Study your flashcards anywhere!

Download the official Cram app for free >

  • Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

How to study your flashcards.

Right/Left arrow keys: Navigate between flashcards.right arrow keyleft arrow key

Up/Down arrow keys: Flip the card between the front and back.down keyup key

H key: Show hint (3rd side).h key

A key: Read text to speech.a key

image

Play button

image

Play button

image

Progress

1/5

Click to flip

5 Cards in this Set

  • Front
  • Back
Staking out
Corners of the building are roughly situated and marked on the property with small stakes around the corners of the building's foundation
How is the precise location of the building on the site established?
By using a batter board system
Septic Test Pit
Dug and inspected by a government agency before a septic permit is issued. Determines the soil type, the level of the water table, and the rate of water absorption based on a percolation test.
Percolation test
Rate of water absorption
Two-chambered dosing tank
Raw sewage from the house enters the first chamber