that the transfer canal level is decreasing. The Control Room notes that the SFP level decreased to -2". The instrument tunnel sump level has not changed.Which of the following is the most likely cause of the level change? A. levels in the refueling pool and SFP equalizingB. positive pressure in containmentC. negative pressure in containmentD. leakage around the cavity seal ring
C
The Fuel Pool Cooling and Cleanup System interfaces with the Boron Recycle System in that ____________________. A. the Boron Recycle System provides automatic makeup to the Spent Fuel Pool.B. the Fuel Pool Cleanup Systems filters drain to the RHUTs.C. the Recycle Evaporator Feed Pumps may pump directly to the Fuel Transfer Canal.D. Fuel Pool Demineralizer high temperature bypass diverts to the RHUTS.
C
A Safety Injection Signal has just occurred concurrent with an undervoltage condition on NB02. Prior to this event, the operating crew had just placed the "A" Spent Fuel Cooling Pump in service and aligned the system for makeup from the RWST to the Spent Fuel Pool. What describes the present status of the Spent Fuel Pool System? A. NE02 will re-energize NB02 and the shutdown sequencer will restart "A" Spent Fuel Pool Cooling pump.B. The load shed circuit deenergized B Spent Fuel Pool Cooling Pump.C. The Spent Fuel Pool heat exchanger CCW motor operated discharge valves are closed by the SIS.D. Both Spent Fuel Pool Cooling pump remain running throughout the event.
B
An undervoltage on the NB busses occurred which load shed the Fuel Pool Cooling Pumps.How are these pumps restarted? A. ManuallyB. Automatically on low flowC. Automatically after sequencer has timed outD. Locally in the heat exchanger room
A
The plant is currently in MODE 6, two weeks after a refueling outage for an NRC required inspection of the lower internals. All fuel was off-loaded, but one assembly was found inappropriately stored (based on burnup) in Region 2 of the Spent Fuel Pool.What (if any) TS action is required? A. Immediately initiate action to move non-complying fuel assemblies into Region 3.B. Within one hour, initiate a core map to verify fuel is properly stored.C. No action required, Region 2 is acceptable.D. Immediately initiate action to move non-complying fuel assemblies into Region 1.
D
The plant is in MODE 6, all fuel in the SFP after an 18 month cycle. SFP temperature is 102?F .A loss of site power causes SFP cooling to be lost.What is the minimum time to boil? A. 23 minutesB. 12 minutes.C. 19 minutes.D. 37 minutes.
A
Which system is not used to prevent the Spent Fuel Pool from being inadvertently drained? A. Fuel Pool Cooling pumps suction located at the top of the pool.B. Instrument Air inflated seal on the Fuel Transfer Canal GateC. Anti-siphon (vent hole) in the Fuel Pool Cooling water return line.D. Anti-siphon (vent hole) in Surface skimmer suction lines.
B
The Spent Fuel Pool Water Level is at 19 feet over the top of the irradiated fuel assemblies.Which of the following indicates the significance of, or basis for this level? A. Pursuant to 10 CFR 50.37a the radioactivity levels in liquid and gas effluents will be maintained in the event of the Design Basis Fuel Handling Accident.B. Radiation levels will increase on the manipulator crane over the refueling pool due to inadequate shielding.C. Iodine may not be adequately scrubbed from gas bubbles escaping from a damaged or leaking assembly.D. On a loss of offsite power there will be insufficient mass to prevent boiling prior to restoration of Spent Fuel Pool Cooling.
C
The plant is in Mode 5. B KA air compressor is tagged out for maintenance when an electrician inadvertantly de-energizes PA01 bus.What prevents draining the Spent Fuel Pool to the refueling canal in this condition? A. A semi-pneumatic seal replaced the original seal so an air source is unnecessary.B. Gate seals are inflated with nitrogen and isolated so loss of air will not affect them.C. Procedural requirements to maintain a minimum level in the refueling canal to prevent sluicing in the event of a loss of air.D. A check valve and nitrogen backup maintain the gate seals inflated.
B
The New Fuel Storage Facility may be used to store a number of new fuel assemblies. What design feature ensures that the fuel will remain in a sub-critical array? A. Radiation monitors detect changes in storage area radiation levels.B. Drain lines in the floor prevent water accumulation within the vault.C. New fuel storage modules are spaced at 21 inches, center-to-center.D. Boric acid injection tank discharges into the vault on a high water level.
C
The Spent Fuel Pool and New Fuel Storage Area are monitored for an inadvertent criticality accident using which monitors? A. SD RE-04, 05, 06 and 07B. GT RE-22, 31, 32 and 33C. AB RE-111, 112, 113 and 114D. SD RE-35, 36, 37 and 38
D