• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/40

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

40 Cards in this Set

  • Front
  • Back
define rise
deck or overhead to center of damage
define uncorrected run
bulkhead to anchor point
define corrected run
compensates for the thickness of wedge, strongbacks, ect
define shole
a flat plate used under strongbacks to distribute pressure over the damage
what are the two purposes of a strong back?
distribute pressure and serve as a anchor point
the maximum length of a wood shore is ___ times the minimum butt thickness
30
what are the 2 lengths of the steel shoring
3-5 & 6-11
what is the maximum weight the short steel shoring will hold when fully extended? when closed?
12,000 lbs , 20,00 lbs
what is the maximum weight the long steel shoring will hold when fully extended? when closed?
6,000 lbs , 20,000 lbs
what are two ways of measuring for K-type shoring?
measuring batten/shoring batten , carpenter square
what is another name for I-type shoring
direct compression
what is another name for H-type shoring
cross-exial
what is another name for K-type shoring
triangulation
equipment shall be stored "first in, ___ out."
last
PECU stands for
Portable Exothermic Cutting Unit
PECU cuts at approximately ____ degrees Fahrenheit
10,000
The PECU regulator is preset at ____ psi
60
PECU cutting rods come in what two sizes
1/4 & 3/8
How is the PEARS powered
12-volt batter Pack
fire compartment doors shall remain ___ during initial response to maintain breathable atmosphere for unprotected initial responders
open
what are the 5 steps for attacking a fire
size up, attack, isolate, protect exposed compartments, set fire and smoke boundaries
how many people must man a 1 1/2 inch fire hose during sustained firefighting
3 personal
how many people must man a 2 1/2 inch fire hose during sustained firefighting
4-5 personal
what are the 3 ways to control a wild hose
shut off water flow, z kink, advance along the hose
when using an in-line AFFF eductor, you should use a ___ GPS nozzle with the bail in ____ position
95 , Full Open
any ___ barrier can be a fire boundary
physical
the minimum degree of tightness for a secondary fire boundary is _____
Fume Tight
secondary boundaries are generally set at ____ subdivision or ____ boundary
watertight , airtight
boundaries ___ the fire shall be set as quickly as possible
above
define smoke control zone
the area between the inner and outer smoke boundaries
smoke boundaries can be set by closing doors and hatches, or by using ___ and ____
smoke curtains , smoke blankets
what are the 4 types of ventilation
general , supply , exhaust , natural
before using air moving devices, you must first get permission from
Cheng
box fan is rated at ___ CFM
3200
box fan is powered by __ volts AC
115
the ram fan is rated at __ CFM
2000
the ram fan is powered by
fire main
exhaust fans/blowers shall be located on the ___ decks
weather
who determined the need for active desmoking
repair party leader
what are the 7 considerations in selecting a fan
potential explosive of fire hazard, space available, operating temp., effing ect