Staking out
|
Corners of the building are roughly situated and marked on the property with small stakes around the corners of the building's foundation
|
|
How is the precise location of the building on the site established?
|
By using a batter board system
|
|
Septic Test Pit
|
Dug and inspected by a government agency before a septic permit is issued. Determines the soil type, the level of the water table, and the rate of water absorption based on a percolation test.
|
|
Percolation test
|
Rate of water absorption
|
|
Two-chambered dosing tank
|
Raw sewage from the house enters the first chamber
|