• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/119

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

119 Cards in this Set

  • Front
  • Back
ON the NSWC Training record, which side and where would you find...
(CNET GEN 1540/4 (Rev9-99) / NSWC 33-01 classroom)
(CNET GEN 1540/11 (Rev9-99) / NSWC 33-01 laboratory)
Section A / Left side
ON the NSWC Training record, which side and where would you find...
3 Initial Instructor Certification Evals?
Left side section A Tab A-1
2 evals to assess Technical knowledge
1 eval to assess technique by CISO or MTS
ON the NSWC Training record, which side and where would you find...
Monthly Eval Program
Section A Left side A-2
Minimum of once each month for 3 months
ON the NSWC Training record, which side and where would you find...
Quarterly Eval Program
left side A-3
minimum of once per quarter.
ON the NSWC Training record, which side and where would you find...
Copies of letters of Designation/ School Certs
Section B Left side
B-1
ON the NSWC Training record, which side and where would you find...
Copies of letters of Designation/ Relevant to COI
SEC B-1 Left Side
Driving Super, RSO, Jump Master ETC
Letters must be signed by CO of NSWC
ON the NSWC Training record, which side and where would you find...Copies of school certs current/ relevant to COI
Left side Sec B-2
Instructor training school, Curriculum Development school, Copy of Page 13 for attending NSWC/ High Risk Indoc Course, Page 13 for items 2,3, & 4 from Instructor cert page, Factory Schools, Etc.
ON the NSWC Training record, which side and where would you find...
Other training Certs Associated with Command or Professional Growth
Left side Sec C and C-1
CPR, EVOC, Leadership Training , First aid, Bus Driver etc.
ON the NSWC Training record, which side and where would you find...
ITR Training Rec Review Page
Right Side page 1
ON the NSWC Training record, which side and where would you find...
Cert and Qual pages
Section A Right side
ON the NSWC Training record, which side and where would you find...
Instructor Cert for High Risk Training Page
Section A-1 Right side
ON the NSWC Training record, which side and where would you find...
Lesson Topic or Evolution Cert Page
Section A-2 Right side
ON the NSWC Training record, which side and where would you find...
High Risk Evoultion Qual Page
Section A-3 Right side
ON the NSWC Training record, which side and where would you find...
MTS Qual Page and Cert
Section B Right side
ON the NSWC Training record, which side and where would you find...
MTS Qual Pages
Section B-1 Right side
ON the NSWC Training record, which side and where would you find...
Copies of MTS and CISO Evals covered in numbers 3, 4, & 5 no the MTS Quals page
Section B-2 Right side
ON the NSWC Training record, which side and where would you find...
Copy of MTS Cert
Section B-3 Right side
ON the NSWC Training record, which side and where would you find...
Signed origional CUIT
Section B-4 Right side
What is the NAVEDTRA 130
Task Based Curriculum Development
what is Phase 1 of the NAVEDTRA 130
Planning Phase
What does TPP refer to in Phase 1
Training Project Plan
What is the TPP
Blueprint for entire project
When is the TPP required
-New Course is Initialized
-Course is Canceled
-Course is Revised (Major Rev)
$10.000- or more
+/- Week to course
What does CCMM refer to
Course Curriculum Model Manager
The Planning Phase is Developed by Who
CCMM (CISO or Curriculum Experts)
The CCMM is Represented by who
NSWC Commanding Officer
Who is the TPP approved by
The (CCA) Curriculum Controll Athority
What are the chapters of the TPP
-Course Data
-Justification
-Safety Risks
-Curriculum Development Method
-Resource Requirements
-Compensation
-Plan Of Action and milestones POA&M
What is enclosed in the Course data section of the TPP
-CIN (Course ID Number)
-CDPC (Course Data Processing Code)
-Training Sites
-Training Type
-Work Center
-Purpose
-Occupational Classification/ Pre Reqs
-Course Overview
-Training Site Summary
Under the course data of the TPP what is the CIN for this course
CQT = K-060-00322
BCT = K-060-0031
Under the course data of the TPP what is the CDPC for
it is a site code for funding
Under the course data of the TPP what is BCT and CQT's traing type
BCT = A school
CQT = C school
Under the course data of the TPP what does the "Purpose" refer to
Statment on what CQT provides / purpose
Under the course data of the TPP what is the Occupational Classification Prerequisites for
to determine eligability for the initial or following steps in the training pipeline
Under the course data of the TPP what is the Course Overview for
Provides course Purpose, Testing Purpose, Ratios Curriculum Covered
