• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/10

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

10 Cards in this Set

  • Front
  • Back
What is the intent of SS Prerequisite 1- Construction Activity Pollution Prevention?
Reduce pollution from construction activities by controlling soil erosion,waterway sedimentation and airborne dust generation.
What is the intent of SS 1 Site Selection?
Avoid development of inappropriate sites and reduce the enviromental impact from the location of a building on a site.
What is the intent of SS 2 Development Density & Community Connectivity ?
Channel development to urban areas with existing infrastucture, protect greenfields and preserve habitat and natural resources.
What is the intent of SS 3 Brownfield Redevelopment ?
Rehabilitate damaged sites where development is complicated,reducing pressure on undevelopment land.
What is the intent of SS 4.1 Alternative Transportation ,public Transportation Access and SS4.2 Alternative Transportation,Bicycle Storage & Changing Rooms andSS 4.3 Alternative Transportation,Low Emitting & fuel efficient Vechicles ?
Reduce pollution and land development impacts from automobile use.
What is the intent of SS 4.4 Alternative Transportion ,parking capacity ?
Reduce pollution and land development impacts from single occupancy vehicle use.
What is the intent of SS 5.1 Site Development, Protect or restore Habitat ?
Conserve existing natural areas and restore damaged areas to provide and promote biodiversity .
What is the intent of SS 5.2 Site development, Maximize Open space ?
Provide a high ratio of open space to development footprint to promote biodiversity.
What is the intent of SS 6.1 Stormwater Design Quantity Control ?
Limit disruption of natural hydrology by reducing impervious cover,increasing on-site infiltration, and managing stormwater runoff.
What is the intent of SS 6.2 Stormwater Design Quality Control ?
Reduce or eliminate water pollution by reducing impervious cover,increasing onsite infiltration sources of contaminants,and removing pollutants from stormwater runoff.