• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/25

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

25 Cards in this Set

  • Front
  • Back
how much clearance from the top of the boiler is needed for a HP boiler that produces 700,LBS of steam?
7 feet.
on a gas fired boiler the proper gas to air mixture is ?
30%-70% and in special arrangement it can be as high as 100%.
what is the total hardness in a system that was found to have calcium (2.5) hardness of 60 ppm, and margnesium (4.1) hardness of 18ppm, and carbon hardness of 12 ppm?
hardness formula calcium x2.5+magnesium x4.1
what is the recommended time for complite external inspection of boiler ?
answer /daily /weekly,PG446 study chart
with 24 hrs operation , how often do you check the water level?
Once per shift .
how often do you check the LWCO?
Once per shift.
how often do you check the high limit swith?
Annually
A 2''pipe was found to be delivering water at 100 psia at 1040ft per second. how many gollons per hrs will it deliver?
? GPM=V (diamete squared)
/divided by.4085 answer pg 469 BOG.
what controls the amount of blowback on a safety valve?
Blowback ring or adjusting or ring.
O a open air explansion tank, hot water boiler system,how high should it be mounted?
4 ft above hightes heating element.
what is the minimum top clearance of boiler with manhole?
3 ft package boilers,steam heating boilers and hot wter boilers shall have minimum clearance of 2 ft from ceiling.code chapter 10 pg 76
most important safety device?
safety relief valve.
what does a Black Liquor boiler do?
black liquor is the by product of wood pulp processing in the paper making industry.Known for production of steam and soda ash 58% solids needed to sustain combuction.
Under what code are boilers designed and constructed?
ASME-CSD1 NFPA 8501,8502,8504.
How many low water cut offs are needed per code for a hot water system?
when a boiler has inputs grearer than 400,000 btu per hr,LWCO is needed.
what is the minimum and size for a safety valve per code for boiler?
minimum 3/4'' and maximum 4 1/2''
what stamp is put on a boiler after repair?
''R''
what is the equalizing system?
the equalizing system is for warming up the steam lead.
a blowdown valve is located at the lowest water space of aboiler for three purposees ?
1-to remove precipitated sludge or loose scale. 2 to permit rapid lowering of the boiler water if it has became too high accidentally.3 as a means of removing water from the boiler so that fresh water may be added to keep the concentrtion of solids below the point where difficulties may be experienced.
after opening a boiler for repairs, how much oxgen is needed?
19%
what is the first thing you when shutting down a boiler?
turn off/extinguish fire.
what is the legal limit of acceptable asbestos particles?
0.1 fibers per cubic centermeter.
what is CREEP?
creep is defined as the slow deformation of material with time,with the deformation taking place at elevated temps with no increase in stress.small hairline crack.
what is BTU content of Anthracite coal?
14000 BTUS.
what substance transfers electrical current in a photocell?
Electricity will flow when the CADMIUM is exposed to sufficient light.