Under the course data of the TPP what is the Training site summary for
shows
-Course Length
-Class Capacity
-Class Convenings
-Student Throughput
what is Justification under the TPP
Why is the TPP needed
What are 3 things you will find under Justification in the TPP
-Reference (discription of approval)
-Reason (source of Info)
-Impact if not approved
what is Safety Risks / Hazardous Materials Under the TPP for
Describes the directive guidance for use of tactics, munitions and equipment showing the necessity for RA's, EAP's,EB's and AG's. for the course
what 4 things would you find under the RRL
-Facilities
-Equipment
-Funding
-Personnel (manpower)
What does RRL Refer to and what phase would you find it
-Resource requirements list
-Phase 1
Who must the TPP be reviewed by for approval
The CCA (Curriculum Control Authority)
Who is CQT and BCT's CCA
WARCOM
What does PADDIE stand for
Plan
Analyze
Design
Develope
Implement
Evaluation
What is PADDIE for
Outlines the 6 phases of creating a high risk course
What is Phase 2
Analyze Phase
What document is produced in Phase 2
CTTL (Course Training Task List)
What is the most important doccument produced also known as the "Course Mission Statement"
the CTTL
What determines exactly what job course "graduates" are going ot be performing
The CTTL
Under the "Analyze Phase," all course content is determined based on what
the needs of the Job
Under the "Analyze Phase," what is the job made up of
Duties and Tasks
Under the "Analyze Phase," What supports the job
--Duties
--Must be observable and Measureable
Under the "Analyze Phase," what supports the Duties
--Tasks
Tasks must be observable and Measurable
Under the "Analyze Phase," what are the 2 levels of tasks
--Knowledge based
Classroom
--Skill based
Practical
Under the "Analyze Phase," Duties will always be what
Skill
Refrences are listed in the ________ to support each Duty or task
CTTL
What is phase 3 known as
Design Phase
What document is produced under phase 3
TCCD (Training Course Control Document)
What is the primary development & Management document for the course in phase 3
TCCD
Who is the TCCD reviewed by
the CCA - Warcom
What are the 3 major parts of the TCCD
-Front Matter
-COI (Curriculum outline of instruction)
-Annexes
Annex A-RRL
Annex B-CMS
Under the TCCD's 3 parts, the "Front Matter" consists of what
-Cover Page (Original and revised dates)
-Authorization to Teach Letter (issued after successful pilot( phase 5)
-Table of contents
-Forward
-Course Data (from TPP)
-Trainee Data
On the Front Matter of the TCCD the trainee Data has 4 requirements what are they and what do they ultimatly gain
-Physical Requirement
-Rating Requirement
-Clearance Requirements
-Obliserv Requirements
to gain
NEC Earned
In phase 3, under the COI, What are 3 things you would look for
-Course content organized in instructional order
-broken down into units and topics
-learning objectives support duties and tasks
Duties are also known as
Terminal objectives (TO's)
Tasks are also known as
Enabling objectives (EO's)
What are (TO'S)
-Terminal Objectives
-Developed from 1 or more Duties in the CTTL
-What the student will be able to perform by the end of the COURSE--unassisted or unsupervised
-the code unds in zero
Example--1.0, 2.0, 5.0 etc.
What are (EO's)
-Enabling objectives
-Developed by one or more Tasks form the CTTL
-Support other TO's or EO's
-Linked to TO's and end with a number other than zero
Exp. 1.1, 3.2, 5.7 so on.
-What the student will be able to perform by the end of the CLASS--assisted or supervised
Learning Objectives are made up of three parts, What are they
-Task or behavior
-condition
-Standard
Under phase 3, what are the 2 types of Annexes
Annex Alpha and Annex Bravo.
What is contained in Annex Alpha
-The RRL ( Resource Requirements List)
It is an expanded list of needs to support the course you might not have included in the initial RRL under the TPP.
What is contained in Annex Bravo
-Course Master Schedule (CMS)
-The CMS places the course in sequential order how the classes will be taught hour by hour
-Includes topic #, Class type, Period length, Ratio, Bottle neck ratio, and
What does bottle-neck ratio mean
Where you can not train all students at the exact same time
Exp.
-if the need for ratio is 1:1
and there are 40 students and only 8 instructors.
-if there is only 10 .50 Cal's and 55 students
-all students need stick time but you only have 4 boats in the water; you will have to cycle the students through
under phase 3; Annex Bravo,
what are the 4 types of training or periods
-Lab ( Assisted or Supervised)
-Practical Application (Unassisted or Unsupervised)
-Class room
-Special (Uniform inspection,Chow, Movement,PT etc.)
