• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/75

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

75 Cards in this Set

  • Front
  • Back
Which of the following sets of indication is NOT available at the Auxiliary Shutdown Panel? A. Steam Generator wide range and narrow range levels.B. Gammametrics and letdown orifice isolation valve position.C. Normal letdown flow rate and excess letdown pressure.D. CST level and Turbine Driven AFW Pump speed.
C
There are 13 local/remote switches at the Auxiliary Shutdown Panel in addition to RP HIS-1,2 & 3 (Control Room Isolate Switches).Which of the following would NOT be affected when all 13 local/remote switches are taken to the "LOCAL" position? A. Turbine Driven AFW Pump governor valve (FC HV-313).B. Motor Driven AFW Pump discharge valves.C. Turbine Driven AFW Pump discharge valves.D. Letdown orifice isolation valves.
D
Where can Motor Driven AFW "B" Pump be started, if it's Auxiliary Shutdown Panel handswitch (RP HIS-2) is placed in the 'Control Room Isolate' position? A. At the Main Control Board and by the LOCA Sequencer.B. At the ASP and the 4160V NB breakerC. At the Main Control Board and the 4160V NB breaker.D. At the ASP and by the Loss of Coolant Accident (LOCA) Sequencer.
B
Several "B" Train components have isolation switches on the ASP. What do these switches accomplish? A. Isolate the equipment controls from the Main Control Board to avoid any spurious actuations that could result from the grounding or short-circuiting during or following a fire.B. Isolate the equipment controls from the local control switch at the specific piece of equipment, preventing any spurious actuations that could result from grounding or short-circuiting during or following a fire.C. Isolate the equipment controls from the ASP to prevent unauthorized equipment operation during times of sabotage.D. Connect an alternate source of control to the equipment when adverse containment atmosphere has rendered the normal control circuits inoperable.
A
Which of the following describes how the operator becomes aware of the operation of an isolation switch on the ASP, other than annunciator 00-129F? A. A flashing open and close light on the valve controller on Panel RL005/006.B. A lit orange remote light on the valve controller on Panel RL005/006.C. A continual 90 second reflash of the annunciator 00-129F.D. A Supervisory Control Not In Normal alarm on the MCB.
B
Which of the following groups of parameters are displayed on the ASP? A. RCS Tavg, S/G pressure, S/G level, both Intermediate RangesB. RCS WR pressure, S/G pressure, S/G Level, containment pressureC. RCS CL Temp., RCS HL Temp., S/G level, & S/G pressureD. RCS HL Temp., S/G level, TDAFWP flow, Charging Flow
C
Some B train components have isolation switches on the Auxiliary Shutdown Panel.What is the purpose of these switches? A. Provide alternate controls during adverse containment.B. Control specific equipment to prevent spurious operations.C. Prevent unauthorized equipment operation during times of sabotage.D. Avoid spurious actuations from shorting during or following a fire.
D
With the plant in Mode 2 a fire occurred in the Control Room. After the crew tripped the reactor and transferred controls to the Auxiliary Shutdown Panel (ASP) all four S/G levels drop off-scale low on Narrow Range. The Turbine Driven Auxiliary Feed Pump (TDAFP) was NOT running PRIOR to the trip. How will the TDAFW Pump be started? A. Automatically on low-low S/G level in two S/Gs.B. Automatically when the operator deenergizes NB01 or NB02.C. Manually from the ASP.D. Manually from the MCB.
C
The Auxiliary Shutdown Panel is designed to _____________________________________. A. maintain the plant in cold shutdown when the control room must be evacuated.B. maintain the plant in hot standby when the control room must be evacuated.C. maintain the plant in hot standby condition during act of sabotage.D. maintain the plant in cold shutdown condition for refueling operations.
B
Several "B" Train components have isolation switches on the Auxiliary Shutdown Panel. What do these switches accomplish? A. Isolation of equipment controls from the Main Control Board to avoid spurious actuations.B. Connect an alternate source of control to the equipment when adverse containment atmosphere has rendered the normal control circuits inoperable.C. Isolation of equipment controls from local control switches at the equipment, preventing spurious actuations.D. Isolate the equipment controls from the ASP to prevent unauthorized equipment operation during times of sabotage.
