• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/3

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

3 Cards in this Set

  • Front
  • Back

MGMT 340 Final Exam Answers

MGMT 340Final Exam Answers (TCO 1) Whendeveloping information systems, an organization could use: (TCO 1) Thepractice of turning over responsibility of some or all of an organization’sinformation systems applications and operations to an outside firm is referredto as: TCO 2)Identifying, assessing, and managing the risks and day-to-day changes thatoccur during a project best defines which of the following project manageractivities? (TCO 2)Which of the following is NOT a project management phase? iĕBa

MGMT 340 Final Exam Answers

(TCO 2)Which of the following would be classified as an intangible cost? (TCO 2) Theprimary deliverable from the project identification and selection phase is: (TCO 3) Theterm that refers to systems development projects bogged down in an abundance ofanalysis work is:

MGMT 340 Final Exam Answers

(TCO 3) Goodinterview guidelines consist of (TCO 3) Thesearch for, and implementation of, radical change in business processes toachieve breakthrough improvements in products and services best defines: (TCO 3) Thepurpose of requirements structuring is to (TCO 4) The diagramthat shows the scope of the system, indicating what elements are inside andoutside the system, is called a: (TCO 5) Thenumber of instances of entity B that can (or must) be associated with eachinstance of entity A refers to: (TCO 6)Shaping alternative system design strategies involves: (TCO 7)Which of the following are general guidelines for displaying tables and lists?