18 Cards in this Set

  • Front
  • Back
  • 3rd side (hint)

Max fire hose length

23m

A.18 B. 20 C. 23 D. 25

Max distance between wet standpipes

58m

A. 45


B. 54


C. 58


D. 60

Fire wall extension under the eaves

0.30m

A. .30


B. .40


C. .50


D. .60

Maximum floors not requiring an elevator

4 flrs max, 5 flrs require an elevator

A. 3


B. 4


C. 5


D. 6

Max ht of a fence wall, otherwise, it shall be considered a fire wall

1.80m

A. 1.80


B. 2.40


C. 3.00


D. 3.20

Min frontage requirement of End lot

3.0 m

A. 1.8


B. 3.0


C. 4.0


D. 4.5

Max htvof firewall for R4 zoning classification

3 storeys

A. 3.2 m


B. 6.4 m


C. 3 storeys


D. 4 storeys

Max ht of separation walls or fences in quadruplexes, rowhouses, etc with adjacent courts having a min area of 3 sqm

2.0 m

A. 1.80


B. 2.00


C. 2.60


D. 3.20

Min nunber of storeys for a bldg to be reqd to have smokeproof enclosure

5

A. 3


B. 4


C. 5


D. 6


E. 7

__ involves separating the contract docs (such as bid docs, specs, const dwgs) into spearate packages to receive multiple bids for differet parts of the work to be constructed at diff times, usu. In the sequence of const

Sequential tendering

A. Multiple bid packages


B. Separate tendering


C. Partition tendering


D. Sequential tendering

The fee of the Arch for coordinating and relating the work of the Specialist Consultant (SC) to the design concept of the Architect shall be 5% of:



A. Proj Const Cost


B. Proj Dev't Cost


C. Architect's RPF


D. Consultant's RPF

5% of SC's fee

True or False


The Professional Advisor shall have no vote in the Archl Design Competition

True

There is no architect in the jury of a Design Competition.


True or False

False



It shall consist of a moajority of RLAs

If an Foreign Consultant is engaged in consultation for Council of the Built and Natural Environment (CBNE), a min of __ Filipino arch/s shall be employed.

2 Filipino Archs minimum

a.1 b.2 c.3 d.4

Long distance calls is under:


A. Reimbursable


B. Overhead

Reimbursable

Licenses, fees, taxes, special legal and acctng expenses shall be under:


A. Reimbursable


B. Overhead

Reimbursable

Depreciation allowances or rental of furniture , equipment, and instruments, are part of:


A. Reimbursable


B. Overhead

Overhead

Taxes and insurances other than those included as salary cost, are under:


A. Reimbursable


B. Overhead

Overhead