• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/36

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

36 Cards in this Set

  • Front
  • Back
What is...

COSAL
Coordinated Shipboard/Shorebased Alloance List

- lists required equipment, maintenance parts for unit to be self-sufficient for 90 days or 1800 construction hours
What is...

OPTAR
NMCB OPTARs are funded by 1NCD through 30NCR. Our OPTAR has four codes:

01- Consumables and Services
02- Maintenance Repair Parts (CESE)
03- Travel
04- Training

Requisition Log records: 01, 02, 04
Travel Log records: 03
What is...

HMR
Hazardous Material Reutilization

Allows unused HM to be stored and reissued for future use.
What is...

DRMO
Defense Reutilization Marketing Office

Disposes of or recycles items that w/ or w/o need inventory manager disposal authority, and scrap/waste.
What is...

MOV
Material Obligation Validation program

Ensures that there isn't too much overage material, and cancels material orders no longer needed.
What is...

Minor Property
Navy owned property that costs between $300-5,000, or that costs more than $5,000 and has a shelf life of less than 2 years.

"also, regardless of cost, all classified, sensitive, or highly-pilferable equipment is considered minor property."
What is...

UMMIPS
Uniform
Material
Movement
Issue
Priority
System
How does...

Money get refunded?
When the wrong material or part is ordered the money goes back to the TYCOM (NECC). The unit only gets the money back by requesting additional funds from the TYCOM at the end of the FY or FQ.
What is...

Plant Property
Bought for immediate use and costs more than $5,000:

Class 3 - useful life > 2 years
Class 4 - Industrial, property used for the purpose of cutting, abrading, etc otherwise altering the physical, electrical or chemical properties of materials compounds or end items
What is...

a BM
Project Bill of Materials
What is...

ACR
Allowance Change Request

(NAVSUP 1220-2)
An ACR is used to chang the quantity of an allowance list. Typical reasons include material failure rates, new operating areas, or conditions, etc.
What is...

a QDR
Quality deficency Report

SF 368
Documents problems with quality of the product due to design flaw, I) causes death or serious injury, II) all other.
What is...

a ROD
Report of Discrepancy

SF 364
Used to record shipping or packing discrepancies (to wrong activity/CMD, unacceptable substitutes, or wrong product, etc)
What is...

MPP
Master Packing Plan

Prepacked and containereized TOA IOT mount-out in contingency response.
What is...

TAP
TOA-as-Packed

Inventory of the TOA container
What are...

the Capabilities and Functions of the MPF
Maritime Preposition Force

Reinforces amphibious ops, occupies/reinforces advanced naval bases, and allies, establishes sizable force ashore in support of ops, augments fleet defense ashore, rapid response for MOOTW in peacetime.
What are...

the MPSRON locations and ships
MPSRON I - Mediterranean, 8 ships
MPSRON II - Diego Garcia, 5 ships
MPSRON III - Guam/Saipan, 6 ships

19 ships total
What is...

the support size/time of an MPSRON
Combat equipment and sustaining supplies for MAGTF of 17,000 personnel for 30 days.
What are...

the phases of MPF Operations
1) Planning
2) Marshalling
3) Movement
4) Arrival and Assembly
What are...

the 5 movement groups for MPF ops
1) SLRP
2) OPP
3) AP
4) MB
5) Flight Ferry
What are...

the four new P25S modules
1) Fly In Module
2) Core Module
3) Basic Module
4) Heavy Module

(Basic & Heavy Modules also contain Core Module)
What is....

the form NAVSUP 1250-1
used for
Requisitino/consumption reporting used by subs and non-automated units
What is....

the form NAVSUP 1250-2
used for
Requisition/consumption reporting document used for non-NSN material
What is....

the form NAVSUP 1149
used for
Requisition invoice/shipping document used for open purchase items or services
What is....

the form DD 1348
used for
Requisition form serves as a requisition follow-up, modifier, or cancellation request
What is....

the form DD 200
used for
Survey form, and reports lost, stolen or damaged items
What is...

the oulet ARP
Automotive Repair Parts

Handles repair parts for CESE and MHE. Operates in Alfa Co, but records maintained in Supply.
What is...

the oulet CTR
Central Tool Room

Manages all hand, power, and special tools, and tradesman tool kits. Usually kept secure.
What is...

the oulet CSR
Central Store Room

Central shipping, and recieving outlet for non-project related shipments (admin and consumable items)
What is...

the oulet MLO
Material Liaison Office

Manages all project funds and materials IAW NAVSUP P-48. Recieve, issue, and inventory project material. Maintain record and accounting, submits report of expenditures for project materials at the mainbody.
- Dets manage their own
- SuppO ultimately responsible for all sites
What is...

NSN
National Stock Number
What is...

APL
Allowance Parts List
What is...

APL
Allowance Parts List
What is...

AEL
Allowance Equipage List
What is...

NC
Not Carried
What is...

NIS
Not in Stock