A
A control room evacuation has been conducted due to a bomb threat and plant operations have been transferred to the Aux Shutdown Panel (ASP). What are ALL of the controls available to the operator at the ASP to control AFW parameters? A. MDAFWP A & B breakers, MDAFWP flow control valves for SG A-D, TDAFWP flow control valves for SG A-D, and Steam Supply Valves for the TDAFWPB. MDAFWP A breaker, TDAFWP speed control, MDAFWP flow control valves for SG A & D, TDAFWP flow control valves for SG A-DC. MDAFWP A & B breakers, TDAFWP speed control, MDAFWP flow control valves for SG A-D, TDAFWP flow control valves for SG A-D, and Steam Supply Valves for the TDAFWPD. MDAFWP A breaker, TDAFWP speed control, MDAFWP flow control valves for SG A-D, TDAFWP flow control valves for SG A-D
C
Control of the Turbine Driven Auxiliary Feedwater Pump (TDAFWP) has been transferred to the Auxiliary Shutdown Panel (ASP) due to an uninhabitable Control Room. After transfer of control to the ASP, all 4 S/G levels drop off-scale low on the Narrow Range indicators. The TDAFWP was NOT running prior to the the transfer.What is the response ot the TDAFWP, given these conditions? A. Will AUTOMATICALLY START when both Main Feed Pumps trip.B. Will AUTOMATICALLY START when the Operator OPENS Normal Feeder Breaker to NB01 or NB02.C. Will NOT AUTOMATICALLY trip on overspeed.D. Will NOT receive any AUTOMATIC START signals.
D
Which of the following sets of indications are available on the Auxiliary Shutdown Panel? A. AFW flow, containment pressure, charging pump header flowB. Letdown flow, Charging Pump Discharge Pressure, WR RCS pressureC. VCT level, CST level, Excore Power Range indicationD. Pressurizer Level, TDAFWP suction pressure, S/G WR Level
D
When would the Auxiliary Shutdown Panel (ASP) be manned for the purpose of operating plant equipment, other than surveillance testing? A. the Shift Manager's decision, based on adverse environment in the Control Room.B. if the plant was shutdown and the Paint Department needed to repaint the Main Control Boards.C. due to a loss of all telephone and radio communications.D. on a loss of all electrical power and the Plant Manager requests evacuation of the Control Room.
A
Although the controls and switches for selected components on the Auxiliary Shutdown Panel (ASP) are the same as those found on the Main Control Board, why must extra care and caution be observed when operating at the ASP? A. Only the TDAFW pump is available for heat RCS heat removal.B. The "B" Motor Driven AFW Pump cannot be started or stopped until the controls have been isolated from the control room.C. There are no annunciators or alarms to warn of abnormal conditions.D. Control switches on the ASP will not function after "B" Train components are isolated from the control room.
C
> A. There are fewer circuits on the "B" Train Panel.B. During the Brown's Ferry fire, mostly "A" Train components failed.C. The TDAFW pump controls were on the "B" Train Panel.D. The TDAFW pump controls are on the "A" Train Panel.
C
What is the purpose of the Recycle Evaporator Feed Demineralizers A & B Feed Temperature Control Valve (HE TCV-250)? A. Control the temperature of the Feed Demineralizer inlet flow.B. Control the temperature of the Boron Recycle System Evaporator Feed Flow.C. Protect the Recycle Holdup Tanks rubber diaphragm from high temperature.D. Protect the Recycle Evaporator Feed Demineralizer from damage from high differential pressure or high temperature.
D
How are the gases removed from below the diaphragm in the Recycle Holdup Tanks (RHUT)? A. Vented to the RHUT Room where they are exhausted to the Radwaste Exhaust Ventilation.B. A vent eductor takes a suction on the space under the diaphragm and discharges to the Waste Gas System.C. A small rotary compressor is aligned to take a suction on the space under the diaphragm and discharges to the Waste Gas System.D. Vented to Radwaste Ventilation Exhaust System downstream of the filter.
B
Which of the following describes the pressure at which all three Fire Protection Pumps will be operating? A. 100 psigB. 120 psigC. 125 psigD. 110 psig
A
The purpose of installing an Automatic Pre-Action sprinkler in the Fire Protection/Detection System for the Auxiliary Building is to prevent ________________________. A. a discharge of water on electrical equipment.B. corrosion of equipment that is necessary for the safe shutdown of the plant.C. an accidental discharge of water on protected equipment.D. causing fixed contamination to become loose contamination.
