• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/29

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

29 Cards in this Set

  • Front
  • Back

WHAT DIVISION IS PRIMARILY RESPONSIBLE FOR PROVIDING THE AVIATION SUPPORT WITH THE ASSISTANCE FROM OTHER READINESS DIVISIONS?

S-6


AVIATION STORES

WHAT PROVIDES ON-LINE DATA AND MANAGEMENT REPORTS THAT ARE USED TO IMPROVE THE AIRCRAFT READINESS AND INVENTORY VALIDITY?

OPTIMIZED NALCOMIS AIS

THE S-6 DIVISION OFFICER AND THE PRODUCTION CONTROL OFFICER SHALL REVIEW THE PASSWORD ASSIGNMENT ONCE EVERY HOW OFTEN TO ENSURE THE ACCESS CONTROL IS CURRENT?

SIX MONTHS

RPOOL DEMANDS MUST BE REVIEWED AT WHAT INTERVAL?

MONTHLY

THE PRIMARY PURPOSE OF THE WHAT IS TO UPLINE THE STATUS OF THE CRITICAL AVIATION SUPPORT PERFORMANCE INDICATORS TO TYCOM?

AVIATION SUPPORT MANAGEMENT REPORT (ASMR)

WHICH OFFICER WILL CONTROL TRANSACTION INPUT INTO NALCOMIS AND THEIR INTERFACE WITH RSUPPLY?

AVDLR OFFICER

ALL AVIATION OPERATIONS MAINTENANCE (AOM) REQUIREMENTS FOR REPAIRABLE MATERIAL MUST BE SUBMITTED THROUGH WHAT SYSTEM?

O-IMA SYSTEM

WHEN A SQUADRON OR AIMD AWP REPAIRABLE REQUIREMENT IS GENERATED WITH NO RFI QUANTITY AVAILABLE, WHAT FORM WILL BE GENERATED INDICATING LSC "ERIOU"(EXPEDITIOUS REPAIR IOU) ?

DD FORM 1348-1A

ANY DISCREPANCIES NOTED BETWEEN THE VIDS/MAF, THE ISSUE SOURCE DOCUMENT, AND THE ACTUAL MATERIAL RECEIVED MUST BE RESOLVED PRIOR TO INDUCTION BEING ACCOMPLISHED IN WHAT?

NALCOMIS

WHAT WILL APPROVE THE RFI OR BCM DECISION?

AIMD PRODUCTION CONTROL (PC)

WHAT MATERIAL CONSISTS OF "WEAPON REPLACEABLE ASSEMBLIES"(WRAs) OR "SHOP REPLACEABLE ASSEMBLIES" ( SRAs) THAT ARE INITIALLY REQUESTED BY THE CUSTOMER, BUT THE ITEM REQUESTED OR A SUBSTITUTE IS NOT REALLY AVAILABLE ONBOARD?

"D ACTION"

WHAT HOLDS THE OFFICIAL ACCOUNTING RECORDS FOR ALL AVIATION SUPPORT REQUIREMENTS?

RSUPPLY

WHO IS RESPONSIBLE FOR MONITORING, PROPERLY CORRECTING, AND PURGING OF BOTH THE OUTGOING AND INCOMING INTERFACE FILES?

SAA

STOREKEEPER ASSIGNED TO DUTIES AS THE NALCOMIS SAA WILL BE WHAT RANK OR ABOVE WHO HOLDS NEC 8015?

E5

IF NALCOMIS IS OFF-LINE FOR A SIGNIFICANT PERIOD OF TIME ( MORE THAN HOW LONG), THE ASD MUST PROCESS ALL DEMANDS ( REPAIRABLE AND CONSUMABLE) IN A MANUAL MODE?

ONE HOUR

TICKLER COPIES OF ALL DOCUMENTS IN PROCESS WILL BE MAINTAINED WHERE TO CONTROL AND ACCOUNT FOR ANY OFF-LINE PROCESSING OF MATERIAL REQUIREMENTS?

SRS

ALL AVIATION RELATED REQUIREMENTS MUST ORIGINATE IN WHERE?

O-IMA

ALL AOM CONSUMABLE REQUIREMENTS MUST BE SUBMITTED THROUGH WHAT?

NALCOMIS

ALL MAILBOXES MUST BE REVIEWED AND WORKED IN ACCORDANCE WITH IPG TIME FRAMES. THERE SHOULD BE NOTHING OVER HOW OLD IN MAILBOX?

24 HOURS

WHICH FILE WILL CONTAIN OUTGOING STOCK REQUISITIONS AND NALCOMIS GENERATED FOLLOW-UPS?

EXTERNAL

WHICH FILE WILL CONTAIN ALL OUTGOING RECORDS AWAITING A MATCH FROM RSUPPLY?

INTERNAL

NALCOMIS OUTGOING INTERFACE RECORDS ARE TRANSMITTED ELECTRONICALLY TO WHAT?

RSUPPLY

ALL ITEMS ON THE NALCOMIS SUSPENSE LIST SHALL BE REVIEWED HOW OFTEN BY THE RMB SUPERVISOR AND RECORDS CORRECTED AS REQUIRED TO PREVENT POSSIBLE INVENTORY DISCREPANCIES?

DAILY

A GOAL OF HOW MANY DAYS IS ESTABLISHED AS THE MAXIMUM TIME ALLOWED TO CLEAR S-6 RELATED TRANSACTIONS FROM RSUPPLY SUSPENDED TRANSACTION LISTINGS?

FOUR DAYS

WHAT WILL REPLACE EVERY NALCOMIS AT CODE AND LOCATION DATA WITH MASTER RECORD DATA CONTAINED IN RSUPPLY?

RECORD BLANKING

WHAT ARE DESIGNED TO RESOLVE DATABASE DISCREPANCIES NORMALLY CAUSED BY APPLICATION SOFTWARE INACCURACIES OR DATA ENTRY ERRORS MADE BY USERS?

DATA ALIGNMENT PROGRAMS (DAPs)

WHAT REPORTS PROVIDE BOTH SUPPLY AND MAINTENANCE MANAGERS WITH VALUABLE INFORMATION TO GAUGE PERFORMANCE, INCREASE READINESS AND MAINTAIN INVENTORY ACCURACY THROUGHOUT THE OPERATIONAL CYCLE?

NALCOMIS MANAGEMENT REPORTS

POOL CRITICAL QUANTITY EQUALS WHAT PERCENTAGE OF ON-HAND QUANTITY COMPARED TO AUTHORIZED ALLOWANCE OF ONE EACH, WHICHEVER IS GREATER?

25%

RUNNING WHAT REPORT WEEKLY FOR ALL REPAIRABLE ASSETS PROVIDES MANAGEMENT WITH A PERIODIC STATUS OF RANGE AND DEPTH DISCREPANCIES?

REPAIRABLE STOCK REQUISITION STATUS REPORT (RSRSR)