• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/30

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

30 Cards in this Set

  • Front
  • Back

3 group of activities

Improvised activities


Routine activities


Project-based activities

Not according to a laid out plan, but decided on as events unfold

Ad hoc

Activities that are repeated frequently and are relatively predictable

Routine

Order in which work is done, laid out instructions

Work procedure

A project gets split up into various ...

Phases

Features of a project

limited duration


defined goal


has a sponsor


has a budget


consists of people from various fields



Projects are never ...

Spontaneous

4 types of projects

Technical projects

Social projects


Commercial projects


Mixed projects



Projects can generally be subdivided into these phases (simple division)

Preparation (think)

Realization (act)


Aftercare (maintain)

Projects can generally be subdivided into these phases (in-depth division)

Concept phase


Definition phase


Design phase


Preparation phase


Realization phase


Aftercare phase

Reason for doing a project in phases

number of opportunities for decision making

Final stage of a project is also referred to as ...

Utilization phase

Projects should be SMART

Specific


Measurable


Acceptable


Realistic


Time-bound

Committee formed when several related projects take place simultaneously.Consists of sponsors representatives

Steering committee

Connection between project, steering committee and then finally the board of directors

Linking pin

Contracting tasks that are not part of the core business of the company

Outsourcing

A study conducted to check the success rate of the project

Feasibility study

With the findings of the feasibility decision a ... is made

Go/ no-go decision

Five monitoring aspects of a project

Time

Money


Quality


Information


Organization


A diagram that includes all departments within an organization and the balance of power between them

Organizational chart

All interested parties in a project are called

Stakeholders

The people who will carry out the activity plus the tools necessary to do so

Resources

A project is successful when ...

has achieved its objective and is of desired quality


concluded in time


has not cost more than was agreed on

risk forumla=

probability of occurance times consequence for project

4 things to remember when doing a project

-Request planning time from the sponsor


-Consult everyone involved


-Work from the top down


-Thinking things through: from start to finish and from finish to start

Before writing a project plan the project manager should: ...

-have a number of interviews with the sponsor


-consultations and interviews with experts of all parties involved


-collection & examination of documents

5 main monitoring aspects of a project

TMQIO


-Time


-Money


-Quality


-Information


-Organization

Those with an interest in the final result of a project

Stakeholders

Everything carried out as part of the project is called the

Scope

Product proposal is done in what phase?

Concept phase