C
The Fire Protection Water Spray System for "B" Main Transformer phase automatically actuated on detection of a fire at 100% power.What will be the immediate effect on plant operations? A. Runback to 50% powerB. Unit trip due to isolation of transformerC. No effect on unit operationsD. Trip due to short circuit of bushing
B
The Fire Protection/Detection System interfaces with other systems in that __________________________________________________. A. automatic operation of the water sprays protecting the XNB01 and XNB02 transformers will cause an isolation of the power feeds to the appropriate transformer.B. upon detecting a fire in an area protected by a Halon System, the Fire and Smoke Detection System closes fire dampers and shuts down associated ventilation systems.C. the automatic pre-action system uses the Nitrogen System to monitor the piping integrity.D. the normal power supply to the multiplexers is 125V DC from the PK System with a backup from PG15/PG16 via an internal transformer and rectifier.
B
The Fire Detection and Alarm System Main Control Room Panel, KC-008, provides operator information and control for each of the following except for_____________________? A. jockey fire pump controlB. system discharge alarmsC. diesel driven fire pump controlD. system trouble alarms
A
Which switch on the local panel of the Fire Protection Halon 1301 System is used to restart the timing delay feature? A. AbortB. Inhibit keyC. Reset buttonD. On/Off
A
What components are considered safety-related within the Fire Protection System? A. Valves and piping within safety related Structures, Systems, and Components (SSC)B. Containment PenetrationsC. Fire Extinguishers in the Control Room and rear panel areaD. KC-008 Control Panel and actuation circuitry
B
The steam control valve to the Plant Heating System Heat Exchanger will modulate to control water temperature when which condition is satisfied? A. a system flow switch is satisfiedB. outside air temperature is lowC. a system pressure switch is made upD. one of the hot water pumps is running
D
The Boron Heat Tracing System functions to maintain the ______________________________________________. A. temperature of the system sample and instrument lines in the CVCS, in order to prevent condensation.B. boric acid solution in the various components of the system, below the crystallization temperature.C. normal operating range of the boron heat tracing between 175 and 185 degrees F.D. minimum temperature in the piping and valves of the waste processing system containing up to 4.4 weight percent boric acid.
D
A heat trace alarm on an Outside Heat Trace Panel, is actually an indication of what? A. loss of continuityB. low temperatureC. loss of amperageD. low voltage
A
How many hours must the reactor be subcritical prior to movement of irradiated fuel in the Reactor Vessel? A. 24 hoursB. 72 hoursC. 100 hours (76 hours)D. 48 hours
C
What is the function of the Cask Handling Cranes main hoist?
The main hoist has a 150-ton capacity and is used to transport spent fuel shipping casks between rail cars or trucks, the Wash Down Area, and the Cask Loading Pool.
A new fuel shipping container is being moved up from the 2000? level to the 2047? level of the Fuel Building. The Cask Handling Crane operator is moving the container west and releases the control button, but the crane continues to move.What action should the operator take to quickly remedy the situation? A. Lower the container to the floor before it travels too far to the west.B. Call the control room and direct entry into OFN KE-018, Fuel Handling Accident.C. Move the sticking controls in the opposite direction and allow interlocks to stop crane movement.D. Push the STOP button, as it will override all other crane control functions.
D
The overload interlock on the New Fuel Elevator prevents _____________ the elevator unless it is _____________. A. lowering/emptyB. raising/fully loadedC. lowering/fully loadedD. raising/empty
D
What new fuel elevator interlock prevents inadvertent Fuel Handling Accidents? A. Lower, bypass to lower new fuel.B. Raise, bypass to raise new fuel.C. Raise, bypass to raise spent fuel.D. Lower, bypass to lower spent fuel.
B
What is one of the first actions taken in the event of a Fuel Handling Accident? A. Attempt to retrieve associated fuel assemblyB. Evacuate the areaC. Evaluate internal contamination by a whole body countD. Put on additional dosimetry and continue fuel movements
B
The plant is in the following condition:* Mode 6 with core alterations in progress.* Steam generator secondary manways are removed for sludge lancing.* The refueling pool level is 24 feet above the reactor vessel flange with two trains of RHR operable.* Steam generator primary side manways are open with nozzle dams installed, in preparation for eddy current testing.Which one of the following maintenance activities requires a suspension of core alterations and movement of irradiated fuel in Containment? A. Removing a steamline safety valve for bench testing of lift setpoint.B. Starting to perform the eddy current testing of the steam generators.C. Testing the automatic isolation of the Containment purge valves.D. One train of RHR cooling is taken out of service to test motor operator valve settings.
