Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/15

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

15 Cards in this Set

  • Front
  • Back
  • 3rd side (hint)
Category II nonfriable ACM means any material except Category I nonfriable ACM.
A. True
B. False
A. True
Notification to NESHAP for demolition or renovation is required when removing less than 160 square feet of RACM.
A. True
B. False
A. True
RACM doesn’t need to be removed during demolition if:
A. It was not accessible for testing
B. The material cannot be safely removed
C. A and B
D. Neither A nor B
C. A and B
It is a requirement that at least one management-level person be trained in the NESHAP regulations and be present on site during RACM disturbance.
A. True
B. False
A. True
Category II nonfriable ACM with a low probability that the materials will become crumbled, pulverized, or reduced to powder during demolition must be removed prior to demolition.
A. True
B. False
B. False
Leak-tight also means dust-tight.
A. True
B. False
A. True
Wrecking, or taking out, any load-supporting structural member is considered demolition.
A. True
B. False
A. True
A ship is considered a:
A. Large boat
B. Industrial unit
C. Facility
D. None of the above
C. Facility
If a facility is demolished by intentional burning, all RACM including Category I and Category II nonfriable ACM must be removed in accordance with the NESHAP before burning.
A. True
B. False
A. True
Facility component means any part of a facility excluding equipment.
A. True
B. False, it includes equipment
B. False, it includes equipment
Any building, structure, or installation that contains a loft used as a dwelling is not considered a residential structure, installation, or building.
A. True
B. False
A. True
Waste generator means any owner or operator of a source whose act or process produces asbestos-containing waste material.
A. True
B. False
A. True
Notification to NESHAP for demolition or renovation is not required when removing less than 35 cubic feet of RACM.
A. True
B. False
B. False
Demolition or renovation activities can begin before all of the asbestos is removed.
A. True
B. False
A. True
When working on a two story 100 unit apartment complex, the bagged RACM can be:
A. Lowered to the floor or ground
B. Dropped to the lower floor or ground
C. Thrown down the stairs
D. All of the above
A. Lowered to the floor or ground