• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/9

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

9 Cards in this Set

  • Front
  • Back
Discuss the following 3 phases of training:
(blank)
Carrier Qualification (CQ)
Day and night carrier qualification evolution
Tailored Ship Training Assessment (TSTA)
(blank)
TSTA I
nominally seven days underway. flight deck operations are normally limited to drills and air wing CQ
TSTA II
nominally seven day underway. emphasis is on flight deck operations, moving toward cyclic operations. TSTA I/II are normally combined
TSTA III
a nominal eight day underway period with a four day Final Evaluation Period (FEP) normally conducted as part of COMPTUEX Phase I.
TSTA IV
This is a fleet replacement squadron CQ. engineering training is emphasized during non-flying periods
Competitive Training Unit Exercise (COMPTUEX)
nominally 10 day underway emphasizing in carrier/air wing integration into the battle group
Fleet Exercise (FLEETEX)
completes the advanced training through the battle group evolution