A
Core offload is in progress with "B" CCP in service and "A" CCP DNO'd. "A" EDG is inoperable for maintenance. Chemistry reports fuel oil for "B" EDG exceeds contamination limits. The Shift Manager immediately suspends fuel movement. An assessment of current conditions reveals the following:* It will take 30 minutes to have an operator at BG HV-8104, Immediate Borate Valve* It will take 1 hour to line up the "A" CCP to the RCS.* It will take 6 hours to make "A" EDG operable.* It will take 10 hours before "B" EDG will be operable.* BG V8643, "A" Boric Acid Transfer Pump Suction Valve, is being replaced and will take an additional 14 hours to replace.* The RWST is drained and it will take 12 hours to fill it to 10%.* "B" BAT level is 15%.How soon can fuel movement be resumed? A. 1 hourB. 6 hoursC. 10 hoursD. 12 hours
C
Who is in charge of spent fuel transfer operations during Refueling Operations? A. Shift Technical AdvisorB. Refueling ManagerC. Refueling SROD. Reactor Engineer (New Fuel Supervisor)
C
The unit is in Mode 6 for a refueling outage. Fuel reload is in progress.At 1000 on 8/1, unborated water source isolation valves BG-V0178 and BG-V0601 are open.Fuel movement is suspended.At 1100 on 8/1, unborated water source isolation valves BG-V0178 and BG-V0601 are closed and locked.What is the proper application of Technical Specifications for this condition? A. Do NOT restart CORE ALTERATIONS until after operability of source range monitors is verified by 1400 on 8/1.B. CORE ALTERATIONS can be restarted when the LCO statement is met. No further actions are required.C. Do NOT restart CORE ALTERATIONS until after the boron concentration is verified within limits, which must be performed by 1400 on 8/1.D. CORE ALTERATIONS can be restarted but the boron concentration must still be verified within limits by 1400 on 8/1.
C
Given the following:* The plant is in MODE 6 with fuel movement in progress.* Irradiated fuel is being moved to the upender.* Containment Ventilation isolates.* Local area radiation and portable air monitors alarm.* The refueling pool level is NOT changing.WHICH ONE (1) of the following is the PREFERRED location for safely storing the irradiated fuel assembly prior to containment evacuation? A. In the upender, in the vertical position.B. In the reactor vessel.C. In the transfer cart, transferred to SFP.D. In the upender, in a horizontal position.
B
The Radwaste Operator is releasing the contents of Waste Monitor Tank "A" to the cooling lake per SYS HB-130. "Waste Monitor Tank A Discharge to the Environs", when a loss of vacuum Turbine Trip/Reactor Trip occurs due to a trip of all Circulating Water Pumps.What is the Radwaste Operator's most immediate concern? A. Verification that Radwaste Building Discharge Isolation Valve (HB RV-18) has closed.B. Verification that Waste Monitor Tank "B" is aligned to receive liquid.C. Verification that Secondary Liquid Waste Discharge Isolation Valve (HF RV-45) has closed.D. Verification that Steam Generator Blowdown Discharge Isolation Valve (BM FV-54) has closed.
A
With a normal unit shutdown in progress, Tank THB07A, (Waste Monitor Tank A), is being discharged at 100 gpm IAW the Liquid Release Permit. One Circ Water Pump is secured during load reduction when HB RE-18 (Plant Discharge Line Process Rad Monitor) alarms at its ALERT setpoint unexpectedly.What should the crew do now? A. Reduce the release rate until the alarm is cleared.B. Secure the tank release until Circ Water Pump is restarted.C. Continue the tank release while evaluating the ALERT alarm.D. Terminate the tank release and re-sample.
