• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/6

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

6 Cards in this Set

  • Front
  • Back
Quality Planning
involves determining with the client what the expectations are concerning design, cost and other aspects of the project
Monitoring
Keeping track of the progress of the job to make sure everything is going as planned (time, fee, quality)
Contents of a project notebook
Reference, Contracts, Fees and schedules, programming, budget, job communication, construction administration, closeout and follow up
CPM Chart
is a graphic representation of the project's timeline, each point represented by a numbered circle
is a graphic representation of the project's timeline, each point represented by a numbered circle
PERT Chart
Graphic representation of a project's timeline
Graphic representation of a project's timeline
GANTT chart
Most common scheduling chart
Most common scheduling chart