• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/38

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

38 Cards in this Set

  • Front
  • Back

Who ensures adequate ordnance supervision is maintained during flight deck ordnance handling evolutions

Air Gunner / CVW ORD OFFICER

During ORD handling evolutions above second deck compliance with AFFF system and firefighting equip. is found in what pub

NAVAIR 00-80R-14

During ammo replenishment the application of electrical power is_____________, provided power is applied in accordance with existing model MIMs

Authorized

Airborne stores are what?

Fuel tanks, pods, non-expendable trading weapons, targets, racks, launchers, adapters, pylons

Airborne weapons are?

Missiles, rockets, bombs, mines, torps, pyros, ammo, guns, gun pods

An operation whereby a weapon is changed from safe to a state of readiness for initiation

Arming

The area where forward firing ordnance is armed?

Arming area

An area designated to change ordnance from a state of readiness to a safe condition?

Dearming area

An operation that removes weapons/ stores from and A/C

Downloading

Weapons/store that failed to drop or fire in flight?

Hung weapons

What airborne weapons have an intent to launch (ITL)

Harpoon, SLAM, JSOW

Where can you find guidance for weapons loading/strike down/downloading operations?

Appendix A of NAVAIR 00-80T-105

Who maintains a status board that confirms type, quantity, and location of all weapons on the flight deck and or aircraft

Air Gunner

Is simultaneous fueling, loading, downloading of weapons, preloaded IMER/ITER, PASE weapons, and installation of fuzes and arming wires authorized?

Yes

What can not be connected to the aircraft during Ordnance evolutions requiring electrical connections to A/C weapons systems?

Refueling hoses

LOX evolutions can be conducted simultaneously during downloading and loading. true or false

False, must be conducted separate

All ordnance evolutions shall cease when electrical storms are with ___ mile radius

Five

Can electrical power be applied to weapon release and controlled circuitry during loading and downloading?

No

Who retains final approval and authority for conducting A/C hot loading and 2.75 in rocket cold/hot tube loading aboard ship?

Commanding officer

What area on the flight deck is the preferred area to load AGM-114 hellfire and 2.75" rockets?

Spot 3 or 4

Who authorizes limited loading on the hanger deck provided operational necessity so dictates the acceptance of additional risk?

Commanding officer

Authorization for loading on the hanger deck shall be limited to aircraft scheduled for __________or _________ and is restricted to particular weapons indicated in __________

Next launch


Alert condition


Appendix A of NAVAIR 00-80T-105

Who clears personnel to approach the aircraft to perform weapons checks while the aircraft engines are turning?

Ordnance arming supervisor

What should be completed before the engines on that aircraft are started for launch?

The mechanical latching of racks/launchers

Final arming of forward firing weapons shall be done where prior to launch

Arming area

Actual arming may take place after the following conditions are met

Aircraft is forward of raised JBD



Flaps are in takeoff position



nose launch bar is retesting on top of shuttle



All personnel are clear or missile path

Arming signals shall be in accordance with the aircraft signals NATOPS Manual?

NAVAIR 00-80T-113

If an ITL weapon is verified, weapons crews should wait what amount of time before unloading

2.5 hours

If ITL must be downloaded before 2 hours has elapsed what must weapon crews do?

Wrap cargo strap or aircraft tie down chain around wings approx 3 inches aft of adapter cable receptacle

During an ITL, battery voltage will remain sufficiently high to allow engine start up for ____ mins

35

Priority staging areas for weapons are?

Flight deck outboard of island



Hanger deck



Sponsons

To minimize risk only that quantity of weapons required to sustain operations shall be transferred to hanger deck or flight deck. True or false

True

Weapons skids must be positioned what to what

Forward to aft

Stage areas shall be used for only what?

Ready service

A what by what area shall be established behind an ITL weapon?

3 foot wide by 8 foot long clear zone

Bomb rack cartridges shall be removed from all aircraft stations prior to or immediately after strike down of aircraft to hanger deck. True or false

True

Can cartridges remain in BRU 9/10/11 provided the rack is electrically disconnected and either the mechanical safety pin is installed or IFOBRL is in locked position

Yes

Armed aircraft with a emergency returning to the ship will be dearmed where immediately after landing?

Landing area