• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/12

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

12 Cards in this Set

  • Front
  • Back
Question 1: Does the Vibration and Loose Parts Monitoring System provide the plant with any protection features?
Answer: No
Question 2: What is the reason for having a Vibration and Loose Parts Monitoring System?
Answer: Provides for early detection of loose metallic parts within the Reactor Coolant System.
Question 1: In addition to providing a recorded signal of a loose part, what other type of signal is provided?
Answer: audible.
Question 2. To be detected a loose part must have at least how much kinetic energy and strike the inside surface of the RCS within how many feet of a sensor?
Answer: 0.5 ft-lbf, 3 feet
Question 1: The Loose Parts Subsystem consists of ____ independent instrumentation channels.
Answer: 12
Question 2: What is the purpose of the Vibration Subsystem proximitor?
Answer: Drives the probe and converts the probe gap information into a proportional linear DC output voltage.
Question 4. What three general areas are monitored for loose parts?
Answer : Reactor vessel upper head Reactor vessel lower head Each SG reactor coolant inlet plenum
Question 1: With the system in automatic, what is the sequence of events that are supposed to take place when a strike occurs near a sensor?
Answer: 1) Channel alarm is activated, 2) Audible alarm is initiated, 3) Data is recorded 4) Selection of the alarmed circuit occurs, 5) Main Control Board alarm actuates.
What was the cause of the Point Beach event?
Answer: Failure of FME Controls
What was the cause of the Vogtle event?
Answer: Failure of Split Pins
What potential problem exists if a plant continues operating after indications of a loose part are evident?
Answer: Damage to Tubes Tube sheet and Fuel Rods
What tools/techniques are used at WGCS to prevent similar occurrences?
Answer: Split Pins were changed out. DMIMS was installed