What is phase 4
Develope phase
What document is produced in Phase 4
CTM (Curriculum Training Materials)
Under phase 4 what are the 3 types of training materials used
-Lesson Plan
-Trainee Guide
-Tests
in the Develop Phase, what 4 things are in the LP (Lesson Plan)
-Programs the use of all other training materials
-Follows curriculum outline of instruction (COI)
-Supports LO's via Discussion points (left side of LP) and Related instructor activity (right side of LP)
-Provides equipment, media, and guidance required for trainee guide
Under the Develope phase, how many types of instructional sheets are there and what are they
-6
-Outline Sheet
-Assignment sheet
-Information sheet
-Problem sheet
-Job sheet
-Diagram sheet
What are the 2 types of tests in phase 4
Formal and Informal
Of the 2 types of tests in phase 4, what does the FORMAL test cover
TO's and EO's
Of the 2 types of tests in phase 4, what does the INFORMAL test cover
-less critical learning objectives via quizzes, homework, and practical work
-Does not factor into student's grade
Under the FORMAL test, there are 2 types of grading points, what are they
Performance and Knowledge
Under the FORMAL test, performance is a test of what
Skills and behavior
-product of knowledge (assembled and function checked 50 cal.)
-process ( steps were correct in assembly
-combination of both product and process
Under the FORMAL test, Knowledge tests what
-Theory and background
-Proper level of learning
-ablity to recognize, recall, comprehend and evaluate
Under the FORMAL test, in phase 4, what are the 5 test formats
-Multiple Choice
-T/F
-Matching
-Completion or missing word
-Essay
All tests utilize what 2 instructions for their grading criteria
Administrators Guide and Testing Plan
What is phase 5
Implement Phase
Prior to implementing phase 5, you should have done what
-Ran a pilot course
-First full length course used to valadate curriculum and training materials
In phase 5, the pilot course should have included what personnel
-SME's (subject matter experts)
-Trainees's
-Curriculum Manager
-Course manager
-CISO
At the end of the Pilot course in Phase 5, You should submit what
Pilot Monitoring Report (PMR)
Who is the Chop Chain of the Pilot Monitoring Report (PMR)
-CISO
-CCMM (CO)
-CCA (WARCOM)
Who is the final approval of the PMR
CCA (WARCOM)
The CCA is the final aproval of what 3 documents
-TPP
-TCCD
-PMR
After the CCA approves the pilot course and any changes needed, what is issued
Approval letter to teach
NETC (Naval ED TRA CMD) submits what 2 things
CANTRAC Data and NITRAS
What does CANTRAC stand for
Catalog of Naval Training Courses
What does NITRAS stand for
Naval Integrated Training Resource Administration System
The CANTRAC has 2 volumes what are they
V1=Training Facilities
V2=Course Description Data
What is important about NITRAS
- Big Navy Management tool
-consists of; Course throughput data,Logistic information, and stats
At the end of what phase is training good to begin at all sites
Phase 5, Implement phase
What is phase 6
Evaluate phase
What is the purpose of phase 6
To keep training current and accurate
What are some things you are looking for in the evaluation phase
-That training materials are constantly improving
-Ability to change requirements as needs change
-being open to innovation
During the Evaluation Phase, what 2 types of feedback are there
Internal and External
Under phase 6 list the 5 internal feedback criteria
-Formal Course Review
-TQI (Training Quality Indicator Reports)
-Student Evals
-Instructor Evals
-End of training reports
How often is the formal course review done under phase 6 and by whom
Conducted annually by the CISO office
How often is the TQI done under phase 6 and by whom
-Submitted Quarterly by the Course manager
-Reports training done,
-shortfalls
-safety training done
Who is the TQI ultimatly submitted to
Produced by the CISO and routed to the CO
Under the Evaluation phase, What 3 things would you find under external feedback
-Team Feedback
-After Action Reports
-Training Safety Evaluation Board (TSEB)
In Phase 6 What Is TSEB for
-Ensures course is being ran appropriatly
-Inspects all areas of Curriculum with a focus on training safety
-Couducted every 3 years
There are 4 types of changes in the evaluation phase, what are they
-Interim
-Change
-Technicial Change
-Revision
Under phase 6 what is an interim change
-Minor change, Type O fix etc.
-TPP not required
Under phase 6 what is a change
-Change where a TPP is not required
-A change page is required for all Safety, High Risk Documents and Curriculum Changes
Under phase 6 what is a Technicial Change
-Change in a tactical or training unique equipment or documentation
-May alter learning objectives
-TPP not required
-Change page required
Under phase 6 what is a revision
Changes in course mission statement, length, resources and funding requirements
-ALWAYS!!! requires a TPP
Under phase 6 who are the program participants
-Training Agency
NETC
-CCA
WARCOM
-Training Facility
NSWC
-CCMM
NSWC CO
What is the NAVEDTRA 134
Navy Instructor Manual
What is the NAVEDTRA 135A
Navy School Management Manual