Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
5 Cards in this Set
- Front
- Back
Intent of Building level Energy monitoring? |
to make building accountable for comprehensive energy, and to track on-going energy efficiency. |
|
What are the two parts of the building metering? |
Metering and Reporting. |
|
What is the requirement for the metering |
Install new or use existing building-level energy meters, or submeters that can be aggregated to provide building-level data representing total building energy consumption (electricity, natural gas, chilled water, steam, fuel oil, propane, biomass, etc). |
|
What is the commitment period and interval of Energy monitoring? |
5 years commitment for data, at one month intervals, beginning on the date the project accepts LEED certification or typical occupancy, whichever comes first.
|
|
How to report online for Energy monitoring. |
either send their data to the USGBC when requested, or
report online through the EPA’s Energy Star Portfolio Manager program. |