Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
23 Cards in this Set
- Front
- Back
1 |
Risk assessment & park van |
|
2 |
Knock on door & intro |
|
3 |
Meter location + visual check for any problems inc tampering etc. |
|
4 |
Take meter reading and details such as serial number and compare with HHT |
|
5 |
Identify live metalwork via VT7 |
|
6 |
Martindale socket plug test. 3 or more problems call SMT. Anything less leave warning notice. |
|
7 |
Ask customer to switch off any sensitive equipment. |
|
8 |
Turn off consumer unit |
|
9 |
Cut sealing wires |
|
10 |
Check air tight Rubber gloves and visor then pull fuse out and check fuse |
|
11 |
Check polarity on cut out then remove neutral case and check polarity |
|
12 |
Put shroud. Tighten any loose screws. |
|
13 |
Take meter cover and any other covers such as blocks or isolators then fuse back in. |
|
14 |
Check polarity on meter and any blocks etc with VT7 |
|
15 |
Shroud back in and dead test with glow lamp. If no neutral step test is ok |
|
16 |
Rubber gloves + visor off and mark cables |
|
17 |
Check cables from consumer unit are secure and change meter |
|
18 |
Live and neutral id stickers and make sure installation is sound |
|
19 |
Rubber gloves on. Fuse back in. Check polarity with VT7
|
|
20 |
Take fuse out and put covers back on. Seal and crimp Tidy up |
|
21 |
Warn customer before turning on consumer unit |
|
22 |
VT7 check at metal work then non intrusive volt stick test. |
|
23 |
Socket test. Last visual safety checks |