• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/86

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

86 Cards in this Set

  • Front
  • Back
  • 3rd side (hint)

When responding to real-time emergencies, plans for operator controlled load shedding are held by...

Transmission Operator (TOP) OR Balancing Authority (BA)

NERC EOP-003

The Transmission Operator (TOP) and Balancing Authority (BA) shall review and update its emergency plans...

Annually [and provide a copy to neighboring RCs, TOPs, and BAs.]

EOP-001, R5

Restoration plans have to be tested through exercise or simulation, at least every _____ years.
5

Voltage reduction relief on the transmission system is acceptable only when...

when the system is islanded, or separated from the interconnection

TOP-001

The Transmission Operator (TOP) shall have an emergency load reduction plan for all identified ______ violations

IROL (Interconnection Reliability Operating Limit)

TOP-007

Transmission Operators (TOP) shall return the transmission system to within the IROL ASAP, but no longer than...

30 Minutes

TOP-007

NERC and DOE require a report when the shedding of ______ MW or more of firm load to maintain the continuity of the bulk electric system.

100

EOP-004

If a Transmission Operator (TOP) enters an unknown operating state, within ____ minutes they need to restore operations to proven reliable power system limits .

30

TOP-004

A 1% drop in frequency will generally result in a ___ drop in load

2%


A disturbance greater than or equal to ____ of the Balancing Authority or Reserve Sharing Group's largest single Contingency would be a reportable disturbance per NERC DCS criteria.

80%

BAL-002

What is a Power Transfer Distribution Factor?

A measure of the responsiveness or change in electrical loading used for pre- contingency analysis


Governor droop accomplishes...

frequency regulation amongst all generators on the electric grid without frequency oscillations


Each Reliability Coordinator operator shall complete a minimum of ____ days of realistic emergency situation training simulation each year

5

PER-004

Multiple contingencies occurring within ___ minute(s) of each other shall be counted as a single contingency

1


When it comes to systems with long transmission lines that connect remote generation to load centers, it is much more likely to see IROL and SOL violations as a result of...

Angle stability limitations. This is due to the large power angles necessary to more power from the generator all the way to the load.

TOP-004

What are 3 techniques that a system operator has to address a System Operating Limit (SOL) and/or an Interconnection Operating Limit (IROL)?

- Re-dispatch generation


- Reduce Interchange


- Shed Load




The lower the governor droop percentage, the ( More / less ) the generator unit will respond to a frequency deviation

more


The most important consideration in the load forecasting process is...

the forecasted Weather.


If a Generator Operator (GOP) is experiencing mechanical or electrical problems that limit or remove their ability to provide reactive resources, they shall inform the...

Transmission Operator (TOP)

VAR-001

This can cause significant low frequency induced currents can enter the system through grounded transformer neutrals, potentially causing system overloads and harmful system-wide harmonics.

Geo-magnetic Disturbance (GMD)



When issuing a directive, System Operators must use...

Three-Part Communication

COM-002

When a transmission line becomes loaded above its SIL (Surge Impedence Limit), the line becomes (1)________ and the voltage (2)______.

(1) more inductive


(2) drops


Neighboring systems of an interconnected network should use ______________ when referring to transmission lines

uniform line identifiers and ratings


The Transmission Operator (TO) and Balancing Authority (BA) shall provide a copy of all emergency operations plans to its ...

Neighboring Transmission Operator (TO), Neighboring Balancing Authority (BA), and Reliability Coordinator.


The entity that Makes the original determination that an EEA event is occurring to the Reliability Coordinator is...

the Balancing Authority


Only the _____________ is allowed to declare an EEA event.

Reliability Coordinator

A top priority of the system operator during system restoration is....

restoration of offsite startup power to generating facilities (to avoid damage to the generator)


In an island condition, an operator would have to shed ___% to ___% of load compensate for a 1 Hz frequency deviation.

6% to 10%

EOP-003

EEA 3 is when...

Firm load interruption is imminent or in progress

EOP-002

EEA 2 is...

When Load Management Procedures are in effect

EOP-002

EEA 1 is...

All available resources are in use (and concerned about sustaining the required Operating Reserves)


For every 1% change in frequency, load will change...

Approx. 2% in the same direction


When a Reliability Coordinator directs a Balancing Authority to modify an existing Interchange schedule for a reliability related reason, who is responsible for submitting the modified Arranged Interchange and how long do they have to complete this?

The Balancing Authority, and within 60 minutes.

INT-010

During a sabotage event, the notification of government and regulatory bodies, as well as other appropriate agencies, shall be the responsibility of...

Reliability Coordinators, Balancing Authorities, Transmission Operators, Generator Operators, or Load Serving Entities

CIP-001

What is the primary Cause of low voltages on the BES?

Significant VAR losses associated with heavy power transfers


The algebraic Sum of active power (Mw) and reactive power (MVAR) is...

Apparent Power (MVA)


When can the Transmission Operator disconnect from the interconnection?

When their system is in imminent danger of violating an IROL or SOL

TOP-004

A relay used primarily for power system equipment protection (not line protection).

Differential relays (87)

PRC-005

Protective device that Calculates the impedance of the line by measuring the voltage and Current of the line; fault causes the current to rise and Voltage to drop, showing a drop in impedance

Distance Relay ( 21 )


UVLS schemes are designed to drop load in...

Pre-selected blocks

EOP-003


EOP-003

Time Error Correction Can be done two ways: An offset of frequency of (1)____ Hz or by offsetting its (2)_________ by an amount equal to the computed bias contribution during a frequency deviation equal to (1).

