What are the 4 Principles of ORM?
|
-Accept risk when benefits outweigh costs.
-Accept no unnecessary risk. -Anticipate and manage risk by planning. -Make risk decisions at right level. |
|
What are the 5 steps in the ORM process?
|
1. Identify Hazards
2.Assess Hazards 3.Make Risk Decisions 4.Implement Controls 5.Supervise |
|
What is hazard severity?
|
an assessment of the worst credible consequnce that can occur as result of a hazard.
|
|
How is a hazard severity categorized or graded?
|
Roman Numeral 1-4
I-death II-severe injury III- minor injury IV- minimal threat |
|
what is mishap probability?
|
the probability that a hazard will result ina mishap or loss.
|
|
How is the category of probability graded or determined?
|
Subcategories A-D
A-likely to occur B-occur in time C-may occur D-unlikely to occur |
|
what is the risk assessment matrix?
|
chart used to identify the RAC(Risk Assessment Code)
|
|
What are the RAC definitions(code)?
|
1 is considered a Critical Risk.
2 is considered a Serious Risk. 3 is considered a Moderate Risk. 4 is considered a Minor Risk. 5 is considered a Negligible Risk. |
|
What is ORM?
|
A process used to minimize risk to acceptable levels in a variety of situations.
|
|
During which step would you use certain measures to attempt to reduce the degree of risk?
|
implement controls- you use measures to attempt to reduce the degree of risk.
|
|
During which step would you monitor the work/activity to ensure it is carried out as planned and continually reassess the hazards and the controls?
|
supervise- the work/activity to ensure it is carried out as planned and continually reassess the hazards and the controls.
|
|
During which step would you identify conditions that may impede or degrade mission accomplishment?
|
first step, you identify the hazards that may impede or degrade mission accomplishment.
|
|
During which step would you determine a hazard's impact on the mission?
|
assess hazards- the impact on the hazards could have on the mission.
|
|
What is Risk?
|
Risk is expressed in terms of severity and probability of possible loss or mission degradation due to a hazard.
|
|
What is Severity?
|
describes the extent of mission degradation because the hazard produced a mishap, mission delay or stoppage.
|
|
what is probability?
|
Likelihoohd that the hazard will produce a mishap, mission delay or stoppage
|
|
What is residual risk?
|
risk remaining after controls have been identified and selected.
|
|
What are administrative controls?
|
controls that reduce risks through specific administrative acrions... warnings signs, notices.
|
|
what is Time Critical?
|
doing ORM on your mind, when a situation pops up and you have to make a decicsion.
|
|
How are each threat assessed?
|
by probability and severity.
|
|
What is the METT-T?
|
model that can be used for conducting a situation anaysis by breaking it int ffive general areas; Mission, Enemy, Terrain, Troops,- Time`
|
|
What is the 5-M model?
|
It provides and alternatice framework for conducting mission analysis:
Man, Machine, Media, Management, Mission |