• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/15

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

15 Cards in this Set

  • Front
  • Back
What are activities?
tasks used to show the flow of a project
What is a work breakdown stucture (WBS)?
model of a project
List the different activity types.
internal, external, external with service and cost.
What transactions can post actual costs to a project?
internal activity allocation, direct process allocation, confirmations, goods issue, goods receipt, invoice
Can a budget be assigned to a Network/Activity?
No, only to a WBS
T/F: A notification is needed to create a plant maintenance order.
False
T/F: Within a notification you can view the costs for repairing the piece of equipment.
False, order
T/F: A plant maintenance order contains tasks and activities for repairing equipment.
True
T/F: A functional location is an organizational level used to EAM.
False, technical object
T/F: The construction type identifies the type of functional location that a piece of equipment can be assigned to.
False, material
A bill of materials is a technical object. T/F?
True
Confirmations are posted to notifications. T/F?
False, order
What two documents are generated as results of using resource related billing?
Billing request and billing document
List the technical objects within project management.
functional location, BOM, equipment
Results of a confirmation.
actual times/costs are updated, co doc is created, and measurements and readings are recorded