(1) 0.02


(2) Net Interchange Schedule


The default Contingency Reserve Restoration Period is...

90 minutes (which begins at the end of the Disturbance Recovery Period


The Frequency Response Characteristic (FRC) of, lets say, 1000MW/0.1Hz Measures how much generation will increase and/or load will decrease. Therefore, no matter how it is presented, it is mathematically (positive/negative)

Negative.


It may be presented either way, but it needs to be calculated as a negative number.


Each Balancing Authority shall operate its Automatic Generation Control (AGC) on _________________ unless such operation is adverse to system or Interconnection reliability.

Tie Line Frequency Bias


A Balancing Authority must notify its Reliability Coordinator if it is unable to calculate its ACE for more than...

30 minutes


The Balancing Authority shall ensure that data acquisition for and calculation of ACE will occur at least every...

6 seconds


Inadvertent Interchange is...

Equal to Net Actual Interchange minus Net Scheduled Interchange


Each BA shall review its Frequency Bias Setting by...

Jan. 1 of each year (OR once annually)


The Frequency Bias Setting for every 0.1 Hz change in frequency needs to be...

1% of the estimated yearly peak demand (for a BA serving native load) -OR- 1% of its estimated Maximum generation level (for a BA not serving native load)


Regulating reserves are used for.... (3 reasons)

• load forecasting errors


• system tie-line needs


• frequency regulation


Spinning and Non-Spinning Reserves are used for...

Contingency Reserves


Contingency Reserve

Reserved resources to meet generation needs in the event of generator or transmission forced outages and system disturbances


Contingency reserves can be supplied from...

• additional generation • Controllable load resources • Coordinated adjustments to Interchange Schedules


The Disturbance Recovery Period lasts _____ minutes

15 (per the Disturbance Control Standard, or DCS)


Generally, a 5% reduction in Voltage results in a ___% reduction in load

3%


When restoring load in an islanded system, it should be limited to blocks that are equal to ___% of the total online generator capacity.

5%



example: if there is 800MW of total capacity online, the power should be restored in blocks no greater than 40 MW


When restoring aad resynchronizing the interconnection, (high, low) voltage lines should be used because of their (high, low) impedance and (high, low) relay setting

high voltage lines


low impedance


high relay setting


Due to the importance of telemetered data, the System Operator needs to ensure the values are verified (Continuously, Every 10 minutes, Hourly, Daily).
Continuously

The Reliability Coordinator is required to comply with the Regional __________ Plan.



Regional Reliability Plan


When assessing the real-time performance and health of the Interconnection and Balancing Authority, the operator will look at the (a. ACE, Frequency) for the Balancing Authority and the (b. ACE, Frequency) for the Interconnection

a: ACE


b: Frequency


The ________ is responsible for resolving any outage scheduling of potential reliability conflicts.

Reliability Coordinator

An Operator must maintain (Spinning, Regulating, Black Start) Reserves for the Balancing Area to meet normal load fluctuations that occur on the system.

Regulating

If your system had a peak demand of equal to or greater than 3,000 MW last year, the loss of (50, 100, 200, 300) MW of firm load would require a report to be filed.

300 MW

Voltages should be held at ___% to ____% of Nominal during system restoration

90% to 110%


A system voltage reduction of ___% or more must be reported to NERC (as in the voltage is reduced by the operator, not to be confused with voltage excursions)
3%

NERC requires a report for voltage excursions of +/- (3, 5, 10)% for a time period more than (1, 5, 15, 30) minutes
+/-10% , 15 minutes

Black Start capabilities should be verified by (simulation, periodic testing, estimation)

Periodic testing

Synchroscopes are calibrated in units of (megawatts, volts, degrees, frequency)
degrees

In the Eastern and Western Interconnections, an event or contingency that creates a loss equal to or greater than (500, 1000, 2000, 5000) MW of generation requires a report per the NERC Event Reporing requirements.

2000 MW


Load Reduction plans have to be able to be implemented in ____ minutes.

30

Each Reliability Coordinator must be aware of the restoration plans for the _____________.
Transmission Operators

The Reliability Coordinator is required to perform a real-time assessment every _____ minutes.

30

The ____________ is responsible for confirming and implementing interchange schedules

Balancing Authority

When operating in Tie-Line Bias mode, the ________ is not needed for calculating ACE.

voltage


If the telemetry for several large generators have failed, data that represents (MVAR, load, MW) will be incorrect.

load

Open-ended transmission lines experience their highest voltages at the (open, closed, middle) end of the line due to the Ferranti Effect.

Open

If an event occurs on the Interconnection that causes a system frequency excursion, who is responsible for returning the frequency to normal

The Balancing Authority that caused the frequency excursion

The purpose of the generator reactive capability curve is to identify safe _____________ limits

thermal loading

Are shunt reactors a source or sink for reactive power?

They are a sink for reactive power


Frequency information should be gathered from (various, random, selected) locations and monitored in the control center

selected


Each SOL and/or IROL violation shall be reported to the regional Council and NERC Compliance Subcommittee within _______ of the event
72 hours

The (Source, Intermediate, Sink) Balancing Authority is responsible for the tagging of all bilateral inadvertent interchange payback

Sink

CPS1 is calculated every ____ minute(s) and CPS2 is calculated every ___ minute(s)

CPS1: every 1 minute


CPS2: every 10 minutes



Each Balancing Authority or Reserve Sharing Group must review its contingencies on a/an (quarterly, semiannual, annual, biannual) basis.

annual

Relay schemes should be designed so that automatic re-closing during _________ conditions does not occur.

out-of-step

Dynamic thermal ratings are ratings that limit transmission line loading based upon ...