C
While performing a discharge from Secondary Liquid Waste Monitor Tank, THF04A, a Process Rad HI HI alarm is received. An investigation determines the alarm is being caused by the discharge.What action is required? A. Verify closed HF RV-45, SLW Plant Discharge Valve.B. Close HF HV-61, SLW Drain Collector Tank Dump Discharge Valve.C. Secure the Secondary Liquid Waste Evaporator.D. Verify closed HB RV-18, Liquid Waste Discharge Isolation Valve.
A
What subsystems comprise the Liquid Radwaste System (LRWS)? A. RCDT, Drain Channel A, Drain Channel B, Laundry waste, Chemical WasteB. RWST, Drain Channel A, Drain Channel B, Laundry waste, Chemical WasteC. RMUWS, Drain Channel A, Drain Channel B, Laundry waste, Chemical WasteD. RCDT, Drain Channel A, Drain Channel B, Laundry waste, SGBD
A
What effect does a Containment Isolation Signal Phase "A" (CISA) have on the Reactor Coolant Drain Tank Subsystem? A. Opens isolation valves on drain lines to RCDT and closes RCDT discharge line isolation valves.B. Closes inside/outside RCDT vent isolation valve (HB HV-7126/7150) and closes RCDT discharge line isolation valves (HB HV-7136/7176).C. Closes isolation valves on drain lines to RCDT and closes RCDT discharge isolation valves to outside containment.D. Closes isolation valves on drain lines to RCDT and opens RCDT discharge isolation valves to outside containment.
B
What is the response of the TUF Main System Isolation Valve (TUF AV-6) when selected to "AUTO"? A. Closes whenever TUF-FV-7, Level Control Valve closes.B. Closes on a low inlet pressure to TUF TK-1, TUF Feed Tank.C. Closes on a high inlet pressure to TUF TK-1, TUF Feed Tank.D. Closes on a high level alarm for the TUF TK-1, TUF Feed Tank.
D
What is the effect of placing the SRO/TUF-HS-5000 Local/Remote Switch in REMOTE position? A. all local interface control devices are locked out, excluding E-Stop push buttonsB. SRO Feed Pump speed may be adjusted at the Operator Interface PanelC. Setpoint adjustment of the SRO Reject Flow Control Valve is locked outD. TUF CIP Tank may be placed on recirculation remotely by starting the TUF CIP Pump
A
What is NOT a location with an Emergency Stop Manual Pushbutton for the Zero System? A. TUF CIP Skid Control PanelB. TUF Main Control PanelC. East stairwell, 2031' level, Radwaste BuildingD. TUF Feed Tank Skid Control Panel
C
While refueling, a fuel assembly is raised to just above the top of the core. When the operator tries to move the trolley to relocate the fuel, the trolley does not move.What must be done to move the trolley? A. Move the bridge to the index mark.B. Place the Interlock Key switch to the ACTIVE position.C. Raise the hoist to its upper limit.D. Rotate the mast until the mast rotation light is out.
C
The Refueling Machine gripper must be at the Top Limit position before you raise the upender.Why is this required? A. An interlock prevents operating the gripper in the Transfer Canal unless the gripper is at the Top Limit position.B. Fuel could be damaged since there is no interlock to prevent upender operation with the Refueling Machine in the Transfer Canal.C. If the gripper is not at the Top Limit position the Refueling Machine could be damaged.D. An interlock prevents raising the upender if the Refueling Machine is in the Transfer Canal.
D
What Motor Control Center (MCC) provides power to the Manipulator Crane? A. PG26H, located in the Fuel Building.B. PG20P, located in the Containment Building.C. PG25H, located in the Fuel Building.D. PG19N, located in the Auxiliary Building.
B
Who grants permission to bypass Refueling Machine interlocks? A. Outage ManagerB. Plant ManagerC. Shift ManagerD. Refueling Senior Reactor Operator
D
In Mode 6 with Core Off-load in progress, the reactor operator operating the Refueling Machine notices he entered the RCA without Electronic Dosimetry.What action is now required? A. Inform the Control Room Supervisor, he is allowed to move fuel until relieved.B. Inform the Refueling SRO and he must return to HP Access.C. Inform the Refueling SRO and keep moving fuel since HP will bring proper dosimetry to him.D. Inform the Control Room Supervisor and wait for HP in Containment to contact him.
