• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/17

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

17 Cards in this Set

  • Front
  • Back
What must a WO requiring FCF and FCF "A" sheets have annotated on them?
"FCF" in red (stamp)
What block must be checked on WO requirng FCF?
The "Check Flight" block
Who must attend the FCF brief?
Pilot, FE, Observer (All Applicable Aircrew), QA, WC Supervisor, and MC.
How will items outside of tolerance on the FCF checklist be annotated?
Clearly mark with unsatisfactory with an "X" in the block. Corresponding JCN will be annotated on the last page of the deck. FCF pilot signs ONLY that the FCF checklist is complete.
If an FCF is aborted and the flight cancelled, how will the checklist be marked?
The pilot draws a line across the page below the last step performed and signing above the linewith name and date. The same check list can be reissued to complete the rest of the steps.
What is FCF profile "A"?
R&R of engine or reduction gear assembly.
What is FCF profile "B"?
R&R of a fuel control, coordinator, or re-rigging of mechanical linkage.
What is FCF profile "C"?
R&R of a prop or valve housing
What is FCF profile "D"?
Movable flight surfaces or flight control system components.
What is FCF profile "E"?
Aircraft acceptance. R&R of two attitude sources. Nav J card 106 & 107.
What is FCF "F"?
30 Day No Fly
What must happen before a cannibalization action is authorized?
A valid requisition is placed in the supply system and the required material is not available.
What items require TYCOM approval prior to cannibalization?
1. All "out of reporting" cann actions.
2. Cann between TYCOMs.
3. Cann from any aircraft that has been NMC in excess of 120 days
What cann actions require CPRG/CPRGP approval?
1. Endorsement of all cann request to TYCOM.
2. Cann between CPRWs and CTFs.
What cann actions require CPRW/CTF approval?
1. Cann between squadronsin same CPRW/CTF.
2. Major Hyd system components.
3. CADs
4. Fire Extinguisher system components.
5. O2 system components.
6. Engine/Props
Who must authorize cannibalization from an engine (supply asset)?
Local Supply Department, I-level FRC, and Wing Maintenance Department.
What administrative items need to be accomplished for each cannibalization action performed?
1. Document all turn-in documents, reqs, WO/MAFs, OOMA Log Sets and EHR, SRC, ASR and MSR cards as applicable.
2. Initiate the cannibalization wizard in OOMA or a cann MAF and transfer the document numbers via supply.
3. Ensure requisitions are transferred accordingly in AMSRR.
4. Add the Cann Log to CPRG Sharepoint by 1200 EST on the first working day of the month to Group.