Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
82 Cards in this Set
- Front
- Back
Which of the following directives prescribes polices and procedures for administering the Coast Guard Paperwork management program?
|
COMDTINST M5212.12 (series)
|
|
What is a directive?
|
A military communication in which policy is established or a specific action is ordered
|
|
What chapter/section of DPRI listing identifies the order form to use to reqest updates, replacements, or new directives?
|
Chapter 1, section C
|
|
Where should you log the official changs issed to a directive?
|
Record of Changes Page
|
|
What is the reporting interval for the cutter engineering report?
|
every calendar year ending 31 Dec.
|
|
What is the reporting interval for Underwater Body Paint Report?
|
After each routine or emergency drydock.
|
|
Which how many days of an inspection are you required to submit the Boat Inspection Report?
|
10 Days
|
|
The original Drydocking and Underwater Body Inspection Work Sheet is submitted to?
|
MLC via NESU
|
|
Which report requires entis to ensure that the unit has maintained records for DEMPS or performance tests, bottom paint, OMS completions, and boat records?
|
Boat Inspection Report
|
|
Which report covers conducting inspections on Safety Items, Hull, Machinery/Electrical, and Administrative Programs and recording PMS completion percentages?
|
cutter Engineering Report
|
|
For WHEC, WMEC, WAGB class vessels, which report is required to be maintained by both the operations and engineering departments?
|
Tag-Out Log
|
|
What does the Coast Guard use to administer the configuration management process?
|
Engineering Change Request
|
|
Which report contains data that is used to preserve the continuity of operational history of a piece of equipment?
|
Machinery History
|
|
Which report is submitted by the unit to identify all maintenance work beyond the capability of the unit's assigned personnel?
|
Currents Ship's Maintenance Project
|
|
How long are units required to retain copies of Boat inspection reports?
|
3 years
|
|
What type of equipment casualty is reported on the Materiel Casualty Report?
|
Significant
|
|
A Casualty Report (CASREP) should be submitted for any equipment malfunction or efficiency that cannot be corrected within 48 hours and affects the unit's?
|
primary and secondary mission
|
|
Which information set identifies the message type and message originator information on a CASREP?
|
MSGID set
|
|
Pertinent identifying information about the CASREP equipment item being reported on is found in the ______ information set?
|
PARTSID
|
|
What number properly identifies a fourth Initial CASREP being forwarded by a unit in 2005?
|
INITIAL - 05004
|
|
Which type of information entered into the SSMP
|
Storm or casualty damage sustained by structures, utilities, or equipment.
|
|
What priority code should you use on an SSMR for a shore station maintenance project that is to be accomplished as part of a normal backlog?
|
3
|
|
The statement of work or SOW is used to measure ____ performance?
|
Contractor
|
|
For which of the following reasons would a change recommendation be made to an existing SSMR?
|
Safety issues
|
|
Who determines what procedures are used to make a change to the SSMR?
|
Sectors/Group SOPs
|
|
Who can cancel an Instruction? and how often does it get reviewed?
|
Originator or Higher Authority;
every 4 years. |
|
How many pages does a manual have?
|
25
|
|
Who are authorized to issue directives?
|
Commandant, (area, district, & group commanders), (commanders, MLC), (commanding officer, OINC)
|
|
What are the 2 basic purpose of SDL(standard distribution list)
|
1: Provides carious pieces of contact information for every Coast Guard unit (e.g. phone number, address, distribution symbol etc)
2: Provides instructions for correspondence handling throughout the Coast Guard. |
|
What is a DPRI
|
Directives, publications and reports index. It lists every directive issued by the CG and the required distribution for each directive.
|
|
What is NE-TIMS
|
Naval Engineering Technical Information Management System. an online database of specific directives, usually manufacturers' technical manuals that are used as primary reference material.
|
|
Where can you access NE-TIMS?
|
Through ELC website.
|
|
When can you cancel a directive?
|
A directive can be cancelled by another directive issued by the same originator or higher authority.
|
|
What is the purpose of a distribution symbol?
|
A code used to group units by type for the purpose of distributing directives and publications
|
|
Which manual publishes the complete list of CG units and their distribution symbols?
|
Standard distribution list
|
|
What form number is used to submit a detailed Boat Inspection Report?
|
CG-3022
|
|
What are the intervals for a detailed Boat inspection report?
|
not to exceed 1 year and be submitted 10 days after completion of inspection.
|
|
When is a special inspection report made?
|
In the case of a boat transfer and when a boat is disposed of.
|
|
what are the 4 sections of a detailed boat inspection report?
|
Header, Records Inspection, Waterborne Inspection, Inspection While Hauled Out.
|
|
What form number is used to submit a Cutter Engineering Report?
|
CG-4874
|
|
what is the time interval for submitting Cutter Engineering Reports?
|
annually covering a 12-month period ending 31 december.
|
|
How many and what sections are there in the Cutter Engineering Report?
|
7 Sections and they are:
1 - Safety Items 2 - hull 3 - Machinery/electrical 4 - Administrative Program 5 - Cutter engineering summary 6 - Remarks 7 - Remarks |
|
In Cutter Engineering Report, what section do you provide the completion status of PMS by division, main propulsion, auxiliary, etc...