B
While at 100% power, several NPIS field inputs indicate a status of "BAD" and change color to BLUE.What does this indicate? A. PQ02 or PQ03 de-energizedB. Field input relays have failedC. PQ04 or PQ05 de-energized, NPIS must be evaluatedD. A multiplexer failed; NPIS functions must be evaluated
D
The plant is in Mode 1 with the NPIS computer inoperable. Reactor power is being raised to 100% by nuclear instrumentation following a refueling outage. An OT delta T ROD STOP alarm (ANN 82B) is received and no runback occurs. Power range NIs indicate 98%, and generator load is 1205 MWe.In addition to stopping generator loading, what actions are required? A. Reduce turbine load and perform STS RE-009, HEAT FLUX HOT CHANNEL FACTOR MEASUREMENT.B. Verify deltaT power is less than or equal to 100% once per hour until NPIS is restored.C. Ensure deltaT power is less than or equal to 100% and perform a power range calorimetric.D. Reduce power to 80% and perform a power range calorimetric.
C
What indication in the control room alerts operators to a failure of both NPIS CPUs? A. Annunciator 068F "NPIS CMPTR UPS FAIL" alarms.B. All screens will turn blue and flash the message "SYSTEM LOCKUP".C. All screens continue to indicate the last valid data.D. All NPIS points will indicate a quality code of "INVL" and turn blue.
C
A fault on SL-2 causes the supply breaker to trip open. Maintenance personnel report the bus will be deenergized for two hours while making repairs.How will the Nuclear Plant Information Sytem (NPIS) be affected if no other action is taken? A. An uninterruptable power supply maintains Multiplexer power, therefore no affect.B. All NPIS functions are lost after 60 minutes.C. 1/2 of the field inputs lose power after 60 minutes.D. 1/2 of all field inputs are lost immediately.
B
The plant was at full power when a loss of off-site power and NB02 bus LOCKOUT occurred. The crew has stabilized the unit using EMG and OFN procedures. Electrical Maintenance is repairing NB02.What are the long term implications of this condition to the Nuclear Plant Information System (NPIS)? A. PQ02 Static Bypass Switch will go to ALTERNATE POWER.B. Half of the field inputs will lose power.C. Distribution Panels PQ04 and PQ05 will have to be cross-tied.D. Both CPU's will lose power.
B
The plant is MODE 5 and I & C technicians are using an NPIS terminal in the rear of the Control Room. They have accessed a system Graphic Display for the Heater Drain System (AF).Can the BOP Operator access this same display on TT02 terminal at the same time? A. Yes, the terminals in the Control Room are one trunk.B. Yes, each work station is independent.C. No, NPIS will only process one terminal program demand.D. No, the terminals in the Control Room are one trunk.
B
At 2330 hrs on 09/27 with the plant at 37% power, annunciator 068F, NPIS CMPTR UPS FAIL, actuates. The Control Room enters OFN RJ-023, LOSS OF NPIS COMPUTER. All surveillances are current for 09/27.What action is required by Technical Specifications within one (1) hour (not including S.R. 3.0.2 time extensions)? A. Perform a leak rate using STS BB-004, RCS WATER INVENTORY BALANCE.B. Perform a rod position verification and log it using the Attachment in the OFN.C. Perform a verification of thermal power using STS SE-002, MANUAL CALCULATION OF REACTOR THERMAL POWER.D. Log axial flux difference using STS SF-002, CORE AXIAL FLUX DIFFERENCE.
C
Maintenance is performing routine adjustments to PQ02 25 KVA inverter.What condition would cause a loss of half the field inputs to the Nuclear Plant Information System (NPIS)? A. Static Bypass Switch failureB. Loss of off-site power.C. NB02 bus lockoutD. PK04 voltage drops <105 VDC
B
The DC input breaker to PQ03 25KVA Inverter tripped.What is the power supply to PQ05 Distribution Panel in this condition? A. NG01AB. SL-2C. PK03D. PG12
D
The AC bridge rectifier in PQ02 has failed.What is the power supply to Distribution Panel PQ04? A. NG02AB. PK04C. PG12D. PQ05
B
The plant is MODE 5 and I & C technicians are using a NPIS terminal in the rear of the Control Room. They have accessed a system Graphic Display for the Heater Drain System (AF).Can the BOP Operator access this same display on TT02 terminal at the same time? A. Yes, the terminals in the Control Room are one trunk.B. No, the terminals in the Control Room are one trunk.C. No, NPIS will only process one terminal program demand.D. Yes, each work station is independent.
