Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
36 Cards in this Set
- Front
- Back
What is...
COSAL |
Coordinated Shipboard/Shorebased Alloance List
- lists required equipment, maintenance parts for unit to be self-sufficient for 90 days or 1800 construction hours |
|
What is...
OPTAR |
NMCB OPTARs are funded by 1NCD through 30NCR. Our OPTAR has four codes:
01- Consumables and Services 02- Maintenance Repair Parts (CESE) 03- Travel 04- Training Requisition Log records: 01, 02, 04 Travel Log records: 03 |
|
What is...
HMR |
Hazardous Material Reutilization
Allows unused HM to be stored and reissued for future use. |
|
What is...
DRMO |
Defense Reutilization Marketing Office
Disposes of or recycles items that w/ or w/o need inventory manager disposal authority, and scrap/waste. |
|
What is...
MOV |
Material Obligation Validation program
Ensures that there isn't too much overage material, and cancels material orders no longer needed. |
|
What is...
Minor Property |
Navy owned property that costs between $300-5,000, or that costs more than $5,000 and has a shelf life of less than 2 years.
"also, regardless of cost, all classified, sensitive, or highly-pilferable equipment is considered minor property." |
|
What is...
UMMIPS |
Uniform
Material Movement Issue Priority System |
|
How does...
Money get refunded? |
When the wrong material or part is ordered the money goes back to the TYCOM (NECC). The unit only gets the money back by requesting additional funds from the TYCOM at the end of the FY or FQ.
|
|
What is...
Plant Property |
Bought for immediate use and costs more than $5,000:
Class 3 - useful life > 2 years Class 4 - Industrial, property used for the purpose of cutting, abrading, etc otherwise altering the physical, electrical or chemical properties of materials compounds or end items |
|
What is...
a BM |
Project Bill of Materials
|
|
What is...
ACR |
Allowance Change Request
(NAVSUP 1220-2) An ACR is used to chang the quantity of an allowance list. Typical reasons include material failure rates, new operating areas, or conditions, etc. |
|
What is...
a QDR |
Quality deficency Report
SF 368 Documents problems with quality of the product due to design flaw, I) causes death or serious injury, II) all other. |
|
What is...
a ROD |
Report of Discrepancy
SF 364 Used to record shipping or packing discrepancies (to wrong activity/CMD, unacceptable substitutes, or wrong product, etc) |
|
What is...
MPP |
Master Packing Plan
Prepacked and containereized TOA IOT mount-out in contingency response. |
|
What is...
TAP |
TOA-as-Packed
Inventory of the TOA container |
|
What are...
the Capabilities and Functions of the MPF |
Maritime Preposition Force
Reinforces amphibious ops, occupies/reinforces advanced naval bases, and allies, establishes sizable force ashore in support of ops, augments fleet defense ashore, rapid response for MOOTW in peacetime. |
|
What are...
the MPSRON locations and ships |
MPSRON I - Mediterranean, 8 ships
MPSRON II - Diego Garcia, 5 ships MPSRON III - Guam/Saipan, 6 ships 19 ships total |
|
What is...
the support size/time of an MPSRON |
Combat equipment and sustaining supplies for MAGTF of 17,000 personnel for 30 days.
|
|
What are...
the phases of MPF Operations |
1) Planning
2) Marshalling 3) Movement 4) Arrival and Assembly |
|
What are...
the 5 movement groups for MPF ops |
1) SLRP
2) OPP 3) AP 4) MB 5) Flight Ferry |
|
What are...
the four new P25S modules |
1) Fly In Module
2) Core Module 3) Basic Module 4) Heavy Module (Basic & Heavy Modules also contain Core Module) |
|
What is....
the form NAVSUP 1250-1 used for |
Requisitino/consumption reporting used by subs and non-automated units
|
|
What is....
the form NAVSUP 1250-2 used for |
Requisition/consumption reporting document used for non-NSN material
|
|
What is....
the form NAVSUP 1149 used for |
Requisition invoice/shipping document used for open purchase items or services
|
|
What is....
the form DD 1348 used for |
Requisition form serves as a requisition follow-up, modifier, or cancellation request
|
|
What is....
the form DD 200 used for |
Survey form, and reports lost, stolen or damaged items
|
|
What is...
the oulet ARP |
Automotive Repair Parts
Handles repair parts for CESE and MHE. Operates in Alfa Co, but records maintained in Supply. |
|
What is...
the oulet CTR |
Central Tool Room
Manages all hand, power, and special tools, and tradesman tool kits. Usually kept secure. |
|
What is...
the oulet CSR |
Central Store Room
Central shipping, and recieving outlet for non-project related shipments (admin and consumable items) |
|
What is...
the oulet MLO |
Material Liaison Office
Manages all project funds and materials IAW NAVSUP P-48. Recieve, issue, and inventory project material. Maintain record and accounting, submits report of expenditures for project materials at the mainbody. - Dets manage their own - SuppO ultimately responsible for all sites |
|
What is...
NSN |
National Stock Number
|
|
What is...
APL |
Allowance Parts List
|
|
What is...
APL |
Allowance Parts List
|
|
What is...
AEL |
Allowance Equipage List
|
|
What is...
NC |
Not Carried
|
|
What is...
NIS |
Not in Stock
|