|
Section 5
|
|
Sumbit this report no later than January 31; if at sea at the end of the reporting period, submit the report upon reaching a port.
|
Cutter Engineering Report
|
|
Who consists the Hull Inspection Board?
|
MLC/NESU representative
The Cutter's: -CO/OIC -1st LT. -EO/EPO |
|
What is the name of this form (CG-2926)?
|
Drydocking and Underwater Body Inspection
|
|
What is the name of this form(CG-4815)?
|
Underwater Body Paint report
|
|
When is the Hull Inspection Report and Underwater Body Paint Report required to be submitted?
|
After each routine or emergency drydocking before convening the third A-team meeting.
|
|
How many sections are there in the Hull Inspection Report? and what are they?
|
2 sections and they are:
Drydocking data & Inspections |
|
How many sections are there in the Underwater Body Paint Report? and what are they?
|
2 sections and they are:
Paint Performance & Paint Application |
|
Where do you put the compiler's name according to MLCLANT when submitting Underwater Body Paint Report?
|
On the lower left-hand corners of sections 1 and 2.
|
|
To whome do Boat Inspection Reports shall be submitted to?
|
MLC & District/AREA
|
|
To whome do Cutter Engineering Reports shall be submitted to?
|
MLC, and each intermediate commands & ELC
|
|
To whome do Drydocking and Underwater Body Inspection Work Sheet be submitted to?
|
MLC through NESU with copies for Operational Commanders
|
|
To whome do Underwater Body Paint Report be submitted to?
|
ML through servicing NESU with Copies for operational commanders.
|
|
What is the document entirely concerned with safety?
|
Tag-Out Log
|
|
How many Tag-out Logs are required for WHEC, WMEC and WAGB class vessels?
|
2
1 for Engineering and 1 for Operations. |
|
What is the prime means of preserving the continuity of the operational history of a piece of equipment?
|
Machinery History File
|
|
Who are required to maintain a Machinery History File?
|
All cutters & composite units(one file each for barge and pusher).
|
|
What are the contents of the Machinery History File?
|
Alteration of Machinery, Record of important part numbers, Ball bearing and packing size info & miscellaneous important info after an engine overhaul.
|
|
These are always entered in the Machinery log.
|
Machinery safety device deficiencies
|
|
What is an Engineering Change Request?
|
Used by CG to administer the configuration management process.
|
|
What is the Engineering Change Request Form Number?
|
CG-5682
|
|
Who funds an ECR?
|
Unit AFC-30: for low cost ECR
MLC AFC-4X: for medium cost Program Manager 3X/4X/AC&I: for High Cost |
|
What are the classifications of ECR?
|
Class A,B,C
A as the most urgent and descending. |
|
What is a CMA?
|
It is Corrective Maintenance Action. It is used to record and update unscheduled maintenance repair and casualties.
|
|
What is a CSMP?
|
Current Ship's Maintenance Project. An administrative method of tabulating all outstanding repairs and alterations for all cutters 65 feet and longer.
|
|
Units not equipped with CMplus maintain files on CSMP form number?
|
CG-2920 or equivalent.
|
|
What is a SSMR?
|
Shore Side Maintenance Record. A request for maintenance assistance which the local unit cannot perform.
|
|
what is the form used for SSMR?
|
CG-4094
|
|
How many copies of SSMR are routed? and to whom?
|
5 copies.
one for local unit one for Group/ISC/CEU/Sector one retained by CEU one forwarded to district or area one returned to unit by CEU |
|
How many Boat Records are required for each unit?
|
one for each boat assigned to a unit.
|
|
What is the Boat Record form number?
|
CG-2580A
|
|
How many sections are there in the Boat Record? and what are they?
|
Six sections. They are:
1 - Boat Record Book 2 - Boat Inspection Reports 3 - Casualty Reports and Casualty Correction 4 - Engineering Changes Pending 5 - Engineering Changes completed 6 - Pending CSMP's |
|
What are the two requirements for setting up the Machiner History File?
|
One form is completed for each piece of equipment which is listed on MICA. Forms to be indexed same way in MICA
|
|
When maintaining the Machinery History File, what information should you include pertaining to each entry?
|
Date, Summary of Data & Operating Hours
|
|
CMA's are used to record and update unscheduled maintenance for what two items?
|
Repairs & Casualties
|
|
What are the categories of casualty for casreps?
|
Category 2 - 3 - 4
2 having minor degradation of primary mission and total loss of secondary mission. 3 causes a major degradation but not the loss of a primary mission. 4 is worse than 3 and causes a loss of at least one primary mission. |
|
when to submit a CASCOR?
|
as soon as possible, after the casualty is corrected
|
|
When to cancel a CASREP
|
CASCAN's are transmitted when the Initial CASREP action is canceled and teh equipment will not be repaired following standard operating procedures.
|
|
What is the purpose of CASREPs
|
To inform GROUP/DISTRICT/AREA/
COMMANDS informed on the readiness of a unit. |
|
what should be in the FIRST line of the "description of work" block of an SSMR?
|
Short Project Title
|