D
What would cause the Nuclear Plant Information System (NPIS) to fail-over to the backup CPU? A. Operator requested point substitutionB. Computer Services performing routine maintenanceC. Failure of a critical processD. Substitute value inserted for a given point
C
What power supply failure will de-energize both Nuclear Plant Information System (NPIS) Central Processing Units (CPUs)? A. PQ04 BusB. SL-2 BusC. RT015D inverterD. PK03 Bus
C
Which of the following is NOT a source of gas to the Waste Gas System? A. Pressurizer Relief TankB. Volume Control TankC. Recycle Holdup TanksD. Waste Holdup Tank
D
Which tank is a source of gas to the Waste Gas System? A. Primary Spent Resin Storage TankB. Waste Holdup TankC. Boric Acid Storage TanksD. Pressurizer Relief Tank
D
The Oxygen addition valve to the Waste Gas System Hydrogen Recombiners (HACV-1118), closes on which signal? A. Hydrogen in the recombiner room exceeding the Lower Explosion Limit (LEL).B. High level in the hydrogen recombiner moisture separator.C. High oxygen concentration at the inlet of the catalytic reactor.D. Closed position on the VCT Purge Flow Control Valve (BG PCV-115).
C
A Gas Decay Tank is being operated in the release mode. When must the release be immediately terminated? A. Radiation monitor RE-22 fails low.B. Radiation monitor RE-10B becomes inoperable.C. The purge on the VCT is isolated during the release.D. A Radwaste building exhaust fan trips and only ONE is left running.
B
The Waste Gas System Hydrogen Recombiner is in service with the following readings:* Feed stream oxygen at 3.0% on OAIC-1112* Feed stream hydrogen at 3.0% on HACV-1104* Separator inlet temperature at 140 degrees fahrenheit on TCA-1116* Catalytic reactor temperature at 850 degrees fahrenheit on TCA-1114Based on these readings, which of the following occurs? A. Recombiner oxygen flow control valve, HACV-1118 closes immediatelyB. Nothing occurs unless oxygen concentration reaches 3.5% on OAIC-1112C. Hydrogen purge from the VCT is stopped by closure of PCV-115D. Recombiner oxygen flow control valve, HACV-1118 closes over a two minute period.
D
What is an automatic safety feature built into the Waste Gas System recombiner? A. CCW FCV automatically closes on low recombiner water level. B. Helium is automatically injected into the feed to purge out excess Hydrogen.C. Inlet Oxygen is automatically terminated to prevent forming a flammable mixture.D. Oxygen is automatically injected into the gas stream downstream of the recombiner to reduce hydrogen concentration.
C
The Outlet Oxygen Monitor for the standby Recombiner is out of service while the Waste Gas Holdup System is in operation.Is the Technical Requirement met and if not what required actions must be met? A. The Technical Requirement is met.B. The Technical Requirement is not met. Suspend oxygen supply and analyzer grab samples once per 24 hours.C. The Technical Requirement is not met. Suspend operation of the Waste Gas Holdup System.D. The Technical Requirement is not met. Grab samples must be analyzed once per 24 hours.
A
The #8 Waste Gas Decay Tank vent valve is being repaired when Alarm 61B, Process Rad Hi, is received. Investigation reveals GH RE-23 has reached its high alarm setpoint. The Rad Waste Operator reports WGDT #8 pressure decreased 5 psig.What action should be taken? A. Verify Waste Gas Discharge Isolation, HA HCV-14, is shut.B. Evacuate the Radwaste Building and notify the Work Week Manager.C. Ensure a Control Room Ventilation Isolation occurred.D. Notify Chemistry and Health Physics.
D
What is done with radioactive system spent filters when they have been removed from their filter housing? A. Filters are placed in a poly bag and stored in the Owens Corning Building.B. Filters are cleaned with compressed air to be reused.C. Filters are cut up, dried and shipped off site for incineration.D. Filters are placed in a cask or liner for storage until eventual shipment off site.
D
Which of the following is NOT a sub-system of the Solid Radwaste System? A. The Resin Sluicing Sub-system.B. The Filter Handling Sub-system.C. The Resin Charging Sub-system.D. The Portable Demineralizer Processing Unit.
D