Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
15 Cards in this Set
- Front
- Back
- 3rd side (hint)
What does ACWM mean?
|
A. A Cool Winter Morning
B. Asbestos Containing Water Melon C. Asbestos Containing Waste Material D. Asbestos Containing Wet Material |
C. Asbestos Containing Waste Material
|
|
Cutting means to penetrate with a sharp-edged instrument and excludes sawing.
|
A. True
B. False |
B. False
|
|
A facility includes:
|
A. Active waste disposal sites
B. Inactive waste disposal sites C. Radioactive waste facilities D. A and B |
D. A and B
|
|
A sealed compartment with attached inner gloves used for the handling of asbestos containing materials is called a:
|
A. Asbestos compartment
B. Glove bag C. Inner glove unit D. ACM container |
B. Glove bag
|
|
A group of buildings at a single demolition site under the control of the same owner or operator is called a:
|
A. Group
B. Installation C. Demolition site D. Facility |
B. Installation
|
|
You cannot know when equipment is going to break down and therefore you are not required to have a back up negative air machine in case another one malfunctions.
|
A. True
B. False |
B. False
|
|
Is stripping or removing RACM from a facility component considered a renovation?
|
A. Yes
B. No |
A. Yes
|
|
What is a “working day”?
|
A. Monday through Friday only
B. Monday through Friday including holidays falling on any day Monday through Friday C. Every day of the week when work is performed D. A day when work is performed for at least 8 hours |
B. Monday through Friday including holidays falling on any day Monday through Friday
|
|
Renovation or demolition update notifications to NESHAP are required when the amount of asbestos affected changes by at least:
|
A. 10%
B. 20% C. 45% D. 70% |
B. 20%
|
|
When RACM is stripped from a facility component while it remains in place in the facility:
|
A. It is not required to keep it wet
B. Adequately wet the RACM during the stripping operation C. Use amended water sparingly D. Adequately wet the RACM after the ACM is removed |
B. Adequately wet the RACM during the stripping operation
|
|
When the temperature is too low to allow wetting procedures, the temperature must be measured during the day and the records of the temperature kept at the jobsite.
|
A. True
B. False |
A. True
|
|
NESHAP rules say: Discharge no visible emissions to the outside air...or use one of the emission control methods.
|
A. True
B. False |
A. True
|
|
Asbestos-containing floor tile, asphalt tile, vinyl floor tile and sheet vinyl floor covering containing more than 1% asbestos is called:
|
A. Resilient Floor Covering
B. Vinyl Acetate Tiles C. Vinyl Chloride Tiles D. Tiles |
A. Resilient Floor Covering
|
|
“Outside air” means air:
|
A. Outside buildings and structures
B. Outside of a containment C. Outside of a containment but inside the building D. Under a bridge or in an open air ferry dock E. A and D |
E. A and D
|
|
“In poor condition” means the binding of the material is losing its integrity as indicated by:
|
A. Peeling
B. Cracking C. Crumbling D. All of the above |
D. All of the above
|